HomeMy WebLinkAbout11 Notice Of Completion 2016 Pipelineenda Item #
CONSENT
11
To: Board of Directors
From: Neil Kaufman
Date. November 02, 2016
Subject: Consideration of the Notice of Completion for the 2016 Pipeline
Project
1. WHY THIS MATTER IS BEFORE THE BOARD
The District Pipeline Replacement -2016 project is complete. A resolution accepting
the project as complete requires Board approval.
2. HISTORY
In April 2016, the Board awarded the construction contract for the District Pipeline
Replacement -2016 project to Aspen Developers of Reno, Nevada. The project
involved replacement of about 7,000 feet of pipeline in three segments in the Tahoe
Donner subdivision. Aspen began work in May and completed the construction in the
middle of October.
The original bid price was $1,386,475.75. At the time of award, the Board also
established a 10 percent change order allowance for a total authorization not to
exceed $1, 525, 000.
During the course of the project, 12 change order requests were submitted and
reviewed by staff. After review and discussion, the District and Aspen agreed on a
total of $69,021.25 for these issues. This amount did not exceet the $138,524.25
change order allowance established by the Board of Directors. The items generally fell
under the following categories:
• Issues related to slipling of the existing 8-inch steel pipe at the Trout Creek
Recreation Center;
• Inaccurate as -built drawings that resulted in errors in the bid documents;
• Repair of water leaks; and
• Extra work not covered by the original bid.
There was on item that resulted in a credit to the District. The contract is based on a
unit price bid. Attachment 1 shows the differences between bid totals and the amounts
actually constructed. This analysis results in a $54,177,68 credit to the Districty
In mid -October, District staff performed a final waKthrough on the project. The work
performed is complete and should be accepted by the District. Attached is Draft
Resolution 2016-27 accepting the project and directing that a Notice of Completion be
filed.
4. FISCAL IMPACT
The original bid price was $1,386,475.75. Once adjustments are made for the items
described above, the final contract price is $1,401,319.32. As discussed at the time of
award, the funding source for the project is the Water Department Operating Reserve
Fund.
5. RECOMMENDATION
Adopt Resolution 2016-27 accepting the District Pipeline Replacement - 2016 project
as complete and authorize the filing of the Notice of Completion.
Michael D. Holley
General Manager / Water Utility Manager
Analysis W Bid Quantities vs. Actual Quantities Constructed
District Pipeline Replacement- 2016
Contractor: Aspen Developers
Bid
Amounts
Actual
Amounts
Bid Item
Description
Quantitv
Units
Unit Price
F
Subtotal
I Quantity
Units
I
Unit Price
Subtotal
1
Mobilization
1
LS
$ 15,075.75
$ 15,075.75
1 LS
$ 15,075.75
$
15,075.75
1A
8" Water Main
3,557
FT
$
64,66
$
230,000.00
3,608
FT
$
64.66
$
233,297,72
1B
2" PE Water Service Lateral
11400
FT
$
44,29
$
62,000.00
1,451
FT
$
44,29
$
64,258,57
1C
Single Water Service (SS)
9
EA
$
1,222.22
$
11,000,00
9
EA
$
1,222.22
$
11,000,00
I
Double Water Service For Lower Pressure Areas (DSL)
27
EA
$
1,629.63
$
44,000.00
24
EA
$
11629,63
$
39,111.11
1 E
Double Water Service with One Lot Vacant (DSV)
4
EA
$
21750,00
$
11,000.00
7
EA
$
21750,00
$
19,250.00
1 F
Double Water Service with Both Lots Vacant (XV)
2
EA
$
1,750.00
$
31500,00
2
EA
$
1/750400
$
3,500.00
1 G
Connect New 2" Lateral to Existing Meter Boxes at 11969 Kitzbuhel Road
1
EA
$
21500,00
$
2,500.00
1
EA
$
21500,00
$
21500,00
1 H
Connect New 2" Lateral to Existing Meter Box at 11827 Kitzbuhel Road
1
EA
$
2,800.00
$
2,800.00
1
EA
$
21800,00
$
21800,00
11
Fire Hydrant Assembly
6
EA
$
7,000.00
$
42,000.00
6
EA
$
71000,00
$
42,000.00
1J
Air Valve Assembly
1
EA
$
41000,00
$
41000,00
