Loading...
HomeMy WebLinkAbout12 Ponderosa Palisades Pump Station Buildingenda Item a CONSENT To: From: Date: Subject: Board of Directors Brian Wright May 03, 2017 Consideration to Award a Contract for the Construction of the Ponderosa Palisades Hydro Pump Station Concrete Block Building 1. WHY THIS MATTER IS BEFORE THE BOARD District Code requires all procurements in excess of $15,000 are to be submitted to the Board for approval. 2. HISTORY The Ponderosa Palisades Hydro -pneumatic Pump Station is located in the Ponderosa Palisades subdivision. The station was originally constructed in 1972 to provide adequate domestic water pressure and fire flow to the upper elevations of the subdivision. The facility originally housed a 60Hp hydro -pneumatic pump system within a small wood framed structure. Over the course of the past 44 years, modifications to the pump station, electrical control equipment, and the SCADA systems have outgrown the size of the wood framed structure and is need of replacement. Additionally, the existing hydro -pneumatic pump system design does not meet the current fire flow requirements for the Ponderosa Palisades pressure zone. With the hydro -pneumatic pump equipment and the wood framed structure having exceeded their useful life, staff has determined the need to build a replacement facility, including a new structure, hydro -pneumatic pump system and electrical switchgear. 3. NEW INFORMATION The District's water utility staff has developed a design and specification for the construction of a new concrete block pump station building to house the new hydro - pneumatic pump system and electrical switchgear assembly approved by the Board for purchase in 2016. On April 4, 2017 the District publicly advertised a request for bids for the Ponderosa Palisades Block Building Construction 2017. On April 25, 2017 the District held a bid opening at which time two bids were received. A list of the received bids has been provided in the table below. Contractor Address Total Bid Responsive Brian Moore Masonry Truckee, CA $ 16,250.00 Yes KL Masonry, Inc. Incline Village, NV $ 28/750000 No Following the review of the received bids, staff has determined the lowest responsive bidder to be Brian Moore Masonry, in the amount of $16,250. 4. FISCAL IMPACT Sufficient funds exist for this procurement in the Board approved FY217 Water General Fund Budget. 5. RECOMMENDATION Staff recommendation is to award a construction contract for the Ponderosa Palisades Block Building Construction 2017 to Brian Moore Masonry, in the amount of $16,250, plus a 10% contingency, for a total amount not to exceed $17,875. /T O r Michael D. Holley General Manager / Water Utility Manager