HomeMy WebLinkAboutBoard Item #15, Attachment 1ENGINEERING TECHNICAL MEMORANDUM Prepared For: Truckee Donner Public Utility District Prepared By: Matt Schultz, P.E. & Cheyanne Wiegenstein, E.I. Reviewed By: Matt Van Dyne, P.E. Date: May 14, 2020 Subject: Water Infrastructure Capital Improvement Plan Development 1.0 BACKGROUND The Truckee Donner Public Utility District (District) plans to undertake a water system rate study in the Spring of 2020. An updated Capital Improvement Plan (CIP) is needed to understand the financial and timing impacts that capital projects will have on the District, which will be reviewed to ensure water rates are sufficient for funding projects. In December of 2019, the District entered into an agreement with Farr West Engineering (Farr West) to prepare the District's Water Infrastructure CIP Development (Project) which will focus on the preparation of an updated 10-year Water Infrastructure CIP to assist in developing a rate study. 2.0 PROJECT SUMMARY Farr West was directed by the District to develop a 10-year CIP beginning with projects in 2021. This 10- year CIP spans the tnneframe of 2021-2030. The Request for Proposal (RFP) identified the following Project tasks: 1. Review Existing System Information. 2. Identify Existing Facilities Requiring Rehabilitation and/or Replacement. 3. Review Regulatory Impacts. 4. Conduct Power Supply Outage Analysis. 5. Conduct Time of Use Electrical Rate Analysis. 6. Develop Cost Estimating Criteria. 7. Develop 10-year CIP. 8. Prepare CIP Report. Farr West evaluated the Project tasks and closely coordinated with District staff to develop a complete list of CIP Projects. Farr West received the following direction from the District as a guideline to establish CIP Projects: 1. Include 2012 CIP projects scheduled between the years 2012-2030 which have not been constructed. 2. Exclude projects that were originally proposed to accommodate additional capacity to serve growth. Based on discussion with District Staff, buildout projections are less than estimated in the 2012 Water System Master Plan. Projects included in the 2021 CIP will address maintenance and operational needs of existing District infrastructure. Projects to address maintenance and operations needs are expected to be rate funded. Farr West Engineering Truckee Donner Public Utility District FWE #1785 1 Water Infrastructure Capital Improvement Plan Development n Technical Memorandum 3. Add projects determined necessary resulting from the review of regulatory impacts or power outage analysis. 4. The system goal is to provide water to all customers during a power outage scenario. However, depending on the length of a power outage, supply to large irrigation services may be suspended. Service priority will be to provide water to all residential customers for domestic use during a power outage scenario. 5. Incorporate additional projects as directed by the District. 6. Prioritize Projects: a. High priority projects shall be considered critical to the continued operation of the water system and the ability of the District to provide water services to its customers. b. Medium priority projects shall be considered necessary to comply with regulatory requirements and maintain the current condition of the existing water system assets. c. All other projects shall be considered low priority. 7. Target an annual budget of $2,250,000 for CIP Projects. 8. Develop cost estimating criteria and produce updated planning level costs for all 2021 CIP projects. The Project scope excludes efforts to update planning elements such as hydraulic modeling, building analysis, tank coating conditions, identifying system deficiencies, condition/risk assessment, CCTV, GIS, SCADA, and any related field work. The CIP will be a tool for the District to understand and plan for facility improvements by establishing rates to implement the plan. Implementing the plan in this manner will ensure the stability in utility rates over time, provide the ability for the District to perform capital projects, and provide reliable infrastructure for years to come. 3.0 REGULATORY IMPACTS To consider potential regulatory impacts related to the District's system facilities rehabilitation and/or replacement within the next 10 years, a review of current and proposed water, air quality, and electrical regulations was conducted. Regulatory changes with the potential to impact the District's water utility system fall under local, state, and federal regimes. Regulatory agencies and relevant associations consulted and researched include the State Water Resource Control Board (SWRCB), Division of Drinking Water (DDW), the California Special Districts Association (CSDA), the Association of California Water Agencies (ACWA), the California Air Resources Control Board (CARB), the Northern Sierra Air Quality Management District (NSAQMD), the California Legislature, and the United States Environmental Protection Agency (US EPA). No Agency would provide certainty of any regulatory mandates and when they would be implemented over the next 10-years, but certain parameters were discussed and identified in the following sections. The District should routinely monitor all regulatory agencies for proposed changes. A summary of all identified current and proposed regulatory impacts is included in Appendix A. 3.1 LOCAL WATER REGULATIONS Local regulations potentially impacting the District's water system infrastructure in the coming years include requirements of the Truckee Sanitary District (TSD), the Tahoe -Truckee Sanitation Agency (T- TSA), and other Truckee River related requirements. TSD is responsible for wastewater collection throughout the Truckee area. The wastewater is sent to T-TSA facilities for wastewater treatment and eventual discharge into the Truckee watershed. TSD is one of five member agencies of the T-TSA, which protect the water quality of Lake Tahoe and the Truckee River under the Porter Cologne Act. The District is permitted to discharge drinking water to the City storm drain system under the California Statewide General NPDES (National Pollutant Discharge Elimination System) Permit for Drinking Water System Discharges. Occasionally, the District allows water main flushing discharge into the sewer system through agreements with TSD and T-TSA. This activity typically occurs only during water main construction projects, and a permit is required from both TSD and T-TSA for temporary discharges into the Farr West Engineering Truckee Donner Public Utility District FWE #1785 2 Water Infrastructure Capital Improvement Plan Development Technical Memorandum sewer system. The District should continue to obtain a Permit for Temporary Discharge into TSD facilities for each applicable construction project to allow flushing of water mains into the sanitary sewer. 3.2 STATE WATER REGULATIONS State level regulatory requirements identified in this research include Urban Water Management Plans, Making Conservation a California Way of Life, and proposed legislative changes. Collectively these regulatory requirements include water loss calculations and improvements, reporting requirements, water loss audits, water shortage contingency plans, increasing efficiency standards, flood protection plans, and heightened drinking water quality standards including lead, perchlorate, chromium-6, and per- and polyfluoroalkyl substances (PFAS). Requirements pursuant to Making Conservation a California Way of Life may be the most relevant to the CIP. During 2020, the SWRCB is required to adopt performance standards for urban water suppliers which will include volumetric water loss reduction and other performance measures. By June 30, 2020, the SWRCB must adopt long-term standards for measures including indoor residential water use, outdoor irrigation of landscape areas, and water loss from water distribution systems. For more information and the status of proposed legislation, visit http://le in�izislature.ca. og_v. The District holds water right permits and statements for surface water sources (McGlashen, Southside, Tonini, Sheepherder, and Hofert Springs). These water rights are overseen by the SWRCB's Division of Water Rights. Additional state level regulatory considerations include maintaining the District's Division of Water Rights surface water Permits and Statements. Although the District is not currently using water under these rights, minimum reporting requirements should be maintained for compliance. If these rights are used in the future, the District should review the Water Code, Surface Water Treatment Rule, and other regulations to ensure compliance. Additional water planning, including Sustainable Groundwater Management Act (SGMA) and Integrated Regional Water Management (IRWM) initiatives should continue to be considered by the District. Although requirements under SGMA and IRWM are not currently applicable, the requirements should be monitored to ensure future compliance with all regulations. The Truckee River basin is also protected by stormwater regulations. Stormwater discharges are regulated through NPDES permits. The existing SWRCB Region 6 (Lahontan Region) NDPES Municipal Permit includes South Lake Tahoe, Placer and Eldorado counties, but does not include Nevada County and the Truckee -Donner area. Stormwater protection requirements should be maintained to ensure compliance. 3.3 FEDERAL WATER REGULATIONS Federal Level regulatory changes that may impact the District include proposed US EPA changes to water quality standards for perchlorate levels, chromium-6, PFAS, and potential regulatory changes for infrastructure permitting through the US Army Corps of Engineers (USACE) under the Clean Water Act and definitions of Waters of the United States. 3.4 ELECTRICAL REGULATIONS Electrical regulation research focused on potential power supply outage requirements and regulations governing the use of emergency power generators which support the utility system. All portable generators require a permit to operate. The District should continue to maintain permits for portable generators. Air pollution standards for generators are regulated by the local air pollution district, in this case the NSAQMD. Natural gas or propane -fueled generators do not have air quality emissions restrictions. If the District uses diesel fueled generators during emergencies, there are currently no emissions restrictions. This includes generators used during a Public Safety Power Shutoffs (PSPS) event. However, if a diesel generator is used as a prime power source, strict emission regulations are imposed under GARB. California low sulfur (15 Parts Per Million) diesel fuel is required for all diesel generators. In addition, CARB regulations allow for the use of private and public back-up generators during PSPS, such as during high fire risk weather conditions. Legislative Assembly Bill 2182, introduced in 2020, proposes regulatory exemptions for Farr West Engineering Truckee Donner Public Utility District FWE #1785 3 Water Infrastructure Capital Improvement Plan Development Technical Memorandum emergency backup generators at water and wastewater facilities. For more information on CARB regulations, visit www.arb.ca.gov. Electric utilities in Northern California and Northern Nevada have developed policies to implement PSPS in extreme fire -risk situations. Particular environmental conditions, such as strong wind events, high temperatures, and low humidity, warrant the de-energization of power lines and equipment to prevent destructive and deadly wildfires. The District receives its electrical transmission from NV Energy (NVE) in Nevada; therefore, the District is not subject to the requirements of the Cal ISO system. NVE administers PSPS under their Public Safety Outage Management (PSOM) policy. PSPS have recently been initiated in Northern California when environmental conditions warrant but have yet to be initiated by NVE. If NVE initiates PSPS triggered by the PSOM policy the District will be greatly impacted. 