2
EA
$
41000,00
$
81000,00
1 K
Connection to Existing 6" DI Pipe at Station 0+00
1
LS
$
50000,00
$
51000,00
1
LS
$
5/000000
$
51000000
1 L
Tee/Valve/Fire Hydrant Assembly at Station 17+96
1
LS
$
9,500.00
$
91500400
1
LS
$
91500,00
$
9,500.00
1M
Tee/Valve Assembly at Station 31+81
1
LS
$
11,800.00
$
11,800,00
1
LS
$
11,800,00
$
11,800.00
1 N
Connection to Existing 6" Steel Pipe at Station 35+56.51
1
LS
$
2,700.00
$
21700,00
1
LS
$
2,700.00
$
21700,00
10
Rock Excavation
36
HRS
$
416,67
$
15,000,00
23
HRS
$
416,67
$
%583.33
1 P
AC Pavement and Base (trench restoration)
32,000
SF
$
3,44
$
110,000.00
15,917
SF
$
3,44
$
54,714,69
1Q
Additional''/2" Thickness of AC Pavement (trench restoration)
32,000
SF
$
0.50
$
16,000.00
60,117
SF
$
0.50
$
30,058950
1 R
All Other Work Required by the Contract Documents
1
LS
$
32,000400
$
32,000.00
1
LS
$
32,000.00
$
32,000.00
3A
8" Water Main — Station 0+00 to 3+82
382
FT
$
112,57
$
43,000600
382
FT
$
112.57
$
431000,00
3B
6" Water Main — Station 3+82 to 8+69
487
FT
$
78,03
$
38,000,00
480
FT
$
78,03
$
37,453,80
3C
8" Water Main — Station 8+69 to 11+53,59
285
FT
$
84,91
$
24,200.00
291
FT
$
84.91
$
24,709947
3D
4" Water Main — Golf Club Condominiums
310
FT
$
54,84
$
17,000,00
301
FT
$
54,84
$
16,506,45
3E
2" PE Water Service Lateral
560
FT
$
32,14
$
18,000000
480
FT
$
32.14
$
16,428,57
3F
5-Meter Water Service (5S)
5
EA
$
61300,00
$
31,500.00
4
EA
$
69300,00
$
25,200,00
3G
3/4" Commercial Water Service
1
EA
$
31500,00
$
31500400
1
EA
$
31500,00
$
2,500.00
3H
Connect New 2" Lateral to Existing Meter Box
2
EA
$
1,000.00
$
2,000.00
4
EA
$
11000,00
$
4,000.00
31
Fire Hydrant Assembly at Golf Club Condominiums
1
EA
$
7,500,00
$
7,500,00
1
EA
$
71500,00
$
71500,00
3J
Fire Hydrant Assembly at Trout Creek Recreation Center
1
EA
$
8,000.00
$
81000000
1
EA
$
8,000.00
$
81000,00
3K
1" Air Valve Assembly
1
EA
$
61400,00
$
6,400.00
1
EA
$
61400,00
$
6,400.00
3L
Connection to Existing 8" Pipe at Station 0+00
1
EA
$
5/000000
$
5,000.00
1
EA
$
5,000.00
$
59000,00
3M
Tee/Valve Assembly at Station 1+54
1
EA
$
4,300.00
$
4,300.00
1
EA
$
49300600
$
4*300.00
3N
Tee/Valve Assembly at Station 3+16
1
EA
$
4,000.00
$
4,000.00
1
EA
$
41000,00
$
4,000.00
30
Tee Assembly at Station 8+69
1
EA
$
3,500.00
$
3,500.00
0
EA
$
3,500.00
$
3P
Connection to Existing 8" Pipe at Station 11+53.59
1
EA
$
3,500.00
$
3,500.00
1
EA
$
3,500.00
$
31500,00
30
Implement Temporary Aboveground Water System
1
LS
$
22,000.00
$
22,000.00
1
LS
$
22,000.00
$
22,000,00
3R
Dismantle Temporary Aboveground Water System
1
LS
$
51500,00
$
5,500.00
1
LS
$
51500,00
$
50500,00
3S
Rock Excavation
12
HRS
$
375,00
$
4,500.00
31
HRS
$
375.00
$
11,625400
3T
AC Pavement and Base (trench restoration)
71000
SF
$
3,86
$
272000,00
81010
SF
$
3.86
$
30,895.71
3U
Additional'/2" Thickness of AC Pavement (trench restoration)
71000
SF
$
0.51
$
3,600.00
0
SF
$
0,51
$
-
3V
All Other Work Required by the Contract Documents
1
LS
$
33,000.00
$
33,000.00
1
LS
$
33,000.00
$
33,000,00
4A
8" Water Main
21004
FT
$
89,32
$
1791000,00
11972
FT
$
89.32
$
176,141.72
4B
2" PE Water Service Lateral
110
FT
$
70,91
$
7,800.00
125
FT
$
70,91
$
81863,64
4C
Single Water Service (SS)
2
EA
$
1,500.00
$
31000,00
2
EA
$
1,500.00
$
3,000.00
4D
Double Water Service For Lower Pressure Areas (DSL)
1
EA
$
21700,00
$
21700,00
1
EA
$
21700,00
$
21700400
4E
Connect to Exist 2" PE Lateral
5
EA
$
21800,00
$
14,000,00
5
EA
$
2,800.00
$
14,000.00
4F
Connect to Exist 4" Lateral
5
EA
$
51200,00
$
26,000.00
5
EA
$
51200,00
$
26,000.00
4G
Fire Hydrant Assembly
2
EA
$
71500,00
$
15,000,00
2
EA
$
71500,00
$
157000,00
4H
Connection to Existing 8" Pipe at Station 0+00
1
EA
$
41100,00
$
41100,00
1
EA
$
4,100.00
$
4,100.00
41
Tee/Valve Assembly at Station 4+11
1
EA
$
12,000,00
$
127000,00
1
EA
$
12,000,00
$
12,000,00
4J
Tee/Valve Assembly at Station 8+46
1
EA
$
81000900
$
