Loading...
HomeMy WebLinkAbout10 Carport Structure Project Agenda Item # 10 Public Utility District ACTION To: Board of Directors From: Jim Wilson Date: March 04, 2009 Subject: Approve a Change Order for the Carport Structure Project 1. WHY THIS MATTER IS BEFORE THE BOARD Approval from the Board of Directors is necessary to issue a Change Order to a construction contract. 2. HISTORY The District main office was originally constructed with no exterior sheltered parking. We are unable to to protect valuable fleet and equipment from the elements. A group of employees developed a plan for construction of up to five covered parking areas. A Request For Proposal was issued on September 29 and six proposals were opened on October 29. The Board awarded the Covered Parking - Carport Structure No.3 project to PLUMMERBILT Custom Construction Inc. at the regularly scheduled meeting on November 5, 2008. 3. NEW INFORMATION The Covered Parking - Carport Structure No.3 project design submittal process has been completed. Upon review of the building design documents, it was discovered that there was a conflict with the existing infrastructure which required relocation/redesign of the structural steel and related footings. The total cost of the change order is $34,119.74. 4. FISCAL IMPACT The recommended source of funding for the change order is the Land Sales Fund that was set aside for the development of the corporation yard. The total cost of the change order is $34,119.74 which will be paid to PLUMMERBUILT Inc. after the satisfactory completion of the project. 5. RECOMMENDATION 1) Authorize Contract Change Order No.1 in the amount of $34,119.74 to PLUMMERBUILT Custom Construction Inc. 2) Authorize the transfer of $34,119.74 from the Land Sale Fund to the General Fund Stephen Hollabaugh Michael D. o ey Assistant General Manager General Manager PW °11 01r i�F � Change Order TRUCKEE M 71bllic Utility District Covered Parking—Carport Structure#3 Contract Name: Contract Change Order No: 1 Orig. Contract Amt. $ 144,748 Days NA Date: March 4, 2009 Prev. Apprd Changes $ None Days NA Contractor: PLUMMRTBUILT Inc. This Change$ 34,119.74 Days NA Revised Contract Amt. $ 178,867.74 Days NA This Change Order covers changes to the subject Contract as described herein. The Contractor shall construct, furnish equipment and materials, and perform all work as necessary or required to complete the Change Order Items for a lump sum price agreed upon between the Contractor and District. Increase in (Decrease) Contract Time Contract in Contract Extension Description of Changes Amount $ Amount $ (days)_ Change Order Request dated: 5 February, 2008 from $34,119.74 0 0 PLUMMERBUILT Inc. Covered Parking — Carport Structure #3; "Building design changes" including addition of 10'h row legs, footings, steel, and associated engineering. Totals $34,119.74 0 0 Net change in contract amount(increase or decrease) $34,119.74 0 0 The amount of the Contract will be increased by the sum of$ 34,119.74 and the Contract Time shall not be extended. The undersigned Contractor approves the foregoing Change Order as to the changes, if any, in the contract price specified for each item including any and all supervision costs and other miscellaneous costs relating to the change in work, and as to the extension of time allowed, if any, for completion of the entire work on account of said Change Order. The Contractor agrees to furnish all labor and materials and perform all other necessary work, inclusive of the directly or indirectly related to the approved time extension, required to complete the Change order items. This document will become a supplement of the contract and all provisions will apply hereto. It is understood that the Change Order shall be effective when approved by the District. Accepted: /Contractor Date: (Signature) Approved: /District Date: (Signature) Page 1