Loading...
HomeMy WebLinkAbout15 Pipeline Replacement - Bid AwardAGENDA ITEM# 15 Page 1 of 2 MEETING DATE:March 25, 2021 TO:Board of Directors FROM:Neil Kaufman, Water Systems Engineer SUBJECT:Award of the District Pipeline Replacement –2021 Construction Contract APPROVED BY______________________________ Brian C. Wright, Interim General Manager RECOMMENDATION: Award the District Pipeline Replacement –2021 project to Rapid Construction and authorize the Interim General Manager to execute a construction contract in the amount of $1,123,321.10,plus a ten percent change order allowance of $112,678.90,for a total amount not to exceed $1,236,000. BACKGROUND: The Water Department has an ongoing need to replace existing water pipelines that fall into two basic categories. 1)Pipes that are in poor condition and require repeated repairs 2)Pipes that are old, undersized (typically 4-inch diameter and smaller) and have exceeded their useful life The District Pipeline Replacement –2021 project covers about 3,750 feet of pipeline at three locations in the Tahoe Donner subdivision: Northwoods Boulevard, south of the driving range Muhlebach Way & Falcon Point Place Snowpeak Way & Matterhorn Place These pipeline segments are shown on the attached figure. The bid opening was held at 2:00 PM on March 25,2021.Seven bids were received: Page 2 of 2 TOTAL AMOUNT OF BID Bidder Location Amount Responsive Rapid Construction Carson City, NV $1,123,321.10 Yes Aspen Developers Reno, NV $1,258,519.00 Yes Vinciguerra Construction Sutter Creek, CA $1,320,832.00 Yes Burdick Excavating Carson City, NV $1,326,908.00 Yes Longo Tahoe City, CA $1,494,495.50 Yes C&D Contractors Nevada City, CA $1,499,803.00 Yes McGuire & Hester Alameda, CA $1,533,965.00 Yes In addition to the construction contract, the District will retain outside consultants to perform construction inspection,environmental services and geotechnical testing for this project. The costs for this work are: Construction Inspection –CME –Estimated at $50,000 Environmental Services –Inland Ecosystems –Estimated at $4,000 Geotechnical Testing –NV5 –Estimated at $30,000 OBJECTIVES: In addition to infrastructure life-cycle replacement, this project also supports the District’s overall goal to reduce unaccounted for water loss and establish overall improvements in system efficiency. Specifically, District Goal 3.4 is applicable: 3.4. Conduct effective and efficient operations, maintenance, and replacement programs. 3. Provide reliable and high quality water supply and distribution system to meet current and future needs. FISCAL IMPACT: The Board Adopted Budget (AB)in fall of 2019 included Water 2021 Capital Expenditures of $2,009,000. This budget did not include the pipeline replacement project and assumed an annual water rate increase of 3%. However, the approved 10-year water capital infrastructure replacement study includes pipeline replacements for FY2021 and the recently approved water rate schedule includes an increase of approximately 9% for FY 2021 to fund the additional capital expenses. Water 2021 Capital Expenditures Forecast for 2021 is $3.1M, for a variance to AB of $1,091,000.The funding source for this project is rates. The water rates increase for 2021 generates and estimated incremental $770,000 and savings in Water SCADA and Facility Metering projects for 2021 compared to AB are estimated at $200,000, combining for a total of $970,000.The remaining gap of up to $121,000 (assuming 100% of contingency of $113k utilized) would be funded from operating reserves balance. ATTACHMENTS: Figure 1