3.5 REGULATORY DISCUSSION AND RECOMMENDATIONS The areas of strongest regulatory concern are treatment requirements and water audit and loss prevention. It is understood that arsenic is the water quality constituent of greatest concern for the District. The District currently treats one well source to reduce arsenic levels and other well sources report arsenic levels near the MCL limit. Currently, there are no planned regulatory changes to the arsenic MCL. However, other contaminants are under review for potential inclusion into regulations. Water utility regulatory agencies have not identified any known regulatory changes within the next 10 years which warrant projects to address changes to treatment requirements. The District is recommended to remain informed regarding changes to treatment regulations, as well as MCL limits, and begin a testing regimen for contaminants under consideration for regulatory inclusion. The District currently considers water loss auditing and prevention a high priority. Projects have previously been undertaken to reduce leaks in compromised water mains and establish system metering of all services, sources, and pump stations. Several regulations are forthcoming regarding water auditing and loss prevention, stemming from the Making Conservation and California Way of Life legislation. SWRCB is required to establish regulations identifying specific goals or targets for auditing and reduction over the next several years. The District is encouraged to utilize improved system metering to identify and continue to fund pipeline replacement projects to remove leaking water mains from the system. The District is recommended to remain informed regarding updates to the regulations and adjust the CIP, if necessary, to comply. The District should be prepared for future power outages of their power supply due to PSPS. Further evaluation, discussion, and recommendations of power supply outage analysis is included in Section 4.0. 4.0 POWER SUPPLY OUTAGE ANALYSIS New regulations allow power utilities to shutoff transmission and distribution lines during extreme fire risk conditions to minimize the risk of a wildfire. Impacts to the District's water system resulting from a 7-day power outage were evaluated using several demand scenarios. The results were used to suggest new District projects in preparation of PSPS. The system water consumption was analyzed using the following scenarios for a 7-day power outage event: 1. Maximum Day Demand (MDD) with tanks full. 2. MDD with tanks half full. 3. Winter Day Demand (WDD) with tanks full. 4. Stage 3 Water Conservation Demand with tanks full. 5. Stage 3 Water Conservation Demand with tanks half full. MDD and WDD were included for evaluation during a power outage, which represent the hypothetical maximum and minimum system demands. Stage 3 Water Conservation demands were also evaluated as a Farr West Engineering Truckee Donner Public Utility District FWE #1785 4 Water Infrastructure Capital Improvement Plan Development Technical Memorandum moderate demand scenario during a power outage. It is understood that at this time, the District has not determined the target demand allowance or potential restrictions which will be implemented during a power outage. MDD and Stage 3 Conservation Demand scenarios with both storage tanks full and storage tanks half full were evaluated during a power outage scenario to understand the effects on system production. MDD with storage tanks half full represents a worst -case scenario and WDD with tanks full represents a best -case scenario when evaluating limiting system operations during a power outage. To aid in analysis, Farr West prepared a modification of the District System HGL Map that is included in Appendix B. The exhibit included MDD and WDD for pump stations and production rates for wells. Facilities with existing generators are highlighted yellow and those without generators are highlighted in pink. Tanks highlighted blue indicate that they contain sufficient storage to supply their dependent zone for at least 7 days at WDD. The MDD and the WDD values were taken from the Inter -Zone Transfers 2018 Water Demands figure provided by the District. The Martiswoods Tower storage tank was not considered in the analysis due to District plans to demolish the tank and replace it with a hydropneumatic pump station. The intent of this map was to place all applicable system operational data for review and use. The map presented tanks and the zones they feed and identified the flow of water from wells to given tanks. Farr West analyzed this map to understand if any tanks of a higher HGL could back -feed into a lower tank zone to aid in providing supplemental storage capacity to meet demand requirements for power outage durations. A Stage 3 Water Conservation scenario was analyzed by applying a 30% reduction in water use to MDD values for each zone. Compliance is mandatory under Stage 3 Conservation efforts, with irrigation restricted to 3 days per week. The District's Water Conservation Program was taken from the 2015 Urban Water Management Plan. The various stages are identified in Table 1. Table 1: Water Conservation Stages Stage Water Conservation Requirement Compliance Level 1 Targeted 10% Reduction in Usage Voluntary 2 Targeted 20% Reduction in Usage Mandatory 3 Targeted 30% Reduction in Usage Mandatory 4 Targeted 40% Reduction in Usage Mandatory 5 Targeted 50% Reduction in Usage Mandatory Each pressure zone was analyzed based on the storage tank capacity of that system and daily water consumption. If a pressure zone did not have a dedicated storage tank, the water demand was included with the demand of the tank fed pressure zone providing the water supply. This data provided information on the number of days a storage tank could serve the applicable zone(s) with no District wells feeding the system. The District's system currently has 31 active storage tanks which range in capacity from 100,000 gallons to 1,500,000 gallons, with the average capacity at 240,000 gallons. The inventory excludes Martiswoods Tower, which is planned for demolition, and 3 inactive storage tanks. Most zones are served by a single storage tank with the larger zones with higher demands served by two or three storage tanks. The Truckee System has 31 storage tanks and the Hirschdale System had 1 storage tank. System production was analyzed to determine the additional water volume needed to meet demands during MDD, WDD, and Stage 3 Water Conservation conditions. The well capacities used in each analysis were taken from the Inter -Zone Transfers 2018 Water Demands figure, except for the Hirschdale Well. The Hirschdale Well production rate was taken from the 2012 Water System Master Plan since it is not included Farr West Engineering Truckee Donner Public Utility District FWE #1785 5 Water Infrastructure Capital Improvement Plan Development Technical Memorandum in the 2018 Inter -Zone Transfers Water Demands figure. The system demand versus storage analysis is included in Appendix C. The District currently has 11 active potable well sites throughout the system. Ten wells are located within the Truckee System and one well within the Hirschdale System. The Truckee System's wells range in production rates from 0.41 to 3.89 MGD and the Hirschdale System's well has a production of 0.050 MGD. Fire flow demand is not included in the power supply outage demand analysis. The addition of a fire demand during a power outage will greatly affect available storage. Immediate implementation of the most stringent water use restrictions would be recommended for a fire event occurring during a power outage. The District currently has a well site (Well A) serving a zone with a higher Hydraulic Grade Line (HGL) and would potentially be an option to back feed into lower HGL zones with the installation of a new pressure relief valve. However, the well is currently out of service and the District does not foresee reactivating the well for potable water use in the future. 4.1 MAXIMUM DAY DEMAND (MDD) ANALYSIS The MDD for each zone was used to determine the highest anticipated total water consumption over a 7- day power outage. The MDD value assumes minimal or no conservation efforts are in effect during that time, including limited or normal irrigation and a suggested decrease in indoor water use. 4.1.1 MDD Water Tank Storage Three storage tanks in the system had the capacity to serve the MDD through a 7-day power outage if the tanks were at full capacity at the start of the outage. No storage tanks in the system had the capacity to serve any zones for 7 days under half full conditions. Table 2 identifies the storage tanks with the available capacity when full to serve the applicable zone(s) during a 7-day power outage. Table 2: Tanks with Available Storage Capacity Under Full Conditions Tank Zone 7-Day MDD (MG) Storage Capacity (MG) Soma Sierra Soma Sierra, Donner Trails 0.196 0.200 Ski Run Upper Ski Run, Lower Ski Run 0.091 0.100 Hirschdale Hirschdale 0.070 0.100 The storage tanks shown in Table 2 do not have the capacity to share stored water with a downstream neighboring zone during a 7-day power outage without stressing the currently served zone. Additionally, the MDD in neighboring zones is too high for it to make a significant impact, therefore, it was determined a new pump station or pressure relief station for interzone transfer during a Public Safety Power Shutoff is not warranted. The 29 system storage tanks without 7-day MDD storage capacity (not identified in Table 2) have the available storage to serve the applicable zone(s) for 0.6 to 2.5 days during MDD if the tanks were at full capacity. If these 29 tanks are at half capacity, they would have the available storage to serve the applicable zone(s) for less than one day during MDD. The storage tanks identified in Table 2 would have available storage to sustain the applicable zones for approximately 4 days with the tanks at half capacity during MDD. Appendix C details the available storage, the demand, and the number of days a tank can serve a zone under full tank and half tank MDD conditions. During the MDD analysis, it was determined that three storage tanks, identified in Table 3, do not have the capacity to serve the applicable zones under MDD and full storage conditions for one day. The zones supplied by these tanks have a higher demand than available storage and can be sustained for less than one day. It is recommended to immediately implement the most stringent water use restrictions for these zones and fill the storage tanks to full capacity ahead of a suspected power outage. Farr West Engineering Truckee Donner Public Utility District FWE #1785 6 Water Infrastructure Capital Improvement Plan Development Technical Memorandum Table 3: Tanks with Less than One Day of Service at Full Capacity Tank Zone 1-Day MDD (MG) Storage Capacity (MG) Wolf Estates Donner Lake-6124, Red 0.275 0.230 Mountain Hydro, Wolfe Hydro Ponderosa Ponderosa Palisades, West 0.512 0.400 Palisades Palisades Hydro, Palisades Hydro, Martiswoods Glenshire Lower Glenshire 2, Waterloo, Icknield 1.312 0.740 4.1.2 MDD Water System Supply The additional water volume required to meet the 6.28 MGD (full tank) and 6.91 MGD (half tank) MDD system demands over a 7-day power outage was determined using the difference from the daily water consumption and the available storage for each zone. When all tanks are full at 8.79 MG storage, approximately 6.28 MGD of additional supply is needed to supplement storage volume to account for the total system MDD requirement. Currently, only two production facilities (Airport Well and