Loading...
HomeMy WebLinkAbout12 Consideration of Fleet Repair from Silver State Truck ServiceAgenda Item #12 T o: From: Date: Subject: Board o f Directors Jim Wilson May 20, 2 015 Considerat ion of F le et Repair from Silver State T ruck Services C ONSE NT 1. WHY T HIS MAT T ER IS BEFORE T HE BOARD Board approval is requi red for expendi tures ov er $15,000. 2. HIST ORY Uni t 211 is a 1996 International chassis wi th an Altec two-man aerial l i ft bucket. This vehicl e i s not schedul ed for replacement unti l 2019. Bucket trucks are a criti cal part of the Distri ct 's electric crews and their ability to work on energized power line s. Uni t 211 suffered an engine fai lure which al lowed coolant into the engine oi l . This i ssue necessitated that the vehi cle be towed to Silver State International in Sparks, NV for eval uation. 3. NEW INFORMAT ION In order for Si l ver State International to troubl eshoot th e issue and exte nt of damages, a partial dismantle the engi ne was re quire d. Silver State discovered a damaged cylinder sleeve, which i n conjunctioin wi th the mileage and run hours on the vehicle, necessitated an i n-frame engine rebui l d . The tota l repai r was $14,589.64. 4. FISCAL IMPACT The fi nal cost to repai r this vehicle is ab ove th e authori zed spending limit of the General Manager and requires Board ap prova l . Suffi cient funds exist i n the FY15 Budget for th is repair . Unfortunately, no othe r di agnosti cs could be completed until the rebuild was compl ete. W hen unit 2 11 was test dri ven, t hey disco vered oi l leaking from the oil cooler. The add itional l abor and materials cost i s $79 5.54 whi ch brought the total repair cost Stephen Hollabaugh Mi chael D. Holley Assistan t General Mana ger General Manager 5. RECOMMENDAT ION Authori ze vehicl e repairs at Si l ver State Intern ati onal fo r Fleet Repai r, for a total not to exceed amount of $15,386.