Loading...
HomeMy WebLinkAbout8 Award 2015 Airport Well Maintenance ContractAgenda Item #8 T o: From: Date: Subject: Board o f Directors Brian Wrig ht April 15, 20 15 Considerat ion of t he Award of the 2015 Airport Well Maintenance Contract C ONSE NT 1. WHY T HIS MAT T ER IS BEFORE T HE BOARD Board approval is requi red for al l expenditures in excess of $15,000. 2. HIST ORY Airport W el l is one of the Di strict's l a rgest groundwater producti on wel l s and an essenti a l potable water source during the s ummer demand cycl e. Hi storically, the well pump, motor and l i ne shaft require perio dic inspecti on, maintenance and repair. Based on current pump and motor performa nce anal ysis, Staff has determined the need for the Airport W ell pump and motor to b e pul l ed for i nspecti on and mai ntenance services. In November 2012, staff purchased a replacement well l ine shaft, with associated fi ttings, to be kept on hand fo r future maintenance. T his line shaft assembl y i s avai lable fo r i nstallation if n ecessary. 3. NEW INFORMAT ION On March 18, 2015 the Di strict publ i cl y adverti sed a request for bids for the 2015 Airport W ell Mai ntenance Project. The project scope o f work incl uded: The inspecti on and mai ntenance of the Airport W ell pump and motor assembl y; Replacement of the wel l line shaft assembl y; and Video inspecti on of well casing and axi a l alignment survey of the wel l casi ng. The bi d openi ng was held on April 8, 2 015. T he Distri ct recei ved one responsi ve bid from Carson Pump Co. i n the amount of $21,8 00. 4. FISCAL IMPACT Sufficient funds for the 2015 Airport W el l Maintenance Project are available i n the Board approved FY15 W ater Operati ons Budg et. Michael D. Holley General Manager / W a ter Utili ty Manager 5. RECOMMENDAT ION Award a contract for the 2015 Ai rport W ell Mai ntenance Project to Car son Pump Co., i n the amount of $21,800 plus a 10% contin gency, fo r a total amount not to exceed $23,980 .