Prosser Village Well) have back up power supply. The total production available to the District during a power outage is from these two wells yielding a total of 3.11 MGD, 3.17 MGD short of the required system production demand. The District has identified installation of a generator at the Martis Valley No. 1 Well as a high priority project in the 2021 CIP. When the generator at the Martis Valley No. 1 Well is installed, total production during a power outage will increase to 5.34 MGD but will be 0.94 MGD short of the required demand. Additional generators are needed at other production facilities to sustain complete MDD system demands during a power outage. A second review of the complete MDD system demand scenario was analyzed if tanks were not completely full prior to a power outage. Without understanding the District's storage tank operational parameters and SCADA, not part of this Project, a scenario was reviewed with all storage tanks at half full levels. This analysis can provide a range of possibilities to allow the District to better understand the range of impacts and severities when considering priority facilities. If tanks are not at full capacity at the time of a power outage, the production deficit increases by approximately 0.63 MGD to 6.91 MGD. Table 4 compares the system demand with the production capacities of well sites with proposed and existing permanent generators. Farr West Engineering Truckee Donner Public Utility District FWE #1785 7 Water Infrastructure Capital Improvement Plan Development Technical Memorandum Table 4: MDD Well Production Capacity MDD (Tanks MDD (Tanks Well Site (MGD)* Permanent Generator at Full at Half Capacity) Capacity) Yes (50% production Airport 1.95 capacity due to shared generator with pump station) 6.28 MGD 6.91 MGD Prosser Village 1.16 Yes (Production (Production Total (Without 3.11 needed in needed in Martis Valley No. 1) addition to addition to storage) storage) Martis Valley No. 1 2.23 Planned Total (With Martis 5.34 Valley No. 1) * Production Capacities taken from the Inter -Zone Water Transfers 2018 Water Demands Figure. Airport well production when running on generator reduced by half since existing generator supplying well and pump station does not have power to run both facilities at maximum capacity. 4.2 WINTER DAY DEMAND (WDD) ANALYSIS The WDD for each zone was used to determine the most conservative total water consumption over a 7- day power outage. The WDD value is reflective of a low demand period when no outdoor irrigation is occurring. WDD values were provided by District staff during this analysis as values were not present in past reports. 4.2.1 WDD Water Tank Storage The six storage tanks identified in Table 5 have the capacity to serve the WDD through a 7-day power outage, if the tank was at full storage capacity when the power outage began. Table 5: Tanks with Available Storage Capacity Under Full Conditions Tank Zone 7-Day WDD (MG) Storage Capacity (MG) Soma Sierra Soma Sierra, Donner Trails 0.070 0.200 Ski Run Upper Ski Run, Lower Ski 0.014 0.100 Run Glacier, Upper Skislope, Glacier Middle Skislope, Lower 0.140 0.150 Skislope Prosser Heights (includes Prosser Annex, original Upper Lakeview), 0.385 0.430 Prosser Heights Heights Hydro Glenshire Upper Glenshire 1 0.490 0.490 Hirschdale Hirschdale 0.042 0.100 The storage tanks identified in Table 5 do not have the capacity to share stored water with a downstream neighboring zone during a 7-day power outage without stressing the currently served zone. The WDD in neighboring zones is too high for it to make a significant impact; therefore, it was determined a new pump station or pressure relief station for interzone transfer during a PSPS is not warranted. Farr West Engineering Truckee Donner Public Utility District FWE #1785 8 Water Infrastructure Capital Improvement Plan Development Technical Memorandum The remaining 26 storage tanks in the system have the available storage to serve the applicable zone(s) for 2.5 to 5.1 days, if the tanks were at full capacity. These tanks would require supplemental supply from well production facilities to serve the zone during a 7-day power outage event. Appendix C details the available storage, the demand, and the number of days a tank can serve a zone under full tank WDD conditions. 4.2.2 WDD Water System Supply When tanks are full at 8.79 MG storage, approximately 1.25 MGD of production is needed to match WDD. Currently, only two production facilities (Airport Well and Prosser Village Well) have back up power supply. The total production from these two wells during a power outage is 3.11 MGD. Table 6 compares the system demand with the production capacities of well sites with proposed and existing permanent generators. Table 6: WDD Well Production Well Site Capacity Permanent Generator WDD (Tanks at Full (MGD)* Capacity) Yes (50% production Airport 1.95 capacity due to shared generator with pump station) 1.25 MGD (Production needed in Prosser Village 1.16 Yes Total (Without Martis 3.11 Valley No 1) addition to storage) Martis Valley No. 1 2.23 Planned Total (With Martis Valley 5.34 No 1) * Production Capacities taken from the Inter -Zone Water Transfers 2018 Water Demands Figure. Airport well production when running on generator reduced by half since existing generator supplying well and pump station does not have power to run both facilities at maximum capacity. The additional water volume required to meet the remaining 1.25 MGD WDD system demand over a 7-day power outage is less than the 3.11 MGD total production from the Airport and Prosser Village Well sites. Under these conditions, an additional permanent generator is not needed in the system. 4.3 STAGE 3 WATER CONSERVATION The District's Stage 3 Water Conservation enforces a mandatory 30% reduction in water use and restricts irrigation to 3 days per week. For this analysis, the MDD values for each zone were reduced to 70% of the full demand value. 4.3.1 Stage 3 Water Conservation Water Tank Storage Three storage tanks have the capacity to serve the applicable zones during a 7-day power outage. As with the MDD and WDD analysis, the storage tanks identified in Table 7 do not have the capacity to share stored water with a neighboring zone during a 7-day power outage without stressing the currently served zone. Farr West Engineering Truckee Donner Public Utility District FWE #1785 9 Water Infrastructure Capital Improvement Plan Development Technical Memorandum Table 7: Tanks with Available Storage Capacity Under Full Conditions Tank Zone 7-Day SW3C (MG) Storage Capacity (MG) Soma Sierra Soma Sierra, Donner Trails 0.140 0.200 Ski Run Upper Ski Run, Lower Ski R 0.070 0.100 Hirschdale Hirschdale 0.063 0.100 During the Stage 3 Water Conservation analysis, it was determined that the Glenshire Lower storage tank does not have the capacity to serve the applicable zones under Stage 3 Water Conservation efforts and full storage conditions for one day. The Glenshire 2, Waterloo, and Icknield zones have a higher demand than available storage and can be sustained for less than one day. It is recommended to immediately implement more stringent water use restrictions for these zones and load the storage tank to full capacity ahead of a power outage. The remaining 29 storage tanks in the system have the available storage to serve the applicable zone(s) for 0.8 to 3.5 days if the tanks were at full capacity. If the tanks are at half capacity, the remaining 29 storage tanks have the available storage to serve the applicable zone(s) for 0.4 to 1.76 days. The storage tanks identified in Table 7 would have available storage to sustain the applicable zones for approximately 4 days if the tanks were at half capacity. Appendix C details the available storage, the demand, and the number of days a tank can serve a zone under full tank and half tank MDD conditions. 4.3.2 Stage 3 Water Conservation Water System Supply When tanks are full at 8.79 MG storage, approximately 4.04 MGD of supply is needed to match Stage 3 Water Conservation Water System demands of 5.28 MGD. Currently, only two production facilities (Airport Well and Prosser Village Well) have back up power supply. The total production from these two wells during a power outage is 3.11 MGD. The District has identified installation of a generator at the Martis Valley No. 1 Well as a high priority project in the 2021 CIP. When the generator at the Martis Valley No. 1 Well is installed, total production during a power outage will increase to 5.34 MGD. Table 8 compares the system demand with the production capacities of well sites with proposed and existing permanent generators. Farr West Engineering Truckee Donner Public Utility District FWE #1785 10 Water Infrastructure Capital Improvement Plan Development Technical Memorandum Table 8: Stage 3 Water Conservation Well Production Stage 3 Stage 3 Well Site Capacity Permanent Generator (Tanks at (Tanks at (MGD)* Full Half Capacity) Capacity) Yes (50% production Airport 1.95 capacity due to shared generator with pump station) 4.04 MGD 4.65 MGD Prosser Village 1.16 Yes (Production (Production Total (Without 3.11 needed in needed in Martis Valley No 1) addition to addition to storage) storage) Martis Valley No. 1 2.23 Planned Total (With Martis 5.34 Valley No 1) * Production Capacities taken from the Inter -Zone Water Transfers 2018 Water Demands Figure. Airport well production when running on generator reduced by half since existing generator supplying well and pump station does not have power to run both facilities at maximum capacity. Production from the Airport and Prosser Village wells is not sufficient to satisfy demands during a power outage with Stage 3 Water Conservation implemented. However, after a generator is installed at the Martis Valley No. 1 Well (as currently planned), Stage 3 Water Conservation demands (with tanks full or half full) would not require additional water production facilities to be operational during a power outage scenario. 4.4 HIRSCHDALE WATER SYSTEM The Hirschdale water system is a separate system within District boundaries, consisting of one well, one storage tank, and one pressure zone. Demands for this system were provided by the District using data collected from February 2019 (WDD) and July 2019 (MDD). At full capacity, the storage tank can sustain the system for more than 7 days under MDD, WDD, and Stage 3 conditions. The Hirschdale Well can produce approximately 35 gallons per minute, with system demands of approximately 9 gallons per minute for MDD, 4 gallons per minute for WDD, and 6 gallons per minute for Stage 3 conditions. The District anticipates connecting the Hirschdale System to the Truckee System in the future. It is not recommended to install a permanent generator on the well site, as the well may be taken out of service when the connection is made to relieve the District from maintaining the arsenic, iron, and manganese treatment system. The District should consider the interconnection as a priority over other Hirschdale improvements. Until the interconnection to the Truckee System can be made, it is recommended to fill the storage tank to full capacity ahead of a potential power outage. 