Loading...
HomeMy WebLinkAbout9-1, Attachment SCADA Phase 3Description Qty Units Unit Price Subtotal Qty Units Unit Price Subtotal 1 Mobilization 1 LS 8,000.00$ $ 8,000.00 1 LS 8,000.00$ $ 8,000.00 2 TD466 Communication Vault with FT Cover & Conduit, SW Detail A 1 LS $13,000.00 $ 13,000.00 1 LS $13,000.00 $ 13,000.00 3 B3048 Communications Box, Traffic Cover & Conduit, SW Detail B 1 LS 4,600.00$ $ 4,600.00 1 LS 4,600.00$ $ 4,600.00 4 3" Conduit between Communication Boxes, SW Detail C 1 LS 3,600.00$ $ 3,600.00 1 LS 3,600.00$ $ 3,600.00 5 2" Conduit between Communication Boxes, SW Detail D 1 LS 5,000.00$ $ 5,000.00 1 LS 5,000.00$ $ 5,000.00 6 12ct Loose Tube Fiber Optic Cable in Existing CS 2,200 FT 2.20$ $ 4,840.00 2,392 FT 2.20$ $ 5,262.40 7 48ct Loose Tube Fiber Optic Cable in Existing CS 27,500 FT 2.50$ $ 68,750.00 23,112 FT 2.50$ $ 57,780.00 8 144ct Loose Tube Fiber Optic Cable in Existing CS 7500 FT 3.84$ $ 28,800.00 6996 FT 3.84$ $ 26,864.64 9 216ct Loose Tube Fiber Optic Cable in Existing CS 7,700 FT 4.30$ $ 33,110.00 7,054 FT 4.30$ $ 30,332.20 10 Splice Closure - 216 Capacity 3 EA 3,951.00$ $ 11,853.00 3 EA 3,951.00$ $ 11,853.00 11 Splice Closure - 96 Capacity 8 EA 3,796.00$ $ 30,368.00 8 EA 3,796.00$ $ 30,368.00 12 Fusion Splices 1200 EA 25.00$ $ 30,000.00 1200 EA 25.00$ $ 30,000.00 13 Termination Equipment - 6170 Tank 1 LS 4,268.00$ $ 4,268.00 1 LS 4,268.00$ $ 4,268.00 14 Termination Equipment - Prosser Heights W ell 1 LS $8,061.00 $ 8,061.00 1 LS $8,061.00 $ 8,061.00 15 Termination Equipment - China Camp Pump Station 1 LS $10,581.00 $ 10,581.00 1 LS $10,581.00 $ 10,581.00 16 Termination Equipment - Fibreboard W ell 1 LS 6,543.00$ $ 6,543.00 1 LS 6,543.00$ $ 6,543.00 17 Termination Equipment - Prosser Village W ell 1 LS 5,447.00$ $ 5,447.00 1 LS 5,447.00$ $ 5,447.00 18 Fiber Testing 1 LS 48,420.00$ $ 48,420.00 1 LS 48,420.00$ $ 48,420.00 19 All Other W ork Required by the Contract Documents 1 LS 2,800.00$ $ 2,800.00 1 LS 2,800.00$ $ 2,800.00 Total $328,041.00 Total $312,780.24 Analysis of Bid vs. Actual Quantities Constructed SCADA Reliability Imrpovement Project Phase 3 Contractor: Curtis and Sons Construction, Inc. Bid Item Bid Amounts Actual Amounts A ttachment 1