HomeMy WebLinkAbout12 RTU Purposeenda Item To: Board of Directors From: Roe Vernon Date: August 01, 2018 Subject: Consideration of a Contract for PLC -Based Remote Telemetry Units (RTUs) 1. WHY THIS MATTER IS BEFORE THE BOARD Board approval is required for procurement over $15,000, 2. HISTORY At the May 02, 2012 Board meeting, a workshop District's existing Water System's Supervisory Control system and the planned proposal for its replacement. that the existing SandakAvery SCADA was outdated, was presented to discuss the and Data Acquisition (SCADA) At that time, it was presented Since this time, staff has completed 100% of the SCADA back -end servers, and 35% of the water stations. Donner Lake, Gateway, Glenshire, Hirschdale, and the Ponderosa Palisades Hydro systems are completed. This fall staff will also complete the 6170 Zone that encompasses the District's largest tank, and 5 wells. This will bring the station completion up to 40%. 3. NEW INFORMATION The next phase includes the replacement of next most critical Tahoe Donner pump stations, Donner Trails and Soma Sierra, and replacing the Prosser Heights system. This phase of the upgrade requires the purchase of eight Remote Telemetry Unit (RTU) cabinets and Programmable Logic Controllers (PLC), bringing these locations up to the latest technology and incorporating their operations into the existing new SCADA system. These new cabinets are compatible with the existing cabinets and reflect the currently forecasted needs for automation functions as defined by the IT Master Plan. A request for Bids for this phase of the SCADA project was issued on June 29, 2018. The District advertised in the Sierra Sun on July 6, 2018. Bids were opened on July 24, 2018 at 2:00 P.M. The following four bids were received: Bidder Amount Responsive Relevant Solutions $141,807.00 No Industrial Control & Design $174,571099 No TESCO Controls, Inc. $188,070.00 No R.O.K. Solid Controls, Inc. $1551527.00 No George T. Hall 1$144,383.00 IYes The non -responsive bids all failed to meet the specifications regarding a bid requirement to submit a completed bill of materials. Staff has reviewed all bids for accuracy and compliance with District specifications and has determined George T. Hall to be the lowest responsive bidder. 4. FISCAL IMPACT Sufficient funds exist in the Water Utility's adopted FY18 budget for this procurement. 5. RECOMMENDATION 1) Make a finding that Relevant Solutions, Industrial Control & Design, TESCO Controls, Inc. and R.O.K. Solid Controls, Inc. bids are non -responsive; and 2) Authorize the General Manager to execute a contract with George T. Hall in an amount of $144,383 plus a 107o change order authorization for a total not to exceed contract amount of $158,821 plus tax. Ian Fitzgerald Information Technology Director /CIO Michael D. Holley General Manager