4.5 POWER OUTAGE ANALYSIS DISCUSSION AND RECOMMENDATIONS It is understood that the District wishes to provide service to all customers during the entire duration of a potential 7-day power outage event. Allowable customer demands on the system will largely govern the scope and extent of projects to satisfy customer demands. The analysis in this study did not include evaluation of additional system water storage as an option to satisfy system demands during a power outage. Therefore, the means to keep customers supplied with water service will focus on ensuring emergency power (generators) is established at facilities necessary to achieve system supply. The District is recommended to consider additional system water storage in future system analyses. The District currently has permanent generators at 20 pump stations and water production facilities throughout the system. Two portable generators are currently assigned specifically to the Dormer Trails and Soma Sierra Pump Stations. Farr West Engineering Truckee Donner Public Utility District FWE #1785 11 Water Infrastructure Capital Improvement Plan Development Technical Memorandum As described in Section 4.0, an analysis was performed to understand the flow path of water from production wells to storage tanks. Ultimately, this analysis was able to identify which pump stations are critical to supplying water throughout the District's water system. Upon evaluation, existing generators allow for water to be supplied and conveyed throughout most of the water system during a power outage. During a power outage, system operation is dependent upon generators having sufficient fuel capacity to continue operation during power outages. To fully understand a fuel consumption analysis of the District's generators, additional detailed information would be required, and an in-depth study performed which is beyond the scope of this memorandum. This complex effort should involve evaluation of an extended simulation of the system hydraulic water model and operational requirements and specifications of system generators. The District is encouraged to further evaluate the fuel consumption needs of system generators during a power outage and develop a plan for operation necessary for water conveyance. 4.5.1 Pump Stations District pump stations have the capacity to match, and in most cases, greatly exceed the demands of the zone(s) supplied. Many pump stations throughout the system already have available emergency generators, either permanent or mobile. Table 9 summarizes current generator status at pump stations throughout the system. The District currently has the capability to provide emergency power at all but one of the critical pump stations in the system through permanent or mobile generators. Critical pump stations are assumed to be a single pathway for water to feed into the next zone and to supply each water storage tank. The system is comprised of both traditional and hydropneumatic pump stations. Traditional pump stations supply zones which include a storage tank. Hydropneumatic pump stations supply zones without storage tanks. In a power outage situation, hydropneumatic zones would not have a water supply, even temporarily, unless the associated pump station was supplied power from a generator. Zones with storage tanks would have a temporary water supply from tanks, but in most cases, this supply is not enough to support zone demands during WDD, Stage 3 Water Conservation, or MDD conditions. Therefore, generators are necessary for both traditional and hydropneumatic pump stations. Pump station facilities that do not have permanent generators include Gateway Hydropneumatic, Soma Sierra, Donner Trails, Falcon Point, Alder Creek, West Palisades Hydropneumatic, and Martiswoods. The Gateway hydropneumatic pump station currently has neither a permanent generator or a dedicated trailer mounted generator and is the only existing critical facility without backup power. The Falcon Point and Alder Creek pump stations are assumed to be redundant to the Innsbruck and Herringbone pump stations, respectfully, and therefore do not require generators for critical water conveyance. The Donner Trails and Soma Sierra pump stations are currently assigned mobile, trailer -mounted generators. The Soma Sierra, Donner Trails, West Palisades, and Martiswoods pump stations are scheduled to have permanent generators installed in 2021 as part of the 2021 CIP. Installation of permanent generators at Soma Sierra and Donner Trails Pump Stations would alleviate mobile generators assigned to these facilities for use at other sites or as emergency back-up for permanent generators. The District may also consider the option of converting the mobile generators to permanent generators at the Donner Trails and Soma Sierra pump stations if both meet current emissions standards. This would reduce capital cost by removing the purchase of two new generators. The District should consider an in-depth analysis of generators, pump stations, and zone demands to understand system requirements. All pump stations in the system are over -sized and can convey current demands for MDD, WDD, and Stage 3 Water Conservation conditions. Existing generators for all pump stations are assumed to be appropriately sized and have the capacity to serve the facility demand during emergency situations. Farr West Engineering Truckee Donner Public Utility District FWE #1785 12 Water Infrastructure Capital Improvement Plan Development Technical Memorandum Table 9: Generator Status at System Pump Stations Pump Station Capacity (MGD) MDD (MGD) WDD (MGD) Stage 3 Cons. (MGD) Generator Status Airport Unknown - - - Existing Permanent Gateway Hydro 1.44 0.001 0.001 0.001 Needs Generator Donner Trails 5.61 1.856 1.01 1.30 Trailer, Proposed Permanent Soma Sierra 5.61 1.828 1.00 1.30 Trailer, Proposed Permanent Sitzmark Hydro 0.720 0.018 0.003 0.013 Existing Permanent Falcon Point* 2.16 0.693 0.404 0.485 Not Needed (redundant booster) Innsbruck* 2.30 0.693 0.404 0.485 Existing Permanent Stockholm 1.58 0.116 0.04 0.081 Existing Permanent Pinnacle Hydro 0.720 0.036 0.015 0.025 Existing Permanent Roundhill Hydro 0.720 0.001 0.001 0.001 Existing Permanent Herringbone** 1.51 0.270 0.211 0.189 Existing Permanent Alder Creek** 1.30 0.270 0.211 0.189 Not Needed (redundant booster) Donner View Hydro 0.720 0.013 0.007 0.009 Existing Permanent Ski Lodge 0.922 0.074 0.002 0.052 Existing Permanent Ski Run 0.576 0.061 0.020 0.043 Existing Permanent Richards 3.24 0.537 0.247 0.376 Existing Permanent Wolfe Estates Hydro 1.19 0.011 0.002 0.008 Existing Permanent Red Mountain Hydro 0.432 0.004 0.002 0.003 Existing Permanent Sierra Meadows 1.72 0.512 0.078 0.358 Existing Permanent Palisades Hydro 1.30 0.032 0.007 0.022 Existing Permanent Martiswoods 0.864 0.063 0.006 0.044 Proposed Permanent West Palisades Hydro 0.058 0.005 0.001 0.004 Proposed Permanent China Camp 1.72 0.435 0.125 0.305 Existing Permanent Prosser Heights 1.53 0.017 0.006 0.012 Existing Permanent Strand 0.860 0.283 0.070 0.198 Existing Permanent * The demand is assumed to be split between the two pump stations. During a power outage, the pump station with a permanent generator has the capacity to manage full demands. ** The demand is assumed to be split between the two pump stations. During a power outage, the pump station with a permanent generator has the capacity to manage full demands. Farr West Engineering Truckee Donner Public Utility District FWE #1785 13 Water Infrastructure Capital Improvement Plan Development Technical Memorandum 4.5.2 System Production (Wells) Existing District storage tanks do not contain sufficient capacity to provide enough water to meet system demands during a 7-day power outage event, as identified previously in Section 4.1.1. Therefore, sufficient production capacity must be provided by wells with generator backup to supply the required additional capacity. Existing generators are located at the Airport and Prosser Village production facilities. The generator at the Airport production facility was installed in 2019 after the project was identified in the 2012 CIP. Installation of a generator at the Martis Valley No. 1 Well was also scheduled in the 2012 CIP but has not yet been installed. Installation of the Martis Valley No. 1 production facility generator is scheduled to be installed in 2021 as a high priority project in the 2021 CIP. Planning for generator installation projects at water production facilities will depend upon the level of water use restrictions the District is willing to impose on customers during a 7-day power outage event. Assumptions for how full system tanks are at the onset of a power outage also play a critical role in planning for water production facility generator installations. Table 10 summarizes current water production site generator status throughout the system. Table 10: Generator Status at System Water Production Sites Well Site Production Capacity (MGD)* Generator Status Airport 1.95 Existing Glenshire Drive 2.62 None Martis Valley No. 1 2.23 Planned Sanders 0.41 None Prosser Village 1.16 Existing Old Greenwood 1.30 None Prosser Annex 0.72 None Prosser Heights 0.60 None No. 20 0.89 None Northside 0.83 None Hirschdale 0.050 None Total System Capacity 13.21 MGD Generator Capacity 5.34 MGD * Production Capacities taken from the Inter -Zone Water Transfers 2018 Water Demands Figure. Airport well production when running on generator reduced by half since existing generator supplying well and pump station does not have power to run both facilities at maximum capacity. During a power outage, the Airport and Prosser Village Wells can produce 3.11 MGD. Existing power outage production capacity exceeds the 1.25 MGD difference between demand and full tank storage volume for WDD. However, the difference between demand and full tank storage volume for Stage 3 Water Conservation demands and MDD cannot be met. The addition of the planned generator installation at the Martis Valley No. 1 Well allows power outage system production to make up the difference between demand and full tank (4.04 MGD) or half full tank (4.65 MGD) storage in the Stage 3 Water Conservation scenario. However, even with the addition of the generator at the Martis Valley No. 1 Well, production cannot match the difference between full tank storage Farr West Engineering Truckee Donner Public Utility District FWE #1785 14 Water Infrastructure Capital Improvement Plan Development Technical Memorandum volume and demand for MDD conditions. Additional wells would require generator installation to satisfy an MDD scenario. As previously discussed in Section 4.1.2, if all storage tanks are full the MDD requires an additional 3.17 MGD from well production. With the addition of the Martis Valley No. 1 Well generator, an additional 2.23 MGD is provided, reducing the production need to 0.94 MGD. The Old Greenwood Well site, with the production rate of 1.30 MGD, is the ideal well that could make up the difference to fully supply the District during MDD conditions through a power outage. Glenshire Well would also suffice, but is much larger, would have excess capacity, and require a larger generator. To meet MDD conditions with tanks half full during a power outage, generators would need to be installed at production facilities producing a minimum of 1.57 MGD of supply in addition to the production capacities of the Airport, Prosser Village, and Martis Valley No. 1 Well sites. Currently the Glenshire Well, with a production rate of 2.62 MGD, appears to be the only well capable of producing the supply necessary to meet MDD conditions with tanks half full. Therefore, the District should consider implementing procedures to fill tanks ahead of conditions which may warrant a power outage. The District may consider implementing a Stage 3 Water Conservation directive to its customers during emergency power outages rather than installing an additional permanent generator at a fourth well site to satisfy MDD. The capital cost for a generator at a fourth production facility may not justified to supply MDD during power outages. 