Loading...
HomeMy WebLinkAbout9 Utility Valve Box associated with the Town of Truckeeenda Item # CONSENT n To: Board of Directors From: Brian Wright :)ate . October 05, 2016 Subject: Consideration to approve the Water Utility Valve Box Adjustments associated with the Town of Truckee 2016 Paving and Drainage Project 1. WHY THIS MATTER IS BEFORE THE BOARD District Code requires all procurements with a total cost amount exceeding $15,000 be approved by the Board. 2. HISTORY The Town of Truckee manages paving and drainage improvement projects along the Town's public right of ways on an annual basis. These projects range in scope from complete roadway removal and replacements, to mill and overlay maintenance projects. The Town of Truckee awards construction contracts for the annual paving and drainage projects through a competitive bidding process. Included within the project scope of work is a bid item for the excavation and adjustment of water utility valve covers, located within the project boundaries, and owned by the District. Following the award of the contract by the Town of Truckee, each year the District is provided the option to either authorize the Town's contractor to perform the work at the cost of the District, or perform the work utilizing District staff and equipment. 3. NEW INFORMATION On August 23, 2016 the Town of Truckee 2016 Paving and Drainage Project was awarded to Teichert Construction. Included in the project's Bid Summary are line items for the adjustment of water valve covers. A breakdown of the itemized costs are included in the following table: Item Unit Cost Estimated Quantity Total Estimated Cost Adjust Water Valve Cover $300 230 $69,000 District staff has evaluated the costs associated with the completion of the work, as well as the potential impact on current District projects and maintenance operations, and has determined the most beneficial option for the District is to authorize the Town's contractor to complete the work at the cost of the District. 4. FISCAL IMPACT Sufficient funds exist in the FY16 and FY17 Water Capital Budget and will be funded from the Water General Fund. S. RECOMMENDATION Authorize the General Manager to accept the Town of Truckee proposal to complete the water utility valve cover work associated with the Town of Truckee 2016 Paving and Drainage Project, for a total cost to the District not to exceed $70,000. VA 0% Michael D. Holley General Manager / Water Utility Manager