HomeMy WebLinkAbout10 Change Order Administration Remodelenda Item # CONSENT 10 To: Board of Directors From: Kathleen Neus Date: May 03, 2017 Subject: Consideration of a Change Order for the Design of the District's Administration Building Remodel 1. WHY THIS MATTER IS BEFORE THE BOARD Board approval is required to increase an authorized change order allowance. 2. HISTORY The District's current building was built in the mid to late 1980's. The foyer and lobby have remained unchanged for the past 30 years. At the May 4, 2016 Board meeting the Board awarded a contract to Fringe Design for the design phase of the remodel. 3. NEW INFORMATION A committee comprised of Customer Service staff and Facility Maintenance was working their way through the design process, the original plan continued to change. The original concept was for an open floor plan but with a change in staff duties the office space was changed to include separate offices. Which in turn required designing a new mail room and changing the entrance to the vault area. With an emphasis on safety and security, staff requested that Fringe Studio look into a different configuration of the stairway to the second floor. The new scope included replacing the main entrance with a heated walkway. 4. FISCAL IMPACT There are sufficient funds within the Electric General Fund. 5. RECOMMENDATION Authorize an additional change order for the Foyer and Lobby Remodel in the amount of $11,700 for an increase in the scope of work, for a total project amount of $59,990 Michael D. Holley General Manager