5.0 COST ESTIMATING CRITERIA The preparation of the CIP's current and future cost estimates includes the development of specific individual project costs and average unit pricing for future (non-specific) projects. Individual cost estimates were developed for new projects identified from regulatory or power outage impacts and uncompleted 2012 CIP projects. Evaluation of multiple criteria to create average universal unit rates was performed which the District can utilize for budgeting purposes for both near term and long-term project costs for non-specific projects. The cost estimates include a cost basis analysis and a cost factor analysis. A cost basis analysis involves the review of previous unit pricing as well as direct cost factors that affect the baseline cost of the work. This includes the evaluation of special factors that affect the unit price or scopes of work that do not have recent cost history. Cost basis analysis incorporates the following: • Average unit price of previous District items of similar scope, • Comparison of average unit price of items of similar scope from neighboring jurisdictions, • Detailed cost estimates of items without recent cost history, and • Current material pricing, labor rates, equipment rates, and operation costs. Special factors and considerations include areas with an increased number of residential services (reduced productivity), high traffic areas, ROW crossings and encroachment situations, and uncommon or unique scopes of work. Cost factor analysis is the evaluation of escalation, fee, and overhead factors that result in multipliers to the base cost. The analysis incorporates projected overhead fees on completed work, projected fee/profit based on current market and competition projects, labor escalations including short term (known) and long term (projection), equipment escalation, and material escalation. A detailed cost analysis of the specific and most frequent bid items was performed using the following basis shown in Table 11 for cost estimating. Farr West Engineering Truckee Donner Public Utility District FWE #1785 15 Water Infrastructure Capital Improvement Plan Development Technical Memorandum Table 11: Cost Anal sis Basis* Cost Basis Inclusions Labor includes the wages, benefits, and taxes associated with separate trade Labor classifications. Examples include laborer, equipment operator, and carpenter trades. Prevailing wage rates, Davis -Bacon wage rates, and Union wage scale are evaluated to determine hourly labor cost. Equipment rates include the typical rental equipment rates for heavy equipment, as Equipment well as fuel consumption, wear parts, and routine maintenance and preventative care. These criteria are utilized to determine operated equipment hourly costs. Material" Material pricing for pipe, valve, fittings, and accessories are provided from local wholesale and retail suppliers. * All cost basis criteria are based on Q1-2020 data and no escalation is applied in the initial cost evaluation. ** Considerations for material cost analysis included current unit price rates from material suppliers in the Reno/Tahoe/Truckee market with applicable submittals, certifications, delivery, and sales tax. Using the cost basis information, a detailed estimate was created based on the average daily productivity from location conditions and industry practice. The estimate includes all costs of the work associated with a complete installation or rehabilitation. A pipeline would include, for example, sawcutting, AC removal and disposal, excavation, pipeline installation, backfill, grading, street restoration, and associated traffic control. Productivity would vary based on the number of service laterals or anticipated encumbrances and size of pipe. Percentage allocation of valves and service laterals/meters are included. A project overhead factor is included, as well as a factor for anticipated profit. Standard percentages for mobilization, contingency, engineering, inspection, legal, and permitting were used. No land acquisition fees were assumed or included. Generally, the applied contingency is 10%; however, a 20% contingency was used for well replacement projects due to a higher likelihood of additional work developing when pump assemblies are removed from the well. Planning level cost estimates for proposed projects are included in Appendix D. The detailed cost estimate was created using HCSS Heavy -Bid estimating software. A copy of each project's cost estimate detail is included in Appendix E. Database productivity software was not used due to the program's lack of ability to accurately represent the local conditions, market, and labor challenges. The cost basis unit price was evaluated against the unit prices from recent bids from within the District's system, as well as neighboring jurisdictions. The cost estimate was used to evaluate known escalation percentages for labor and materials in the near term and the impact on the overall cost so an escalation factor can be determined and included for subsequent years. A year over year escalation factor of 4.0% was applied to the longer -term projects, as well as an increased contingency factor. A breakdown of the year over year (YOY) escalation is shown in Table 12. Farr West Engineering Truckee Donner Public Utility District FWE #1785 16 Water Infrastructure Capital Improvement Plan Development Technical Memorandum Table 12: 4.0% Escalation Factor Breakdown Cost Type % of % % of Total ote mm Total Increase Increase mim Labor market is expected to grow based on supply and demand of labor. Indicators based on union wage Labor 25% 4% 1.00% negotiations show 2% - 7.5% YOY increases to base wage, as well as fringe benefit packages consistently across all trades. Equipment costs are expected to have modest YOY Equipment 15% 3% 0.45% growth as newer equipment is acquired with advanced tiered engine emissions standards, as well as increased costs for maintenance (labor). Material costs can fluctuate greatly as innovations and varying raw material costs push cost up and down. Long term growth is typically 2.0 % - 3.0%, Materials 40% 5% 2.00% however, raw material costs have been steady for extended periods of time and are expected to increase. Upward pressure on production and delivery labor will have a greater impact on material costs. Overhead costs will increase as indirect labor and Overhead* 10% 4% 0.40% materials increase, as well as regulatory standards continue to progress. Fee/Profit 10% 0% 0.00% Assume profit margins remain constant. 100% 3.9% 4.0% YOY Escalation * Future projections incorporate anticipated higher levels of effort required for additional safety personnel, supplies and reporting, environmental personnel and reporting, and payroll systems and certification. These factors have increased direct project overhead as a percentage from approximately 7-10% over the past 15-20 years, based on experience. Cost estimates were prepared using a weighted average unit price. Due to the numerous factors that affect unit pricing, as well as variations in the bid tabs, if no recent unit prices were available, the estimated unit price was used. This unit pricing was incorporated into major items that could be quantified. Allowances were included in each project estimate to create a total cost for each identified project and to create a baseline estimate for projects which are similar in nature, such as storage tank coating or PRV replacement. Projects such as well or pump station rehabilitation and emergency generator installation are unique to the size of the pumps, flow rates, horsepower, and electrical demands in both MDD and WDD conditions. These variations make generalizing project costs difficult and produce inaccurate results. For this reason, well pump, pump station, and emergency generator projects have been identified separately and individual budgets have been created. Emergency generators typically have an integral fuel storage tank capable of providing average run times for 12 — 24 hours depending on the engine load. In a prolonged outage, this may not be sufficient. It is recommended the District develop a plan for daily fueling or additional fuel storage capacity. Sizing of fuel tanks will depend on the expected outage duration, fuel demands for the anticipated outage, and desired frequency of fueling. Alternately, a central fuel storage facility may be considered with mobile fueling equipment and internal fuel delivery. Both options are accompanied by initial capital and periodic Farr West Engineering Truckee Donner Public Utility District FWE #1785 17 Water Infrastructure Capital Improvement Plan Development Technical Memorandum maintenance costs. Initial budgetary costs are between $10 - $12 per gallon of fuel storage for fixed site storage. 6.0 10-YEAR CAPITAL IMPROVEMENT PLAN Farr West produced an updated 10-year CIP for the District spanning the years 2021-2030. The 2021 CIP is largely based on information from the 2012 CIP, input from the District, and analysis performed as part of the project scope. Projects included in the CIP were established from the following sources: 1. Include 2012 CIP projects scheduled between the years 2012-2030 which have not been constructed. Exclude projects not completed within the 2012 CIP that were originally proposed to accommodate additional capacity to serve growth. 2. Add projects determined to be necessary resulting from the review of regulatory impacts or power outage analysis. 3. Incorporate additional projects as directed by the District. Assumptions regarding project scope (for both specific and generic projects) were presented to and confirmed by the District. When evaluating the system during a 7-day power outage event, the assumption was that the system goal is to provide water to all customers during a power outage scenario. However, depending on the length of a power outage, supply to large irrigation services may be suspended. Service priority will be to provide water to all residential customers for domestic use during a power outage scenario. The District provided guidance on the remaining projects that were of higher priority. High priority projects not completed from the 2012 CIP include the Martiswoods pump station replacement and tower demolition, installing permanent stand-by generators at Martis Valley No. 1 Well, Donner Trails pump station, Soma Sierra pump station, and the West Palisades Hydropneumatic pump station. The updated CIP incorporates the District's preferences for adding projects, project prioritization, and project frequency, including targeting three tank rehabilitations per year, two pump station rehabilitations each year, one well rehabilitation per year, and highest priority for the Martiswoods pump station replacement and other generator projects. Projects were prioritized using the following classifications: 1. High priority projects shall be considered critical to the continued operation of the water system and the ability of the District to provide water services to its customers. 2. Medium priority projects shall be considered necessary to comply with regulatory requirements and maintain the current condition of the existing water system assets. 3. Low priority projects represent all other projects shall be considered low priority. 