Loading...
HomeMy WebLinkAbout10 Traffic Control ServicesAgenda Item # 10 CONSENT To: Board of Directors From: Steve Trevino Date: June 089 2015 Subject: Consideration of an Award of a Contract for Traffic Control Services 1. WHY THIS MATTER IS BEFORE THE BOARD Board approval is required for procurements in excess of $15,000. 2. HISTORY The Electric Department requires periodic traffic control services for construction and maintenance projects along certain thoroughfares in the District's service territory. Temporary lane closure and lane shifting will be required for the following projects. • Northwoods Blvd. Rebuild - Phase 1: Northwoods Blvd. from Donner Pass Road to Lamplighter Way (replace poles and re -conductor 26 spans) • Alder Creek Drive Rebuild: Alder Creek Drive from Fjord to Wolfgang Way (replace 15 poles) • Glenshire Drive Underground Extension: install underground cable approximately 1 3/4 Miles to the Glenshire subdivision 3. NEW INFORMATION On May 27, 2015 the District publicly advertised a request for proposals for traffic control services. Sealed proposals were due on June 3, 2015. The District received two proposals; Road Safety Services and Traffic Management Inc. Staff has reviewed the submitted proposals and has determined Road Safety Services to be responsive and in compliance with all District specifications. An overview of the cost proposal is provided below: Safety Road Services -Cost Proposal Lane Closure Hourly Rate $143.25 Lane Shift Hourly Rate $105925 Hourly Rates include labor and daily setup and removal of equipment 4. FISCAL IMPACT Sufficient funds for the cost of traffic control services are available in the Board approved FY15 Electric Operations Budget, 5. RECOMMENDATION Award the traffic control services bid to Road Safety Services and authorize the General Manager to enter into a contract for an amount not to exceed $60,000, HzmA WEV, AM ew� Stephen Hollabaugh Assistant General Manager Michael D. Holley General Manager