HomeMy WebLinkAbout12 Contract for Aerial MappingCONSENT
To: Board of Directors
From: Ian Fitzgerald
Date: May 04, 2016
Subject: Consideration of the Award of a Contract for Aerial Mapping
Services
1. WHY THIS MATTER IS BEFORE THE BOARD
Board approval is required for expenditures in excess of $15,000.
2. HISTORY
Seven Tahoe region public agencies (Town of Truckee, Truckee Sanitary District,
Truckee -Tahoe Airport District, Northstar Community Services District, North Tahoe
PUD, Tahoe City PUD, and Truckee Donner PUD) have combined resources, money,
and expertise for one of the largest collaborative efforts to date between all these
agencies. It is an effort that is designed to reduce the duplication of costs passed on
to our rate payers for similar data collected individually by each agency. It is also a
project that will keep the PUD as the leading agency of geographic information in the
region, provide data for historical views, and continue to aid our engineers and
managers on future District projects.
A request for proposals (RFP) for aerial mapping services had been sent to 17
prospective vendors. The project is expected to be done over the summer with data
delivery no later than October 31st 2016 ready to be used for the 2017 construction
season. In 2006 and 2011, similar successful projects were performed to acquire
lower resolution aerial photography and Light Detection and Ranging (LiDAR)
elevation data. Those projects were a collaboration effort between the Town of
Truckee, Truckee Sanitary District, Truckee Airport District, Northstar CSD, and the
PUD. The data collected through the 2006 and 2011 projects has proved invaluable
over the last ten years, contributing to quick, inexpensive evaluations of many PUD
projects, including but not limited to:
• Prosser Dam aquifer model;
• Various District property evaluations;
• Martis Valley basin aquifer study;
• Higher mapping accuracy of electric and water facilities;
• Water meter replacement project;
• Radio studies for SCADA and two-way communications; and
• Electric meter AMI studies.
3. NEW INFORMATION
This project is organized in a similar manner to the 2011 project, where the PUD is the
lead agency and has a direct contract, and relationship with the vendor. The PUD has
payment agreements with the other partners as outlined in Attachment 1: Truckee
Sanitary District, Town of Truckee, Truckee Tahoe Airport District, North Tahoe PUD,
Tahoe City PUD and Northstar Community Services District. Agency cost share is
based on size of District and District overlap, providing fair pricing based on actual
need.
The due date for proposals was March 251 2016. A total of seven proposals were
received. The evaluation process included one representative from three of the
participating seven agencies. Each agency reviewed the proposals for technical
qualifications, cost efficiency, and quality of references. A meeting between the
agencies was held on March 31, 2016 to review each agency's findings and agree
upon a preferred vendor for the project.
Evaluation of the proposals was broken into three distinct parts. A
Technical/Experience evaluation was performed by all agencies on all seven
proposals. After ranking each proposal for technical qualifications, the top three were
then evaluated for cost. References checks for the top three companies were then
performed. Aero-Graphics was selected as the highest scoring vendor who best fit the
agencies needs. Services to be aquired include 3" resolution aerial photography, high
resolution LiDAR, and building / pavement GIS features. The total cost of the project
is $124,570 plus a 10% change order option.
4. FISCAL IMPACT
The FY16 Electric Capital Budget has sufficient funds for aerial mapping services.
Due to seven agencies sharing the total cost for this project, the District's share is
$25,542 with a cost not to exceed with 10% change orders of $28,096, Percentage of
project cost for each agency was determined by the the area size requested by each
agency, and whether any other agencies were requesting a portion of the same area,
and what percentage of that requested area overlaped.
Requested Overlap Percentage of Agency Cost Agency Cost
Agency Sq. Miles Percentage Project Cost (Total) (with Change Order)
North Tahoe PUD I 11.85 13% 10.85% $13,514,53 $14,865,98
NorthstarCSD 18.01 I 83% 8.68% $10,818.93 $11,900,83
Tahoe City PUD 35.57 I 25% 20,40% $25,413.01 $27,954,31
TDPUD I 59.70 79% 20s0% $25,541.61 $28,095.77
Town of Truckee 52.75 94% 15.97% $191898.38 $21,888,22
Truckee TSD 51.65 I 99% 14.98% $18,664,50 $20,530.95
TT Airport District 6.00 ( 0% 8.63% $10,749,04 $11,823,95
$124,600,00 $137,060,00
5. RECOMMENDATION
1) Authorize the General Manager to execute a contract with Aero-Graphics for aerial
mapping services in the amount of $124,600, plus a 10% change order authorization
for an amount not to exceed $137,060.