6.1 PUMP STATIONS Pump station projects were included in two categories: complete replacement, and pump and motor assembly replacement. Pump and motor replacements are included for all pump stations not being replaced during the 2021 CIP timeframe. Select pump stations have been chosen by the District to be completely replaced. Complete replacement includes replacement of buildings, pumps and motors, associated piping, valving, generators, meters, telemetry, VFDs, PLC, and SCADA systems to improve efficiency. Pump and motor replacement (whether as a standalone project or facility replacement) is assumed to require the same number of pumps and total horsepower for the pump station. Hydropneumatic pump stations were based on the skid mounted pump station example by R.F. MacDonald Company supplied by the District, as well as a permanent generator to ensure customer supply during a power outage event. Based on existing District generator inventory, it is assumed new generators will be Cummins brand and housed in a weatherproof enclosure not within a building. As part of the 2012 CIP, the District had proposed to convert the existing Martiswoods pump station into a hydropneumatic pump station and demolish the Martiswoods Tower storage tank, as well as upgrade the West Palisades hydropneumatic pump station. Both projects are considered a high priority of the District and are proposed to be completed in 2021. To comply with regulatory impacts, the projects include the Farr West Engineering Truckee Donner Public Utility District FWE #1785 18 Water Infrastructure Capital Improvement Plan Development Technical Memorandum installation of a permanent stand-by generator. Additional pump station projects requested by the District include rehabilitation of the Pinnacle hydropneumatic pump station and Innsbruck pump station, proposed to be completed in 2025 and 2029, respectively. The construction costs for the projects mentioned include specific individual budgets. The Donner Trails and Soma Sierra pump stations emergency power is currently served by a mobile, trailer mounted generator. Installing permanent stand-by generators at both sites was proposed as part of the 2012 CIP. Since the District owns existing trailer mounted generators dedicated to these facilities, the District should investigate the possibility of converting the trailer mounted generator units to permanent units. These two generators are sized for two of the larger pump stations within the system and would be oversized if used as mobile, trailer mounted generators. The District could possibly purchase a new mobile generator that could be smaller in size. Nevertheless, the cost estimate for a permanent generator to be installed at both sites in 2021 is based on the purchase of a new generator. It is recommended the District install a new permanent generator at the Gateway Hydropneumatic pump station to prepare for Public Safety Power Shutoffs. This project is considered to stem from regulatory changes and is proposed to be completed in 2021. 6.2 STORAGE TANKS Storage tank rehabilitation can include internal and external coating replacement, various appurtenance maintenance, or structural and seismic upgrades to meet current seismic code. Current tank conditions are unknown and individual assessments were not performed for this technical memorandum. A generic approach based on the average size tank in the system was utilized to determine rehabilitation costs per year. The District's system currently has 31 active storage tanks which range in capacity from 100,000 gallons to 1,500,000 gallons. The average tank capacity is 240,000 gallons. The storage tank inventory excludes Martiswoods Tower, which is planned for demolition when the Martiswoods pump station is converted to a hydropneumatic pump station. Of the 31 tanks in the system, 24 were constructed prior to 1990. Storage tanks within this category are assumed to require both interior and exterior coating, as well as seismic retrofitting, and are planned for rehabilitation at the rate of three per year from 2021 to 2028. The six tanks constructed between 1990 to 1999 are assumed to only need interior and exterior coatings. The tanks are planned for rehabilitation at three per year in 2029 and 2030. The two tanks constructed after 2000 are not included in the 10-year CIP. It is recommended the District implement a storage tank condition assessment program prior to prioritizing older tanks for rehabilitation due to lack of condition records. The program should include, but is not limited to, assessing the exterior coating by performing adhesion and lead paint tests, examining the roof for rusted areas, and performing a dive inspection to assess the interior coating condition. The District should rehabilitate and retrofit individual tanks as part of one project to minimize disturbance on new tank coatings and facilities. 6.3 WELL SITES Well rehabilitation can vary from pump and motor replacement to full above ground facility replacement. Full facility replacements include the pump, motor, and cable assembly as well as any above ground facilities including the building and sodium hypochlorite dosing system. It is assumed only potable wells will require any rehabilitation. Generator additions and rehabilitation can vary from installing generators at critical facilities for emergency power to general maintenance. Based on existing District generator inventory, it is assumed new generators will be Cummins brand and housed in a weatherproof enclosure, not within a building. The District identified that the Northside Well and Sanders Well are planned for above ground facility replacements in 2023 and 2027, respectively. During facility replacement, it is assumed the existing pumps Farr West Engineering Truckee Donner Public Utility District FWE #1785 19 Water Infrastructure Capital Improvement Plan Development Technical Memorandum and motors will be replaced and have been factored into the cost estimate. The Airport Well's well bore and casing are not completely vertical and there is significant offset in the casing. As a result, the Airport Well is on a five-year cycle for pump and motor replacement, which is proposed for rehabilitation in 2022 and 2027. The eight remaining active potable wells in the system are each proposed to undergo a pump and motor replacement within the next 10 years. Cost estimates were formed based on three well capacity categories: 300 to 500 GPM, 600 to 1,000 GPM, and 1,200 to 1,500 GPM. Pump and motor replacements were prioritized based on well production rates, with the highest producing wells undergoing replacement in the earlier years. It is recommended the District evaluate the condition of each well site and prioritize rehabilitation based on the useful life of each pump and motor and reorder the project as needed. 6.4 PIPELINE REPLACEMENT A condition assessment of existing pipeline infrastructure was not performed, and leak data was not provided. For planning purposes, replacement pipeline costs have been calculated for 4", 6", 8", 10", and 12" DR 14 Class 305 PVC C900 in residential neighborhoods with basic traffic control requirements and a fixed amount of service connections per linear foot of pipe. The District currently accepts the installation of both PVC and ductile iron pipe. Table 13 compares the single bid item cost per linear foot between Ductile Iron and the District's preferred PVC pipe. Table 13: Ductile Iron (DI) Pipe vs. DR 14 Class 305 C900 Cost Comparison Description MO Unit PVC Cost % Increase for DI Ductile Iron Cost 4" Water Main LF $76.00 74% $132.24 6" Water Main LF $116.00 37% $158.92 8" Water Main LF $170.00 29% $219.30 10" Water Main LF $176.00 28% $225.28 12" Water Main LF $208.00 24% $257.92 The proposed linear footage for each year that includes replacement projects was derived from the average length of pipeline replaced by the District between 2014 and 2018. These projects included installation of 8" and 12" water main at an average length of 3,300 LF and 550 LF, respectively. Table 14 compares the generic complete average cost to install a new water main. A detailed cost breakdown of the difference between water main sizes is included in Appendix E. Table 14: All -In Average Cost for DR 14 C900 PVC Water Main Replacement Description my Cost per LF Notes 4" Water Main $564.87 Includes mobilization, pipe material, water services, fire 6" Water Main $632.79 hydrants, system connections, 8" Water Main $648.75 rock excavation, AC pavement and base material, miscellaneous 10" Water Main $734.66 work, and contingencies 12" Water Main $738.51 It is recommended the District maintain the pipeline replacement program to comply with Making Conservation and CA Way of Life (AB 1668/SB 606) and limit system water loss through leaking infrastructure. It is also recommended the District evaluate the condition of each potential water main Farr West Engineering Truckee Donner Public Utility District FWE #1785 20 Water Infrastructure Capital Improvement Plan Development Technical Memorandum replacement and prioritize rehabilitation based on the useful life and maintenance requirements and reorder the project as needed. The average length of pipe to derive the presented costs should be used with caution and economy of scale factors should be considered. If a project contains significantly less linear feet or other parameters change that will slow production, the average unit price will increase. 6.5 CONTROL VALVE STATIONS The District currently has 40 control valve stations throughout the Truckee System, with six being inactive. The inactive control valves are not included in the 10-year CIP. The District provided a target budget of $100,000 per year for control valve rehabilitation. Rehabilitations at a rate of four per year from 2021 to 2024 and three per year from 2025 to 2030 will allow the District to perform maintenance on all active control valves in the system while meeting the target budget. The District had proposed three new Pressure Relief Valve (PRV) stations as part of the 2012 CIP. The Hirschdale PRV is proposed to be installed in conjunction with the Hirschdale connection pipeline in 2022. The Oberwald and Pathway PRV stations are proposed to be completed in 2023. 6.6 COST ESTIMATES AND BUDGET Cost estimates for existing and new projects are based on 2020/2021 labor, equipment, and material costs. Projects proposed from 2022 to 2030 were applied with a year over year escalation factor of 4.0%. The District provided a target yearly budget of $2,250,000 for CIP Projects. This target budget was intended as a guideline to use to distribute projects throughout the duration of the CIP. However, the CIP was developed primarily based on given factors (i.e. project requests, frequency, etc.) for the purposes of aligning with initial direction held by the District. The 2021 — 2030 Capital Improvement Project List is displayed in Table 15. Based on discussion with District Staff, system buildout projections are less than estimated in the 2012 Water System Master Plan. Projects included in the 2021 CIP will address maintenance and operational needs of existing District infrastructure. Projects to address maintenance and operations needs are expected to be rate funded. Calculated costs for all projects desired to be completed by the District in the 2021-2030 CIP greatly exceed the target budget. Average yearly cost of the 2021-2030 CIP is approximately $7,000,000 including all projects, assumptions, and inflation. The average yearly cost is an equivalent cost representing a distribution of project costs evenly during the 10-year CIP period. Upon review and consideration by the District, the CIP may be revised, reordered, and modified to better align with District financial needs. Actual yearly expenditures for CIP projects could vary greatly from year to year based on District preference. Farr West Engineering Truckee Donner Public Utility District FWE #1785 21 Water Infrastructure Capital Improvement Plan Development Appendix A Upcoming Regulations Potential Regulatory Impacts for TDPUD CIP Planning Regulatory Origin Nature of the Requirement Timing of Requirement Local Regulations Temporary discharge permit to flush water mains into the sewer from TSD and TTSA (chlorine residual in T-TSA/TSD excess of 100 mg/L prohibited - TTSA Ordinance 2- Ongoing 2015), neighborhoods with no sanitary sewer system will need to flush into water trucks for delivery to T- TSA Stormwater Stormwater protection under an NPDES permit may be Ongoing protection necessary to protect Truckee River State Regulations General Permit for Discharges from Permits discharge of drinking water for water system Ongoing