HomeMy WebLinkAbout16 2017 Pipeline ReplacementI A ACTION To: Board of Directors From: Neil Kaufman Date: May 03, 2017 Subject: Consideration to Award the District's 2017 Pipeline Replacement Project 1. WHY THIS MATTER IS BEFORE THE BOARD Board approval is required for expenditures in excess of $15,000, 2. HISTORY The Water Department has an ongoing need to replace existing water pipelines that fall into two basic categories. 1) Pipes that are in poor condition and require repeated repairs 2) Pipes that are old, undersized (typically 4-inch diameter and smaller) and have exceeded their useful life 3. NEW INFORMATION The District Pipeline Replacement - 2017 project covers about 2,100 feet of main at two locations: Dulzura Street and Palisade Street in the Biltz Tract Keiser Avenue at Bridge Street and Trout Creek in downtown Truckee The bid opening was held at 2:00 PM on April 18, 2017. Four bids were received. A summary of the bids is given below: TOTAL AMOUNT OF BID Bidder Location Amount Responsive Longo Incorporated Tahoe City, CA $787,486.00 Yes Aspen Developers Reno, NV $868,848.00 Yes Civil Engineering Construction Loomis, CA $9401750.00 No Lorang Brothers Colfax, CA $17255,370.00 Yes The bid documents indicate that line item for mobilization should not exceed five percent of the bid total. However, the bid from the Longo Incorporated was for a total of $787,486.00 and the line item for mobilization in the Longo bid was $70,000. This represents 8.9% of the total bid price. Based upon a review by the District's legal counsel, this issue can be considered a minor irregularity and the requirement can be waived by the Board of Directors, as this irregularity does not constitute a competitive advantage. The bid from Civil Engineering Construction was not signed and should be rejected as non -responsive. In addition to the construction contract, the District will retain perform environmental services, geotechnical testing, and construction period. The costs for this work are: Environmental Services -Inland Ecosystems - $1,760 Geotechnical Testing - CME - $35,000 Surveying - MAPCA - $9,600 4. FISCAL IMPACT outside consultants to surveying during the The bid price from Longo Incorporated is $787,486.00. The funding source for this work is the Water Department General Fund. It is recommended that a 10 percent change order allowance be established. 5. RECOMMENDATION 1) Waive the minor irregularity in the bid from Longo Incorporated associated with the line item for mobilization. 2) Award the District Pipeline Replacement - 2017 project to Longo Incorporated in an amount of $787,486 plus a10% change order allowance for a total authorzation not to exceed $866,000, Michael D. Holley General Manager /Water Utility Manager