8,000.00
1
EA
$
81000000
$
8,000.00
4K
Cross/Valve/Fire Hydrant Assembly at Station 11+61
1
EA
$
23,000,00
$
23,000.00
1
EA
$
23,000,00
$
23,000.00
4L
Connection to Existing 8" Valve at Station 20+03.61
1
EA
$
21500,00
$
2,500.00
1
EA
$
21600,00
$
2,500.00
4M
Rock Excavation
16
HRS
$
468,75
$
71500,00
58
HRS
$
468.75
$
27,187.50
4N
AC Pavement and Base (trench restoration)
15,000
SF
$
5,87
$
88,000,00
10,421
SF
$
5,87
$
61,136.53
40
Additional'/2" Thickness of AC Pavement (trench restoration)
15,000
SF
$
0.47
$
7,000.00
0
SF
$
0.47
$
-
4P
lAll Other Work Required by the Contract Documents
1
LS
$
42,000.00
$
42,000.00
1
LS
$
42,000,00
$
42,000.00
Total Amount of Base Bid $ 1,386,475.75 $ 1,332,298.07
Credit to the District $ 54,177.68
TRUCKEE DONNER
Public Utility District
Resolution No. 2016 = 27
AUTHORIZING THE ACCEPTANCE OF
THE DISTRICT PIPELINE REPLACEMENT - 2016 PROJECT
AND DIRECTING FILING OF THE NOTICE OF COMPLETION
WHEREAS, the Board of Directors of the Truckee Donner Public Utility District made the determination to
undertake the District Pipeline Replacement - 2016 Project and
WHEREAS, Aspen Developers Corp. was selected by the District to perform the work; and
WHEREAS, Aspen Developers Corp. has completed all of the work included in the Project; and
WHEREAS, The District's Water System Engineer, Neil Kaufman, now certifies the completion of the project; and
WHEREAS, the District's Water Utility Manager/General Manager, Michael D. Holley, has recommended that the
work be accepted by the District;
NOW THEREFORE BE IT RESOLVED by the Board of Directors of the District as follows:
1. That the District hereby accepts the Districf Pipeline Replacement - 2016 Project as complete.
2. That the Clerk of the District be directed to file with the County of Nevada the Notice of Completion, a copy
of which is attached hereto.
3. That 35 days following the filing of the Notice of Completion, the monies retained from the contractor
payments be released to the contractor if no claims have been made to the District by material suppliers,
laborers, or sub -contractors.
PASSED AND ADOPTED by the Board of Directors at a meeting duly called and held within the District on the
second day of November 2016 by the following roll call vote:
AYES:
NOES:
ABSTAIN:
ABSENT:
TRUCKEE DONNER PUBLIC UTILITY DISTRICT
By
Joseph R. Aguera, President of the Board
ATTEST:
Michael D. Holley, Clerk of the Board
RECORDING REQUESTED BY:
Truckee Donner Public Utility District
WHEN RECORDED, RETURN TO:
TRUCKEE DONNER PUBLIC UTILITY DISTRICT
Shanna D. Kuhlemier, Deputy District Clerk
11570 Donner Pass Road
Truckee, CA 96161
THE UNDERSIGNED DECLARES
DOCUMENTARY TRANSFER TAX - NONE
NOTICE OE COiIiiPLETION
NOTICE IS HEREBY GIVEN:
1. That the name and address of the public entity for whom the improvement project was done, as owner
thereof, is the Truckee Donner Public Utility District, 11570 Donner Pass Road, Truckee, GA
96161,
2. Nature of interest or estate of owner: beneficial interest of a public utility easement for installation of
water facilities.
3. That on November 2, 2016 the hereinafter described improvements were accepted as complete
pursuant to Resolution 2015-27 of the Truckee Donner Public Utility District, the awarding authority.
4. That the subject improvements of the Notice are generally described and identified as follows: District
Pipeline Replacement - 2016 Project.
5. That the name and address of the contractor for such project was: Aspen Developers Corp. P.O. Box
34145 Reno Nevada, 89533.
Dated: November 2, 2016
I certify under penalty of perjury under the laws of the State of
California that the foregoing is true and correct.
TRUCKEE DONNER PUBLIC UTILITY DISTRICT
Michael D. Holley, General Manager
MAIL TAX STATEMENTS TO:
SAME AS ABOVE
Legal References: CC-3093,CCP-2003 (oath), 2015.5 (unsworn statement)