Discussion of 2015 Purchase Power Load,Resources,Peaks,and
Comparison to 2015 Budget Forecast
1.WHY THIS MATTER IS BEFORE THE BOARD
This workshop is to review the District's actual versus budgeted purchase power costs
and energy consumption for 2015.
2.HISTORY
On September 18,2013 the workshop "FY14 and FY15 Budget:Purchase Power
Plan"was presented to the Board.This workshop covered the following topics:
Mission Statement and Objectives,Renewable Portfolio Standard Target,
Conservation as First Resource,Diversified Power Supply Plan,Future Renewable
Resources,CARB Cap and Trade,Proposed Resources for 2014 &2015,Risk to
Budget Analysis and 2014 &2015 Forecast Costs.
The Purchase Power Plan 2014 and 2015 Budget was approved by the Board on
November 20,2013.The 2015 Purchase Power Plan budgeted amounts,based on a
forecast energy purchase of 164,729 MWh,are shown in the following table:
Cost Component Budget $per MWh
Total Energy Supply -Various $11,331,030 $68.79
Transmission Wheeling -SPPC $1,216,674 $7.38
Scheduling -NCPA $75,423 $0.46
Central Valley Project -WAPA $-28,012 $-0.17
Totals $12,595,115 $76.46
Historical data for 2015 and prior years to 2005 is included for reference on
Attachment A.
3.NEW INFORMATION
Summary budgeted versus actual amounts for 2015 are shown in the following table:
Description
Total Energy Purchases
Total Energy Consumption,MWh
Purchase Cost per MWh
Budget
$12,595,115
164,729
$76.46
Actual
$11,509,180
152,210
$75.61
The total purchased power costs were 8.6%less than budgeted and total energy
consumption was about 7.6%less than forecast during 2015.The two major factors
that affect the total purchased power cost are resource cost and energy consumption
by our customers.All these factors helped to reduce the District's actual purchased
energy cost to $74.40 per MWh,about 2.7%under budget.The following graphs and
tables are shown in Attachment B:
•Budgeted vs.Actual Power Purchase Cost,2015
•Budgeted VS.Actual MWh Consumption by Month,2015
•Peak Load in MW by Month,2008 -2015
•Budgeted VS.Actual Power Sales,2002-2015
•Resource Mix by Percentages,2015
•Resource Mix in MWh Purchases,2014-2025
•CARB Cap and Trade Summary,2013-2021
On December 7,2011 the Board approved the Renewable Energy Resources
Procurement Plan per Senate Bill 1x2.This plan defines the minimum required
percentage of renewables per compliance period based on total retail energy sales.
Compliance periods and percent renewables are as follows:
Period 1 -January 1,2011 through December 31,2013 -20%
Period 2 -January 1,2014 through December 31,2016 -25%
Period 3 -January 1,2017 through December 31,2020 -33%
Section 3201 (bb)of the CEC regulations define retail sales as:Sale of electricity by a
PUO to end-use-customers and their tenants,measured in MWh.This does not
include energy consumption by a POU,electricity used by a POU for water pumping,
or electricity produced for onsite consumption (self-generation).Therefore the
District's retail sales for this calculation is equal to 140,819 -6,467 -473 =133,879
MWh.
The District's estimated renewable energy portfolio performance for 2014 is shown in
the table below:
Eligible Renewables (per CEC)
Small Hydro
Landfill Gas
Wind
Totals
RECs (MWh)
698
23,854
38,786
63,338
%Sales
0.5%
17.8%
29.0%
47.3%
4.FISCAL IMPACT
Detailed budgeted versus actual amounts for 2015 are shown in the following table:
I su~mary ~01 ~Budget v~A~tua~_ _I I
Power Purchases,MWh Budget - -Actual-
Total Energy Purchase,MWh I 164,7291 _.159,614
~rcen~Differ~n-ce,Actual vs.Budget -_t~-I -7.6%
Power Purchase Costs t B~dget -~-Actual
1_$11,331,030 $10,861,819
_0,216,6Z-4!-__$591,015
$75,423 $0----
($28,012)$21,366
-------'-'--'--'-+.._-
$0 $34,979
-r
Total Energy Supply -UAMP~,yjAPA,etc
Transmission -NV Energy
Sched u~~~CPA
WAPA costj(credit)
I-----
Misc Costs:WECC,WREGIS,etc.
Total Power Purchase Cost---
~O~r/(Unde~Bud~t
Percent DJ!fer~nce~ctual~s.Budget
~1,509,180
(~,085,935)
-8.6%------
Purchase Cost per MWh _
Percent Difference,Actual vs.Budget
I-----
$76.46
---I-
$75.61---_.
-1.1%
Peak Load Information Budget Actual
___)i§:0 ~8.0
5.6%
-1-_____ _~
5.RECOMMENDATION
Receive and comment on this report.