Drinking Water operation, maintenance, and construction Systems Urban Water Management Plans (Water Code Section Water shortage contingency plan, water loss audits 1-Jul-2021 10610-10656 Making Conservation a CA Way of Life proposed reporting requirements: Residential -Gallons Proposed AB 1668/SB 606 Per Capita per Day (R-GPCPD) Making Conservation a CA Way of Life Urban Water Use Efficiency Standards 1-Jan-2021 AB 1668/SB 606 Making Conservation Annual Water use reporting including estimated indoor a CA Way of Life and outdoor residential use, irrigation and landscaping 1-Nov-2023 (AB 1668/SB 606) dedicated meter readings, and water losses Additional water use efficiency standards to be developed and implemented. Water loss control can be Making Conservation addressed through four foundational approaches: a CA Way of Life Detecting and locating leaks, efficient responses to 1-Jan-2027 (AB 1668/SB 606) reported leaks, reducing operational pressure and pressure variations, and prioritizing infrastructure replacement Require Urban Retail Water Suppliers (URWS) to implement feasible technologies on a system -wide Making Conservation scale to effectively detect and locate leaks, prioritize a CA Way of Life infrastructure replacement and repair or replace 2028 - 2035 (AB 1668/SB 606) infrastructure cost-effectively. For URWS s that opt for pressure management in part or whole of their system, large-scale implementation of pressure management will be expected in this phase. Farr West Engineering 1 Truckee -Donner PUD Potential Regulatory Impacts for TDPUD CIP Planning Regulatory Origin Nature of the Requirement Timing of Requirement Regular monitoring of the distribution system, prioritizing infrastructure replacement and continued Making Conservation repair (and replacement as suitable) for system a CA Way of Life components. From 2036 onwards, URWS's would be 2036 and beyond (AB 1668/SB 606) required to comply with their final allowable water loss volume on a three-year average basis with a maximum allowed deviation of 5% 2019 Legislative Proposals Adoption or amendment of primary drinking water AB 1204 standard equal to or more stringent than federal 2 Year Bill standards 2020 Legislative Proposals - Water Related SB 19 Stream Gages: DWR and SWRCB Unknown Water conservation/water losses. Would prohibit the board from issuing an information order, written notice, or conservation order to an urban retail water supplier that does not meet its urban water use objective if the board determines the URWS is not SB 134 meeting its urban water use objective solely because Unknown the volume of water loss exceeds the urban retail water supplier's standard for water loss and the board is taking enforcement action against the urban retail water supplier for not meeting the performance standards for the volume of water losses. Local agency utility services: extension of utility services. Would revise the definition of "fee" to mean a fee for the physical facilities necessary to make a water connection or sewer connection, and that the SB 646 estimated reasonable cost of labor and materials for Unknown installation of those facilities bears a fair or reasonable relationship to the payor's burdens on, or benefits received from, the water connection or sewer connection. Bill would authorize the SWRCB board, after a SB 779 hearing, to change any other provision or condition of a Unknown permit or licenses to appropriate water. SB 946 Local Flood Protection Plans requirement Unknown SB 996 SWRCB: Constituents of emerging concern- water Unknown quality standards AB 352 Wildfire Prevention, Safe Drinking Water, Drought Unknown Preparation, and Flood Protection Bond Act of 2020 Farr West Engineering 2 Truckee -Donner PUD Potential Regulatory Impacts for TDPUD CIP Planning Regulatory Origin Nature of the Requirement Timing of Requirement AB 756/AB 841 Public water systems: perfluoroalkyl substances and Unknown polyfluoroalkyl substances. Water, recycled water: backflow prevention SWRCB make regs AB 1180 requirements prior to l/l/2023: under Title 22 CCR Water loss audit reports would be AB 1414 Urban Retail Water Suppliers: reporting due on or before Oct 1, 2023 or January 1, 2024 Water Shortage Emergency: water supplier can declare AB 1432 a shortage in emergency conditions of wildfire w/out a Unknown hearing Drinking water and wastewater operator certification AB 1588 programs. Gives reciprocity/equivalence for military Unknown status in hiring Drinking water: pipes and fittings, lead content. Would define "lead free," for purposes of manufacturing, industrial processing, or conveying or dispensing water AB 2060 for human consumption, to mean not more than one Unknown microgram of lead under certain tests and meeting a specified certification when used with respect to end - use devices. Proposes to repeal current provisions requiring DWR AB 2324 to make recommendations to SWRCB for studies and Unknown investigations and report to legislature by 1/1/2020. 2020 Legislative Proposals - Electrical Related Assessment and recommendations be Energy: appliance standards and State Water Project provided to the SB 49 appropriate policy assessment committees of the Legislature before January 1, 2022. SB 70/SB 167 Electricity: undergrounding of electrical infrastructure, Unknown wildfire mitigation plan Farr West Engineering 3 Truckee -Donner PUD Potential Regulatory Impacts for TDPUD CIP Planning Regulatory Origin Nature of the Requirement Timing of Requirement Electricity: microgrids. Would require each electrical corporation to collaborate with the Office of SB 774 Emergency Services, and local governments and other Unknown interested parties in its service territory, to identify locations where sources of back-up electricity may provide increased electrical distribution grid resiliency Emergency back up generators: water and wastewater AB 2182 facilities exempt from regulation EXCEPT by the Unknown NFPA 110 standards Federal Changes US EPA Water quality standards changes including perchlorate Currently Ongoing levels US EPA Clean Water Act Changes to definition of "Waters of the United States" Currently Ongoing Farr West Engineering 4 Truckee -Donner PUD Appendix B Modified System HGL Exhibit Appendix C System Storage Assessment MAX DAY DEMAND AND STORAGE ANALYSIS * TANKS AT FULL CAPACITY * HALF CAPACITY Tank Zone Total Storage Capacity (MG) MDD (MGD) Total MDD (MGD) MDD Days Additional MDD Volume (MG) MDD Days Additional MDD Volume (MG) 6170, Sierra Meadows 6170/Sierra Meadows 2 1.328 1.700 1.03 10.15 0.51 11.03 6040/01ympic Heights 0.205 Riverview 0.166 Gateway/Chez Hydro 0.001 Northside Town 0.40 0.189 0.189 2.12 0.92 1.06 1.12 Gateway, Donner Trails Gateway 0.75 0.700 0.700 1.07 4.15 0.54 4.53 Armstrong Armstrong 0.10 0.064 0.064 1.56 0.35 0.78 0.40 DL-6323 Donner Lake-6323 0.30 0.108 0.198 1.52 1.09 0.76 1.24 Donner Lake -NE 0.066 Coldstream 6080 0.024 Wolf Estates Donner Lake-6124 0.23 0.260 0.275 0.84 1.70 0.42 1.81 Red Mountain Hydro 0.004 Wolfe Hydro 0.011 Sitzmark, Falcon Point, Innsbruck Innsbruck 0.60 0.388 0.442 1.36 2.49 0.68 2.79 Sitzmark Hydro 0.018 Bennett Flat 0.036 Roundhill, Herringbone, Stockholm Stockholm 0.92 0.615 0.731 1.26 4.20 0.63 4.66 Trout Creek 6550 0.003 Alder Creek 0.012 Hillside 0.100 Roundhill Hydro 0.001 Pinnacle Pinnacle 0.18 0.080 0.116 1.55 0.63 0.78 0.72 Pinnacle Hydro 0.036 Donner View, Ski Lodge Donner View 0.70 0.414 0.465 1.51 2.56 0.75 2.91 Heidi Way 0.038 Donner View Hydro 0.013 Prosser Lakeview Lower Lakeview 0.25 0.217 0.217 1.15 1.27 0.58 1.39 Ponderosa Palisades Ponderosa Palisades 0.40 0.412 0.512 0.78 3.18 0.39 3.384 West Palisades Hydro 0.005 Palisades Hydro 0.032 Martiswoods 0.063 Glenshire Lower Glenshire 2 0.74 1.218 1.312 0.56 8.45 0.28 8.82 Waterloo 0.052 Icknield 0.042 Soma Sierra Some Sierra 0.20 0.013 0.028 7.14 -0.004 3.57 0.096 Donner Trails 0.015 Ski Run Upper Ski Run 0.10 0.000 0.013 7.69 -0.009 3.85 0.041 Lower Ski Run 0.013 Glacier Glacier 0.15 0.029 0.061 2.46 0.28 1.23 0.35 Upper Skislope 0.015 Middle Skislope 0.009 Lower Skislope 0.008 Prosser Annex, Prosser Heights Prosser Heights/Upper Lakeview 0.43 0.201 0.22 1.97 1.10 0.99 1.31 Heights Hydro 0.017 Glenshire Upper Glenshire 1 0.49 0.283 0.28 1.74 1.49 0.87 1.74 Hirschdale Hirschdale 0.10 0.013 0.01 7.63 -0.0083 3.82 0.042 System MDD Additional Production (MGD/day) 6.28 6.91 WINTER DAY DEMAND AND STORAGE ANALYSIS * TANKS AT FULL CAPACITY Tank Zone Total Storage Capacity (MG) WDD (MGD) Total WDD (MGD) WDD Days Additional WDD Volume (MG) 6170, Sierra Meadows 6170/Sierra Meadows 2 0.464 0.570 3.07 2.24 6040/01ympic Heights 0.042 Riverview 0.063 Gateway/Chez Hydro 0.001 Northside Town 0.40 0.121 0.121 3.31 0.45 Gateway, Donner Trails Gateway 0.75 0.289 0.289 2.60 1.27 Armstrong Armstrong 0.10 0.041 0.041 2.44 0.19 DL-6323 Donner Lake-6323 0.30 0.029 0.121 2.48 0.55 Donner Lake -NE 0.037 Coldstream 6080 0.055 Wolf Estates Donner Lake-6124 0.23 0.081 0.085 2.71 0.37 Red Mountain Hydro 0.002 Wolfe Hydro 0.002 Sitzmark, Falcon Point, Innsbruck Innsbruck 0.60 0.172 0.192 3.13 0.74 Sitzmark Hydro 0.003 Bennett Flat 0.017 Roundhill, Herringbone, Stockholm Stockholm 0.92 0.257 0.295 3.12 1.15 Trout Creek 6550 0.001 Alder Creek 0.002 Hillside 0.034 Roundhill Hydro 0.001 Pinnacle Pinnacle 0.18 0.025 0.040 4.50 0.10 Pinnacle Hydro 0.015 Donner View, Ski Lodge Donner View 0.70 0.135 0.162 4.32 0.43 Heidi Way 0.020 Donner View Hydro 0.007 Prosser Lakeview Lower Lakeview 0.25 0.070 0.070 3.57 0.24 Ponderosa Palisades Ponderosa Palisades 0.40 0.064 0.078 5.13 0.15 West Palisades Hydro 0.001 Palisades Hydro 0.007 Martiswoods 0.006 Glenshire Lower Glenshire 2 0.74 0.220 0.235 3.14 0.91 Waterloo 0.009 Icknield 0.006 Soma Sierra Some Sierra 0.20 0.007 0.010 20.00 -0.13 Donner Trails 0.003 Ski Run Upper Ski Run 0.10 0.000 0.002 50.00 -0.086 Lower Ski Run 0.002 Glacier Glacier 0.15 0.009 0.020 7.50 -0.01 Upper Skislope 0.006 Middle Skislope 0.002 Lower Skislope 0.003 Prosser Annex, Prosser Heights Prosser Heights/Upper Lakeview 0.43 0.049 0.055 7.82 -0.045 Heights Hydro 0.006 Glenshire Upper Glenshire 1 0.49 0.070 0.070 7.03 -0.002 Hirschdale Hirschdale 0.10 0.006 0.006 16.67 -0.058 System WDD Additional Production (MGD/day) 1.25 STAGE 3 WATER CONSERVATION DEMAND AND STORAGE ANALYSIS * TANKS AT FULL CAPACITY STAGE 3 CONSERVATION * HALF CAPACITY Tank Zone Total Storage Capacity (MG) S3C (MGD) Total S3C (MGD) S3C Days Additional SK Volume (MG) S3C Days Additional S3C Volume (MG) 6170, Sierra Meadows 6170/Sierra Meadows 2 1.328 1.19 1.47 6.58 0.74 7.46 6040/01ympic Heights 0.205 Riverview 0.166 Gateway/Chez Hydro 0.001 Northside Town 0.40 0.189 0.13 3.02 0.53 1.51 0.73 Gateway, Donner Trails Gateway 0.75 0.700 0.49 1.53 2.68 0.77 3.06 Armstrong Armstrong 0.10 0.064 0.04 2.23 0.21 1.12 0.26 DL-6323 Donner Lake-6323 0.30 0.108 0.14 2.16 0.67 1.08 0.82 Donner Lake -NE 0.066 Coldstream 6080 0.024 Wolf Estates Donner Lake-6124 0.23 0.260 0.19 1.19 1.12 0.60 1.23 Red Mountain Hydro 0.004 Wolfe Hydro 0.011 Sitzmark, Falcon Point, Innsbruck Innsbruck 0.60 0.388 0.31 1.94 1.57 0.97 1.87 Sitzmark Hydro 0.018 Bennett Flat 0.036 Roundhill, Herringbone, Stockholm Stockholm 0.92 0.615 0.512 1.80 2.66 0.90 3.12 Trout Creek 6550 0.003 Alder Creek 0.012 Hillside 0.100 Roundhill Hydro 0.001 Pinnacle Pinnacle 0.18 0.080 0.08 2.22 0.39 1.11 0.48 Pinnacle Hydro 0.036 Donner View, Ski Lodge Donner View 0.70 0.414 0.33 2.15 1.58 1.08 1.93 Heidi Way 0.038 Donner View Hydro 0.013 Prosser Lakeview Lower Lakeview 0.25 0.217 0.15 1.65 0.81 0.82 0.94 Ponderosa Palisades Ponderosa Palisades 0.40 0.412 0.36 1.12 2.11 0.56 2.3088 West Palisades Hydro 0.005 Palisades Hydro 0.032 Martiswoods 0.063 Glenshire Lower Glenshire 2 0.74 1.218 0.92 0.80 5.69 0.40 6.06 Waterloo 0.052 Icknield 0.042 Soma Sierra Some Sierra 0.20 0.013 0.02 