Loading...
HomeMy WebLinkAbout9 Well 20 Change Orderenda Item # CONSENT To: Board of Directors From: Brian Wright Date. April 06, 2016 Subject: Consideration of Change Order No.1 for the Well 20 Pump and Motor Replacement Project 1. WHY THIS MATTER IS BEFORE THE BOARD District Code requires that all procurements in excess of $15,000 be submitted for Board approval. 2. HISTORY In September, 2015 District Staff determined the pump and motor assembly for the Well 20 facility had failed and would require replacement. In October, the District publicly advertised request for bids for the Well 20 Pump and Motor Replacement Project and at the November 18, 2015 meeting the Board awarded a contract to Carson Pump, LLC, in the amount of $58,800, plus a 10% contingency, for a total amount not to exceed $64,680, Items included in the scope of work for this project included the purchase and installation of a new and factory complete 150hp pump and motor assembly, the reinstallation of the District's 630' of existing 5" diameter well piping, factory approved start-up, testing of the new pump and motor assembly, and video inspection of the 3. NEW INFORMATION Following the removal of the failed Well 20 pump and motor assembly, Carson Pump, LLC. conducted a video inspection of the well column. The video inspection of the well column revealed multiple zones of damage to the well column perforated louvers between at depths of 3221-675' from the surface. The damage includes areas of bent and missing louvers. Well column perforations and.or louvers allow ground water to freely flow into the well column, while reataining or preventing gravel and sand from entering. This is a critical component of a groundwater well's performance and sustainability. The areas of damaged and/or missing louvers will require additional wire brushing, bailing and removal of excess debris and well column screen repair. The reppir of the well column perforated, or louvered screen will require the contractor to mobilize additional equipment and the approval of Change Order No. 1, in the amount of $19,5000 4. FISCAL IMPACT Funds for Well 20 Pump and Motor Replacement Project, Change Order No. 1 are available in the FY16 Water General Fund, 5. RECOMMENDATION Authorize Change Order No. 1 for the Well 20 Pump and Motor Replacement Project in the amount of $19,500, for a total contract amount not to exceed $84,180. Michael D. Holley General Manager / Water Utility Manager