Loading...
HomeMy WebLinkAbout9 Power Point Consideration of a CEQA Initial Study for Electric Master Plan ACTION ITEM #9Master PlanDeclaration for Electric System Initial Study and Proposed Negative Approval of CEQA Consideration of Master PlanDeclaration for Electric System Initial Study and Proposed Negative Approval of CEQA Consideration of January 15, 2020 Consideration of Requires California Environmental Quality Act (CEQA) Initial Study•Workshop was conducted at November 20, 2019 Board Meeting•performed by Electrical Consultants Inc. (ECI)Work •Board awarded contract at November 7, 2018 Board Meeting•Electric System Master Plan updated in 2019•BACKGROUND / HISTORY CEQA Initial StudyConsideration of CEQA Initial Study Consideration of Public Hearing must be scheduled to receive comments•circulationstudy is ready for CEQA Initial •impacts, proposed Negative Declarationenvironmental negative document; causes no is a planning Plan Master •After Workshop, staff completed CEQA Initial Study•NEW INFORMATION CEQA Initial StudyConsideration of CEQA Initial Study Consideration of CEQA Initial Study Initial Study (Negative Declaration)Staff to file Notice of Determination for the CEQA –March 5, 2020 •2019–Document and Electric System Master Plan Consideration of Adoption for the Final CEQA –March 4, 2020 •Public Hearing for CEQA Initial Study–February 5, 2020 •partiesand Placer County Clerks, State Clearinghouse, and other interested Staff to file the Initial Study with Offices of Nevada –January 16, 2020 •and set Public Hearing dateBoard consideration of CEQA Initial Study –January 15, 2020 (tonight) •Anticipated timeline•NEW INFORMATION Consideration of CEQA Initial Study Consideration of CEQA Initial Study There is no direct fiscal impact associated with this item•FISCAL IMPACT Consideration of CEQA Initial Study Consideration of CEQA Initial Study and Negative Declaration for the 2019 Electric System Master Planmeeting at 6:00 PM, or shortly thereafter, on CEQA Initial Study Set a Public Hearing for the February 5, 2020 District Board 2)Approve the CEQA Initial Study and direct that it be circulated1)RECOMMENDATION Consideration of CEQA Initial Study NEW INFORMATION serviceand load balance in a manner that endeavors to increase the quality of Evaluate the existing & projected system configuration, voltage levels •15 yearsfor the next date forecast possible of financial requirements -to-•possiblePlan & complete improvements in the most economic manner •improvementsother needed Provide the District with an orderly plan for carrying out construction & •Purpose of Electric System Master Plan•2019 Electric System Master Plan2019 Electric System Master Plan NEW INFORMATION 2019 Electric System Master Plan2019 Electric System Master Plan NEW INFORMATION Projected 1.4% growth rate•10.7 MW of additional load at 15 year loading•4.3 MW of addition load at 5 year loading••2019 Electric System Master Plan2019 Electric System Master Plan NEW INFORMATION loadsexisting and future for voltage Low •Tahoe •switching between substationsTransformer and conductor overloading predicted for 15yr loads when •MartisTruckee and •yrloading > 100% 15 Conductor •loads existing and future Low voltage for •Substation Lake Donner •Load transfer summary•2019 Electric System Master Plan2019 Electric System Master Plan NEW INFORMATION Donner Lake Sub 2019 Electric System Master Plan2019 Electric System Master Plan NEW INFORMATION Tahoe Donner Sub 2019 Electric System Master Plan2019 Electric System Master Plan NEW INFORMATION Truckee Sub 2019 Electric System Master Plan2019 Electric System Master Plan NEW INFORMATION Valley SubMartis 2019 Electric System Master Plan2019 Electric System Master Plan NEW INFORMATION Glenshire 2019 Electric System Master Plan2019 Electric System Master Plan NEW INFORMATION$16,423,757Total Costs$2,046,42715 Load Transfer Projects–Years 11 $1,446,53010 Load Transfer Projects–Years 6 $2,800,00010 Recommended Projects–Years 6 $1,390,8005 Load Transfer Projects–Years 1 $8,740,0005 Recommended Projects–Years 1 2019 Electric System Master Plan2019 Electric System Master Plan