Stephen Hollabaugh
Assistant General Manager
Michael D.Holley
General Manager
Attachment A
Summary Historical Energy Usage Data
2005 through 2015
Energy Purchases -MWh
Delivered to
Year Substations
Transmission
System Losses (1)
Total Bulk Energy
Purchased
2015
2014
2013
2012
2011
2010
2009
2008
2007
2006
2005
149,601
154,874
154,280
150,996
156,407
154,483
153,677
156,113
154,342
153,210
142,852
2,609
3,372
3,870
3,980
4,137
4,011
4,018
4,076
4,042
4,018
3,767
159,614
158,245
158,149
154,976
160,544
158,494
157,695
160,189
158,384
157,228
146,619
Actual VS.Budgeted Energy Purchases -MWh
Year Actual Budget %Difference
2015 159,614 164,729
2014 158,245 164,713
2013 158,129 163,082
2012 154,976 162,000
2011 160,544 162,000
2010 158,494 160,000
2009 157,695 163,220
2008 160,189 161,604
2007 158,384 156,963
2006 157,228 150,168
2005 146,619 145,382
3.1%
3.9%
3.0%
4.3%
0.9%
0.9%
3.4%
0.9%
-0.9%
-4.7%
-0.9%
Energy Sales,MWhYear
Energy Sales to Customers -MWh
Change from Previous
Year,%
2015
2014
2013
2012
2011
2010
2009
2008
2007
2006
2005
140,819
142,584
147,389
146,014
149,978
147,647
146,875
148,305
147,091
144,269
136,339
-1.24%
-3.26%
0.94%
-2.64%
1.58%
0.53%
-0.96%
0.83%
1.96%
5.82%
Distribution System Losses -MWh
Year Losses (2)
Delivered to
Substations
Losses as a
%of Delivered to Subs
2015
2014
2013
2012
2011
2010
2009
2008
2007
2006
2005
8,782
12,290
6,891
4,981
6,429
6,836
6,802
7,808
7,251
8,941
6,513
149,601
154,874
154,280
150,996
156,407
154,483
153,677
156,113
154,342
153,210
142,852
5.9%
7.9%
4.5%
3.3%
4.1%
4.4%
4.4%
5.0%
4.7%
5.8%
4.6%
Notes:1 Transmission System Losses:This is the amount of MWh that NVEnergy requires the
District to pay by tariff as a loss.This is defined as a fixed percentage of MWh Delivered to the District
2 Distribution System Losses:This is the difference between energy delivered to our substations and what
is sold to District customers.Historically this value has been between 4%and 7%.
Attachment B (2015 Budget vs Actual Charts)
$14,000,000 FY15 Power Purchase Cost
$12,595,11
$12,000,000
$10,000,000
•Scheduling
$8,000,000
$6,000,000 •Transmission
$4,000,000
•Total Energy
$2,000,000 Supply
$0
Budget Actual
-$2,000,000
2015 Monthly Energy Consumption
20,000
18,000
16,000
14,000
M
W 12,000
h 10,000
8,000
6,000
4,000
2,000
0
JAN MAR MAY JULY SEPT NOV
•Budgeted
•Actual
Monthly Peak MW
2008 thru 2015
40.0 .2015 Peak MW
35.0 .2014 Peak MW
30.0 .2013 Peak MW
25.0 J .2012 Peak MW
20.0 2011 Peak MW
15.0 .2010 Peak MW
10.0
.2009 Peak MW
5.0
•2008 Peak MW
0.0
JAN FEB MAR APR MAY JUNE JULY AUG SEPT OCT NOV DEC
170,000
165,000
160,000
155,000
I-
~150,000
>-?145,000
~140,000
135,000
130,000
125,000
120,000
~Actual MWh
-.&.-Budget MWh
Sales MWh
Wind
24%•Landfill Gas
•Natural Gas
•Small Hydro
.Wind
~r--------.Small Hydro
3%"f"dLandfillGas.Unspeci Ie
15%Pool
2015 Resource Mix
Resources (MWh)By Year 2014 -2025
with Veyo Heat Recovery 2017 &
2017-2022 Market Purchase
180,000
160,000
140,000
100,000
80,000
60,000
40,000
20,000
o
~~~~'b et-<0 et-'"~
",<0 ",<0 ",<0 ",<0 ",'0 ",<0
•Open Position-UAM PS
Pool/Mkt
Veyo Heat Recovery
2017
•Horse Butte Wind -
Wind
•Nebo Power Plant -
Natural Gas
•Pleasant Valley -Wind
CARB Cap and Trade Summary
Utility
Utility Name Type (1)2013 2014 2015 2016 2017 2018 2019 2020 2021
Truckee
Donner Public
Utility District POU 115,865 116,807 117,582 118,090 119,452 119,049 119,295 119,775 0
Allowance Revenue $862,563 $836,233 $965,402 ------------------
Allowances Sold 70,866 71,806 77,583 --------- ---------
Revenue used for HB Wind $862,563 $836,233 $965,402 ---------------
!Annual Allocation of Electrical Distribution Utilities (Allowances)