HomeMy WebLinkAbout15 Electric and Water Rate Designenda Item # ACTION To: Board of Directors From: Jeremy Popov Date: June 01, 2016 Subject: Electric and Water Utility Rate Design - Schedule a Public Hearing 1. WHY THIS MATTER IS BEFORE THE BOARD The purpose of this workshop is to present an update of the Electric and Water Utility rate study performed by the District's outside consultant and to review the process for potential adoption of revised rates and fees. 2. HISTORY Over the last several years the District has contracted with Shawn Koorn, of HDR Engineering, to review the District's cost of service and to provide recommendations for Electric and Water Utility rates. In 2010 HDR Engineering completed an electric rate structure review for both residential and commercial customers including presentation of the current structure and alternative structures. In 2013 HDR Engineering completed a comprehensive rate study for the Water Utility, and the Board thereafter adopted increases of 3% annually for FY14 and FY15. In 2015 the District contracted with HDR Engineering to again review the Water Utility and consider the increased costs associated with meeting the State drought regulations mandate which included acceleration of District pipeline replacements and ensuring that the District maintained a minimum $5 million reserve (reserve goal is $7M). In August 2015 the Board adopted Ordinance 2015-01 which increased Water Utility rates by 6% in FY16 and 5% in FY17, and a 3% maximum increase per year thereafter through FY20. Water Utility rates were updated in accordance with Proposition 218 requirements. Electric Utility rates have mitigating rate increases n carbon free power sources, end 2015. agreements. During this ti not changed since FY09. through well structured ie, staff has also been able achieving over 45% carbon Staff has been successful in long term I to in tl free sourcing ower purchase e percentage of as of fiscal year During the FY16/17 budget adoption process, staff presented the 10-year Financial Master Plan (FMP) which informed the Board of the need to consider an Electric Utility rate increase in order to address increased cost of service requirements, to fund capital projects including the electric meter replacement program (currently in pilot )hase), and to increase reserves to meet District targets. Reserve replenishments are necessary following increased emphasis in capital improvements that began in FY15 and will continue through FY17. The District's planned utilization of reserves included the Donner Lake substation rebuild, SCADA enhancements, and procurement of a spare Truckee substation transformer. For FY16 through FY17 the District is also investing in the electric meter replacement project. The electric meter infrastructure, including both hardware and software, is nearing end of useful life. The electric meter replacement project scope includes new meter installations throughout the service territory and electronic data collection and transmission units. The new meter technology offers exciting customer service enhancements as well as improved outage management capabilities. The FMP as reviewed during the budget process did not assume a rate change until FY18, at which point a 4% rate increase was assumed for FY18 and FY19 and 3% increase for each year thereafter. The Board directed staff to evaluate an alternative of starting the rate increase one year earlier in order to minimize overall impact to customers by instead providing a less than inflationary annual rate increase. A nominal rate increase in FY17 allows the District to meet reserve goals a year sooner by FY24). The District contracted with HDR Engineering in March 2016 to consider the Electric Utility cost of service and recommend an update to rates to meet revenue requirements. The District also contracted with HDR Engineering to review two minor Water Utility rate/fee considerations, specifically the need to create a rate for fire suppression only service and a fee for water hauler service (potable water truck fill up service). 3. NEW INFORMATION The District contracted HDR Engineering to review and present a summary of the Electric Utility rate increase required to accomplish the District's goals and to present rate design for a fire suppression only rate and water hauler fee for the Water Utility. Tonight, Shawn Koorn of HDR Engineering will present the summary. Attachment 1 is a draft of the presentation. Important highlights of the rate study include: • Electric Utility: An emphasis for the Electric Utility rate design for FY17 and thereafter is to prepare the District for upcoming technological advancement and industry change. Distributed renewable generation and demand side storage advancements are promising technologies that also present challenges to distribution utilities, specifically the need to ensure that fixed infrastructure maintenance and operations costs are adequately covered even in the scenario of decreased consumption. The District intends to pro -actively prepare and ensure rate structure mitigates these challenges in a planned approach such that the change has the least annual financial impact to customers. To accomplish this, the majority of the rate increase proposed is applied to the customer charge (fixed amount) rather than an adjustment to enerqv charge per kilowatt hour. A sample of the customer base, including low income, senior housing, and general averages were evaluated to ensure that the proposed increases did not disproportionately affect any particular segment of the population. Average fiscal impact to a residential customer bill is provided in Attachment 1. The medium commercial rate was evaluated and adjusted further in order to better align the small, medium, and large commercial rates. • Water Utility fire suppression rate: Development of a cost based rate to recover the cost of providing fire suppression only service to customers who do not also receive potable water service. During the rate study process it was determined that the cost to ratepayers to implement a rate change in a manner compliant with Proposition 218 exceeds the annual revenue received from the very few active accounts, and as a result, staff recommends the item be held in abeyance until the next complete Water Utility rate study requiring compliance with Proposition 218. • Water Utility water hauler fee: Development of a cost based water rate or fee for customers who require the ability to temporarily connect to an existing District connection (such as a fire hydrant) to fill customer owned and operated water transportation equipment. Because this rate is not an incident of real property and is not a mandatory fee (as customers may chose an alternative supplier), and because the rate is intended to be for temporary use, this fee is not subject to Proposition 218. Direction from the Board is requested, and if the Board adopts new rates for future years (excluding the fire suppression rate) the following schedules would be implemented: Water Utility water hauler rate update: • Schedule a public hearing for the proposed rates -June 1, 2016 (tonight); • Hold a public hearing regarding proposed rates - July 205 2016; • Subject to public hearing, approve proposed rates - July 20, 2016, and • Rates would be effective 60 days after Board approval Electric Utility rate update: • Schedule a public hearing for the proposed rates -June 1, 2016 (tonight); • Hold a public hearing regarding proposed rates -July 20, 2016; • Subject to public hearing, approve proposed rates - July 20, 2016; and • Rates would be effective the first bill printed after January 1st of each year. Staff recommends implementation of rate changes as defined in Attachment 1 in order to ensure that annual rate changes are held near the level of inflation and to adopt proposed rates for the next three years so that customers will have more certainty of future rates. 4. FISCAL IMPACT This action is part of the overall rate design process that may affect the District's spending for the next three years. 5. RECOMMENDATION 1) Receive this report and schedule a public hearing on July 20, 2016 for the proposed changes to the Electric Utility rates; and 2) Receive this report and schedule a public hearing on July 20, 2016 for the proposed addition of the Water Utility water hauler fee. Jeremy Popov Administrative Services Manager Michael D. Holley General Manager