HomeMy WebLinkAbout12-1 Attachment E3SummaryReport_2014Progra m Sect o r
(U sed in CEC
R eport)C ategory
U nits
In stalled
G ro ss
Ann u al
Energ y
S avings
(kW h)
G ro ss
Lifecycle
Energ y
S avings
(kW h)
N et
D em an d
S avings
(kW )
N et
C o inciden
t Peak
S avings
(kW )
N et
An n ual
E n ergy
Savings
(kW h)
N et
L ife cycle
E n ergy
Savings
(kW h)
N e t
Lifecycle
G as
Savin g s
(MM Btu)
N et Lifecycle
GH G
R eductions
(Tons)
U tility
Incentives
C ost ($)
U tility Mktg ,
EM &V, a n d
Ad min C o s t ($)
Total U tility
C ost ($)
App liances Res C lothes W as h ers
H V A C R es C o oling
App liances Res D is hw as her s 1 82 ,247 1,069 ,21 1 2 2 62,508 812 ,600 29,89 7 409 $50 ,575 $16 ,7 10 $67 ,285
C o ns um er Electronics R es Elec tronic s
H V A C R es H e ating
Lighting Res Ligh ting 8 1,6 09 ,727 15,532 ,785 65 65 1 ,0 85,976 10,452,993 67 ,939 5,260 $16 8,759 $277 ,396 $446,155
Poo l Pum p Res Poo l Pum p
R e frige ratio n Res R efrigeration 1 1 5 9,642 798,21 0 17 17 110 ,951 55 4 ,7 56 3 0 1 $1 4 ,439 $4 ,7 71 $19,210
H V A C R es Shell 2 2,612 4 7 ,664 6 6 2,109 38,604 1 ,4 19 22 $3 ,937 $1,301 $5,23 8
W ater H eating Res W ater Heatin g 1 194 2,522 15 3 1,99 2 1 $132 $44 $17 6
C o m pre hen s iv e R es C om preh e nsive
Process N on-R es C o o k ing
H V A C N on-R es C o oling
H V A C N on-R es H e ating
Lighting Non-Res Ligh ting 3 19 0 ,928 2,243,710 31 31 1 42 ,678 1,761,34 6 9 8 8 $37 ,5 43 $19,073 $5 6,616
Process N on-R es M otors
Process N on-R es Pum p s
R e frige ratio n Non-Res R efriger ation 1 1 1 3,551 567,755 6 6 76,079 38 0,39 6 2 0 1 $3 3 ,0 22 $6 ,1 75 $39 ,197
H V A C N on-R es Shell
Process N on-R es Process 6 250,819 2,205 ,106 38 3 8 206,998 1,766 ,5 74 9 3 9 $9 6,57 0 $99 ,6 24 $1 96,194
C o m pre hen s iv e N on-Res C om p rehensiv e
Other O ther
Sub T otal 23 2,40 9,72 0 22,466 ,9 63 1 65 1 6 5 1,687,453 15,769 ,2 61 99,255 8,120 $404,977 $425,093 $8 3 0 ,0 70
T&D T &D
Total 23 2 ,40 9,720 22,466 ,963 1 65 1 6 5 1 ,687,45 3 15,76 9 ,261 99,255 8,120 $4 0 4,9 7 7 $425,093 $8 30 ,070
EE P rogram Portfolio TRC T es t 2.7 2
P A C Test 2.7 2
Resource S avings Sum m aryTruckee D onner C ost Sum m ary