1. WHY THIS MATTER IS BEFORE THE BOARD
This workshop is to review the District's actual versus budgeted purchase power costs and
energy consumption for 2014.
2. HISTORY
On September 18, 2013 the workshop "FY14 and FY15 Budget: Purchase Power Plan" was
presented to the Board. This workshop covered the following topics:
Mission Statement and Objectives, Renewable Portfolio Standard Target, Conservation as First
Resource, Diversified Power Supply Plan, Future Renewable Resources, CARB Cap and Trade,
Proposed Resources for 2014 & 2015, Risk to Budget Analysis and 2014 & 2015 Forecast Costs,
The Purchase Power Plan 2014 and 2015 Budget was approved by the Board on November 20,
2013. The 2014 Purchase Power Plan budgeted amounts, based on a forecasted energy
purchase of 164,713 MWh, are shown in the following table:
Cost Component Budget $per MWh
Total Energy Supply -Various $1111913445 $67.95
Transmission Wheeling - SPPC $ 17204,628 $ 7.31
Scheduling - NCPA
Central Valley Project - WAPA
Totals
$ 75,423 $ 0.46
$-281012 $ -0.17
$125443,484 $75.55
Historical data for 2014 and prior years to 2005 is included for reference on Attachment A.
3. NEW INFORMATION
Summary budgeted versus actual amounts for 2014 are shown in the following table:
Description Budget Actual
Total Energy Purchases $12,443,484 $11;552,145
Total Energy Consumption, MWh 164,713 158,245
Purchase Cost per MWh $75.55 $73.00
• The total purchased power costs were 7.2% less than budgeted and total energy
consumption was about 3.9% less than forecasted during 2014. The two major factors that
affect the total purchased power cost are resource cost and energy consumption by our
customers.
All these factors helped to reduce the District's actual purchased energy cost to $73.00 per MWh,
about 3.4% under budget. Energy costs and consumption by month are graphically depicted
below.
Budaeted versus actual cower purchase cost for 2014 is shown in graph below:
FY14 Power Purchase Cost
$14,000,OOD
$12,000,ODO
$10,000,000
$s,00O,000
$6,000,000
�4,000,oa0
�z,000,oa0
$o
-�z,000,Doo
Scheduling
� WAPA cost/credit)
� Transmission
� Total Energy Supply
Budgeted versus actual monthly MWh consumption for 2014 is shown in graph below:
- •
MWh
....
:...
... I E Budgeted
.... I
I ,
I ,
.... I ,
... JAN FEB MAR APR MAY JUNE JULY AUG SEPT OCT NOV DEC
I ,
I ,
The Monthly Peak MW for 2008 through 2014 is shown in the graph below:
Monthly Peak MW
2008 thru 2014
40.0
35,0
MO
25.0
20.0
15.0
10.0
5.0
0.0
!AN FEB MAR APR MAY TUNE lULY AUG SEP� OCf NOV DEC
2014 Peak
MW
■
2013 Peak
MW
■
2012 Peak
MW
2011 Peak
MW
■
2010 Peak
MW
■
2009 Peak
MW
2008 Peak
MW
The District experienced its 2014 peak load of 36.1 MW in December. The summer months have
a constant load with a small peak in July.
History of Actual vs. Budget vs. Sales (MWh)
Total Bulk Power
Actual vs Budget vs Sales MWh
170,000
160, 000
150,000
--�—Actual MWh
�E9udget MWh
Salves MWh
120, 000
Annual Graph of Resources used for 2014
inspecified Pool
44%
I�G
Resources (MWh) by Year 2014 — 2025
1ao,aoo
160,000
140,OCC
1zo,aco
100,000
60,000
40,000
zo,000
0
Resources (MWh) By Year 2014 - 2025
with Kern River Waste Heat 2017 &
2017-2022 Market Purchase
\I
,yo do ,yo ,yo ,vo do ,yo ,yo ,�o do ,yo do
■ Natural Gas
Small Hydro
6% ■ Unspecified
Landfill Gas pool
15%
Small Hydro
Wind
27% ■ Landfill Gas
■ Wind
Open Position -DAMPS Pool /Mkt
Kem River Waste Heat 2017
u Horse Butte Wind - Wind
Payson - Natural Gas
■ Pleasant Valley - Wind
■ Fallon Exchange for Stampede
■ Stampede -Small Hydro
Trans Jordan - Land Fill Gas
- Five-year Market 2017-22 (New)
■ Five-year Market 2012-17 (Exist)
On December 7, 2011 the Board approved the Renewable Energy Resources Procurement Plan
per Senate bill U2. This plan defines the minimum required percentage of renewables per
compliance period based on total retail energy sales. Compliance periods and percent
renewables are as follows:
Period 1 - January 1, 2011 through December 31, 2013 - 20%
Period 2 - January 1, 2014 through December 31, 2016 - 25%
Period 3 - January 1, 2017 through December 31, 2020 - 33%
Section 3201 (bb) of the CEC regulations define retail sales as: "Sale of electricity by a PUD to
end -use -customers and their tenants measured in MWh. This does not include energy
consumption by a POU electricity used by a POU for water pumping or electricity produced for
onsite consumption (self -generation)." Therefore the retail sales for this calculation is equal to
1421584-71637490=1345457 MWh
The District's estimated renewable energy portfolio performance for 2014 is shown in the table
below:
Eliaible Renewables (CPUC
Small Hydro
Landfill Gas
Wind
Solar
Totals
MWh REC's
3,000
23,326
43,753
0
70,079
Sales
2.2%
17.3%
32.4%
0.0%
5109 %
4. FISCAL IMPACT
Detailed budgeted versus actual amounts for 2014 are shown in the following table:
Power Purchases, MWh
Total Energy Purchase, MWh
Percent Difference, Actual vs. Budget
Percent Difference, Actual vs. Budget
Budget
164,713
Actual
158,245
-3.9%
Power Purchase Costs Budget Actual
Total Energy Supply - UAMPS, WAPA, etc $11,191,445 $10,941,923
Transmission - NV Energy
Scheduling - NCPA
WAPA cost/(credit)
NCPA Power Purchase
Misc Costs: WECC, WREGIS, etc.
Total Power Purchase Cost
$ Over/(Under) Budget
Percent Difference, Actual vs. Budget
Purchase Cost per MWh
Percent Difference, Actual vs. Budget
$1,204,628
$75,423
($282012)
$ 12,443,484
$75.55
$535,631
$33,766
($7,642)
$0
$48,468
$ 11, 552,145
$ (891,339)
-7.2%
$73.00
-3.4%
Peak Load Information Budget Actual
District Peak Load, MW 36.0 36.1
Percent Difference, Actual vs. Budget
5. RECOMMENDATION
Receive and comment on this report.
Stephen Hollabaugh Michael D. Holley