2) Authorize the General Manager to execute individual agreements with each agency
that describes financial requirements.
Stephen Hollabaugh Michael D. Holley
Assistant General Manager General Manager
Attachment 1
Tahoe Public Agencies
Data &Cost Sharing Agreement for 201b Aerial mapping Services
This agreement will outline the collaboration between Tahoe Public Agencies in an effort to acquire digital
orthophotography and LiDAR for the region.
Participating Agencies:
Truckee Donner Public Utility District (Lead Agency)
Truckee Sanitary District Northstar Community Services District
Town of Truckee North Tahoe Public Utility District
Truckee -Tahoe Airport District Tahoe City Public Utility District
Deliverables:
All deliverables (below) will be one hundred percent (100%) owned by each participating agency. Each will
receive and maintain their own digital copies of the data.
Aerial Photography Collection Deliverable:
Electronic Format:'/4 mile x'/4 mile square (no overlap) tiles.
Tiff images with accompanying Tiff World File.
LiDAR Collection Deliverable
Contour Deliverable: Electronic Format:'/4 mile x'/4 mile (no overlap) tiles, uninterrupted elevation -
value attributed polylines. AutoCAD Format. To be generated and distributed by the Truckee
Donner Public Utility District as part of the project deliverables.
Lidar Point Data Deliverable (Raw &Surface): Electronic Format: Bare Earth and First Return
elevation -value attributed points, LAS Format using the ASPRS Guidelines and Standard LIDAR
Point Classes set forth in the following publication; ASPRS LAS Specification Version 1.4 —
R13.
Survey Control Deliverable
Electronic Format: Elevation -value attributed points. AutoCAD DXF Format.
Excel Spreadsheet of every control point used in this project, with their corresponding
error, Y error, Z error, Parent Control ID.
GIS Feature Data Collection Deliverable:
Two Formats: ESRI Shapefile polygon and AutoCAD DXF format for features:
Building Footprint (Polygon) and Pavement Surface (Polygon).
Tahoe Public Agencies: 2016 Aerial Mapping Services Data &Cost Sharing Agreement Page 1 of 3
Cost Sharing
Along with equal ownership of the deliverables, cost sharing will be divided between the agencies
participating based on agency service area and project overlap area. The cost of the project has been
estimated to be $124,600.00,
The cost to each participating agency will be as follows:
Agency
Percentage
of Total Project Cost
Cost
To Agency
Truckee Donner Public Utility District
20.50
$253541061
Truckee Sanitary District
14.98
$18,664,50
Town of Truckee
15.97
$19,898638
Truckee -Tahoe Airport District
8.63
$10,749,04
Northstar Community Services District
8.68
$10,818,93
North Tahoe Public Utility District
10.85
$13,514,53
Tahoe City Public Utility District
20.40
$25,413401
Change Orders
There may be required change orders to the project, not to exceed 10% of the total project cost, of which
cost sharing of the change order will follow the same percentages of dollar cost described above. For
changes order to proceed, all agencies must agree upon the change order before it is approved.
Payment Schedule
All payments will be made to the lead agency, Truckee Donner Public Utility District (TDPUD), upon receipt
of the invoice from the selected vendor. Each agency will receive a copy of the full invoice, and will be
required to pay their portion of the invoice within fifteen (15) days to the TDPUD. TDPUD will maintain the
contract, and payment bonds with the selected vendor, as well as handle all project management duties.
The payment schedule will be determined and distributed upon selection of vendor.
Signees to follow on next page
Tahoe Public Agencies: 2016 Aerial Mapping Services Data &Cost Sharing Agreement Page 2 of 3
Michael D Holley Truckee Donner Public Utility District
General Manager
Blake Tresan Truckee Sanitary District
General Manager
Tony Lashbrook Town of Truckee
Town Manager
Kevin Smith Truckee -Tahoe Airport District
General Manager
Mike Staudenmayer Northstar Community Services District
General Manager
Duane Whitelaw North Tahoe Public Utility District
General Manager
Cindy Gustafson Tahoe City Public Utility District
General Manager
Tahoe Public Agencies: 2016 Aerial Mapping Services Data &Cost Sharing Agreement Page 3 of 3