10.20 -0.0628 5.10 0.0372 Donner Trails 0.015 Ski Run Upper Ski Run 0.10 0.000 0.01 10.99 -0.0363 5.49 0.0137 Lower Ski Run 0.013 Glacier Glacier 0.15 0.029 0.04 3.51 0.15 1.76 0.22 Upper Skislope 0.015 Middle Skislope 0.009 Lower Skislope 0.008 Prosser Annex, Prosser Heights Prosser Heights/Upper Lakeview 0.43 0.201 0.15 2.82 0.64 1.41 0.85 Heights Hydro 0.017 Glenshire Upper Glenshire 1 0.49 0.283 0.20 2.48 0.89 1.24 1.14 Hirschdale Hirschdale 0.10 0.013 0.01 10.91 -0.03581 5.45 0.014 System MDD Additional Storage (MGD) 4.04 4.65 Appendix D Planning Level Cost Estimates Martiswoods Pump Station Replacement/Remove Tower Item Quantity Unit Description Unit Price Total Price 1 1 LS Mob/Demob 5% $ 23,750.00 2 1 LS Demo Exist Tower $ 50,000.00 $ 50,000.00 3 1 LS Sitework $ 40,000.00 $ 40,000.00 4 1 1 LS Hydropneumatic Pump Stataion $ 180,000.00 $ 180,000.00 5 240 SF jPump Station Building $ 500.00 $ 120,000.00 6 1 LS Emergency Generator $ 35,000.00 $ 35,000.00 7 1 LS Electrical $ 50,000.00 $ 50,000.00 8 $ - 9 $ - 10 $ - 11 $ - 12 $ - 13 $ - 14 $ - Total Construction Estimate Contingency (10%) Engineering/Planning (10%) Engineering Inspection (20%) Land Acquisition Legal (5%) Permitting (5%) TOTAL $ 498,750.00 $ 49,875.00 $ 49,875.00 $ 119,700.00 $ - $ 24,937.50 $ 24,937.50 $ 768,075.00 * Note - Estimate is based on 2020/2021 Labor/Equipment/Material costs. No escalation is included here. Escalation, if needed, will be added on the CIP Summary Page Install Standby Generator at Martis Valley Well Item Quantity Unit Description Unit Price Total Price 1 1 LS Mob/Demob 5% $ 13,250.00 2 1 LS Sitework $ 15,000.00 $ 15,000.00 3 1 LS 350 kW Generator $ 220,000.00 $ 220,000.00 4 1 1 LS Electrical $ 30,000.00 $ 30,000.00 5 $ - 6 $ - 7 $ - 8 $ - 9 $ - 10 $ - 11 $ - 12 $ - 13 $ - 14 $ - Total Construction Estimate Contingency (10%) Engineering/Planning (10%) Engineering Inspection (20%) Land Acquisition Legal (5%) Permitting (5%) TOTAL $ 278,250.00 $ 27,825.00 $ 27,825.00 $ 66,780.00 $ - $ 13,912.50 $ 13,912.50 $ 428,505.00 * Note - Estimate is based on 2020/2021 Labor/Equipment/Material costs. No escalation is included here. Escalation, if needed, will be added on the CIP Summary Page Install Standby Generator at Donner Trails and Soma Sierra Item Quantity Unit Description Unit Price Total Price 1 1 LS Mob/Demob 5% $ 42,000.00 2 1 LS Sitework - Donner $ 50,000.00 $ 50,000.00 3 1 LS Sitework - Soma Sierra $ 50,000.00 $ 50,000.00 4 1 1 LS 1550 kW Emergency Generator - Donner $ 300,000.00 $ 300,000.00 5 1 LS 1550 kW Emergency Generator - Soma Sierra $ 300,000.00 $ 300,000.00 6 1 LS Electrical - Donner $ 70,000.00 $ 70,000.00 7 1 LS Electrical - Soma Sierra $ 70,000.00 $ 70,000.00 8 $ - 9 $ - 10 1 $ - 11 $ - 12 $ - 13 $ - 14 $ - 15 $ - Total Construction Estimate Contingency (10%) Engineering/Planning (10%) Engineering Inspection (20%) Land Acquisition Legal (5%) Permitting (5%) TOTAL $ 882,000.00 $ 88,200.00 $ 88,200.00 $ 211,680.00 $ - $ 44,100.00 $ 44,100.00 $ 1,358,280.00 * Note - Estimate is based on 2020/2021 Labor/Equipment/Material costs. No escalation is included here. Escalation, if needed, will be added on the CIP Summary Page West Palisades Hydropnuematic Pump Station Upgrade Item Quantity Unit Description Unit Price Total Price 1 1 LS Mob/Demob 5% $ 14,500.00 2 1 LS Demolition $ 30,000.00 $ 30,000.00 3 1 LS Sitework $ 30,000.00 $ 30,000.00 4 1 1 LS New Pump Station in Vault $ 165,000.00 $ 165,000.00 5 1 LS Emergency Generator $ 25,000.00 $ 25,000.00 6 1 LS Electrical $ 40,000.00 $ 40,000.00 7 $ - 8 $ - 9 $ - 10 $ - 11 $ - 12 $ - 13 $ - 14 $ - Total Construction Estimate Contingency (10%) Engineering/Planning (10%) Engineering Inspection (20%) Land Acquisition Legal (5%) Permitting (5%) TOTAL $ 304,500.00 $ 30,450.00 $ 30,450.00 $ 73,080.00 $ - $ 15,225.00 $ 15,225.00 $ 468,930.00 * Note - Estimate is based on 2020/2021 Labor/Equipment/Material costs. No escalation is included here. Escalation, if needed, will be added on the CIP Summary Page Install Standby Generator at Gateway Hydro PS Item Quantity Unit Description Unit Price Total Price 1 1 LS Mob/Demob 5% $ 4,750.00 2 1 LS Sitework $ 10,000.00 $ 10,000.00 3 1 LS 80 kW Generator $ 65,000.00 $ 65,000.00 4 1 LS Electrical $ 20,000.00 $ 20,000.00 5 $ - 6 $ - 7 $ - 8 $ - 9 $ - 10 $ - 11 $ - 12 $ 13 $ - 14 $ - Total Construction Estimate Contingency (10%) Engineering/Planning (10%) Engineering Inspection (20%) Land Acquisition Legal (5%) Permitting (5%)l TOTAL $ 99,750.00 $ 9,975.00 $ 9,975.00 $ 23,940.00 $ - $ 4,987.50 $ 4,987.50 $ 153,615.00 * Note - Estimate is based on 2020/2021 Labor/Equipment/Material costs. No escalation is included here. Escalation, if needed, will be added on the CIP Summary Page Hirschdale Connection Pipeline Item Quantity Unit Description Unit Price Total Price 1 1 LS Mob/Demob 5% $ 12,480.72 2 2003 LF 4" Water Main $ 76.00 $ 152,228.00 3 2 EA Connection to Existing Pipe $ 6,500.00 $ 13,000.00 4 1 40 HRS Rock Excavation $ 1,500.00 $ 60,000.00 5 500 SF AC Pavement and Base (Small Patching) $ 25.00 $ 12,500.00 6 1 LS All Other Work Required by the Contract Documents $ 11,886.40 $ 11,886.40 7 $ - 8 $ - 9 $ - 10 $ - 11 $ - Total Construction Estimate Contingency (10%) Engineering/Planning (10%) Engineering Inspection (20%) Land Acquisition Legal (5%) Permitting (5%) TOTAL $ 262,095.12 $ 26,209.51 $ 26,209.51 $ 62,902.83 $ - $ 13,104.76 $ 13,104.76 $ 403,626.48 * Note - Estimate is based on 2020/2021 Labor/Equipment/Material costs. No escalation is included here. Escalation, if needed, will be added on the CIP Summary Page Hirschdale PRV Item Quantity Unit Description Unit Price Total Price 1 1 LS Mob/Demob 5% $ 1,883.75 2 1 LS 4" PRV $ 27,000.00 $ 27,000.00 3 4 HRS Rock Excavation $ 1,500.00 $ 6,000.00 4 1 50 SF AC Pavement and Base (Small Patching) $ 25.00 $ 1,250.00 5 1 LS All Other Work Required by the Contract Documents $ 3,425.00 $ 3,425.00 6 $ - 8 $ - 9 $ - 10 $ - 11 $ - 12 $ - 13 $ - 14 $ - 15 $ - Total Construction Estimate Contingency (10%) Engineering/Planning (10%) Engineering Inspection (20%) Land Acquisition Legal (5%) Permitting (5%) TOTALI $ 39,558.75 $ 3,955.88 $ 3,955.88 $ 9,494.10 $ - $ 1,977.94 $ 1,977.94 $ 60,920.48 * Note - Estimate is based on 2020/2021 Labor/Equipment/Material costs. No escalation is included here. Escalation, if needed, will be added on the CIP Summary Page 8" Pipeline from across Donner Pass Rd to South of Fire Station 92 Item Quantity Unit Description Unit Price Total Price 1 1 LS Mob/Demob 5% $ 9,143.75 2 550 LF 8" Water Main $ 170.00 $ 93,500.00 3 2 EA Connection to Existing Pipe $ 6,500.00 $ 11,916.67 4 1 28 HRS Rock Excavation $ 1,500.00 $ 41,250.00 5 2750 SF AC Pavement and Base (Trench Restoration) $ 10.00 $ 27,500.00 6 1 LS All Other Work Required by the Contract Documents $ 8,708.33 $ 8,708.33 7 $ - 8 $ - 9 $ - 10 $ - 11 $ - Total Construction Estimate Contingency (10%) Engineering/Planning (10%) Engineering Inspection (20%) Land Acquisition Legal (5%) Permitting (5%) TOTAL $ 192,018.75 $ 19,201.88 $ 19,201.88 $ 46,084.50 $ - $ 9,600.94 $ 9,600.94 $ 295,708.88 * Note - Estimate is based on 2020/2021 Labor/Equipment/Material costs. No escalation is included here. Escalation, if needed, will be added on the CIP Summary Page 8" Pipeline from Royal Way to Royal Crest Extension Item Quantity Unit Description Unit Price Total Price 1 1 LS Mob/Demob 5% $ 20,107.50 2 1500 LF 8" Water Main $ 170.00 $ 255,000.00 3 2 EA Connection to Existing Pipe $ 6,500.00 $ 13,000.00 4 1 75 HRS Rock Excavation $ 1,500.00 $ 112,500.00 5 100 SF AC Pavement and Base (Small Patching) $ 25.00 $ 2,500.00 6 1 LS All Other Work Required by the Contract Documents $ 19,150.00 $ 19,150.00 7 $ - 8 $ - 9 $ - 10 $ - 11 $ - Total Construction Estimate Contingency (10%) Engineering/Planning (10%) Engineering Inspection (20%) Land Acquisition Legal (5%) Permitting (5%) TOTAL $ 422,257.50 $ 42,225.75 $ 42,225.75 $ 101,341.80 $ - $ 21,112.88 $ 21,112.88 $ 650,276.55 * Note - Estimate is based on 2020/2021 Labor/Equipment/Material costs. No escalation is included here. Escalation, if needed, will be added on the CIP Summary Page 8" Pipeline from Sitzmark to Mougle Lane to extend Sitzmark Hydro Zone Item Quantity Unit Description Unit Price Total Price 1 1 LS Mob/Demob 5% $ 6,107.50 2 425 LF 8" Water Main $ 170.00 $ 72,250.00 3 1 EA Connection to Existing Pipe $ 6,500.00 $ 9,208.33 4 1 21 HRS Rock Excavation $ 1,500.00 $ 31,875.00 5 120 SF AC Pavement and Base (Small Patching) $ 25.00 $ 3,000.00 6 1 LS All Other Work Required by the Contract Documents $ 5,816.67 $ 5,816.67 7 $ - 8 $ - 9 $ - 10 $ - 11 $ - Total Construction Estimate Contingency (10%) Engineering/Planning (10%) Engineering Inspection (20%) Land Acquisition Legal (5%) Permitting (5%) TOTAL $ 128,257.50 $ 12,825.75 $ 12,825.75 $ 30,781.80 $ - $ 6,412.88 $ 6,412.88 $ 197,516.55 * Note - Estimate is based on 2020/2021 Labor/Equipment/Material costs. No escalation is included here. Escalation, if needed, will be added on the CIP Summary Page Replace Cross Country Pipeline Between Schussing Way & St Bernard Drive Item Quantity Unit Description Unit Price Total Price 1 1 LS Mob/Demob 5% $ 8,203.13 2 475 LF 8" Water Main $ 170.00 $ 80,750.00 3 2 EA Connection to Existing Pipe $ 6,500.00 $ 13,000.00 4 1 40 HRS Rock Excavation $ 1,500.00 $ 60,000.00 5 100 SF AC Pavement and Base (Small Patching) $ 25.00 $ 2,500.00 6 1 LS All Other Work Required by the Contract Documents $ 7,812.50 $ 7,812.50 7 $ - 8 $ - 9 $ - 10 $ - 11 $ - Total Construction Estimate Contingency (10%) Engineering/Planning (10%) Engineering Inspection (20%) Land Acquisition Legal (5%) Permitting (5%) TOTAL $ 172,265.63 $ 17,226.56 $ 17,226.56 $ 41,343.75 $ - $ 8,613.28 $ 8,613.28 $ 265,289.06 * Note - Estimate is based on 2020/2021 Labor/Equipment/Material costs. No escalation is included here. Escalation, if needed, will be added on the CIP Summary Page Airport Well Pump & Motor Replacement Item Quantity Unit Description Unit Price Total Price 1 1 LS Mob/Demob 5% $ 4,700.00 2 4 EA Remove Existing Pumps $ 5,000.00 $ 20,000.00 3 4 EA Install New Pump/Motors $ 16,000.00 $ 64,000.00 4 1 LS Electrical $ 10,000.00 $ 10,000.00 5 $ - 6 $ - 7 $ - 8 $ - 9 $ - 10 $ - 11 $ - 12 $ - Total Construction Estimate Contingency (10%) Engineering/Planning (10%) Engineering Inspection (20%) Land Acquisition Legal (5%) Permitting (5%) TOTAL $ 98,700.00 $ 9,870.00 $ 9,870.00 $ 23,688.00 $ - $ 4,935.00 $ 4,935.00 $ 151,998.00 * Note - Estimate is based on 2020/2021 Labor/Equipment/Material costs. No escalation is included here. Escalation, if needed, will be added on the CIP Summary Page Oberwald PRV Site Piping Item Quantity Unit Description Unit Price Total Price 1 1 LS Mob/Demob 5% $ 1,666.50 2 100 LF 8" Site Piping $ 150.00 $ 15,000.00 3 1 EA Tie in to Existing Piping $ 6,300.00 $ 6,300.00 4 1 2 HRS Rock Excavation $ 1,500.00 $ 3,000.00 5 600 SF AC Pavement and Base (Trench Restoration) $ 10.00 $ 6,000.00 6 1 LS All Other Work Required by the Contract Documents $ 3,030.00 $ 3,030.00 7 $ - 8 $ - 9 $ - 10 $ - 11 $ - 12 $ - 13 $ - 14 $ - Total Construction Estimate Contingency (10%) Engineering/Planning (10%) Engineering Inspection (20%) Land Acquisition Legal (5%) Permitting (5%) TOTALI $ 34,996.50 $ 3,499.65 $ 3,499.65 $ 8,399.16 $ - $ 1,749.83 $ 1,749.83 $ 53,894.61 * Note - Estimate is based on 2020/2021 Labor/Equipment/Material costs. No escalation is included here. Escalation, if needed, will be added on the CIP Summary Page Oberwald PRV Item Quantity Unit Description Unit Price Total Price 1 1 LS Mob/Demob 5% $ 2,598.75 2 1 LS 6" PRV (No 2" Bypass) $ 40,000.00 $ 40,000.00 3 4 HRS Rock Excavation $ 1,500.00 $ 6,000.00 4 1 50 SF AC Pavement and Base (Small Patching) $ 25.00 $ 1,250.00 5 1 LS All Other Work Required by the Contract Documents $ 4,725.00 $ 4,725.00 6 $ - 8 $ - 9 $ - 10 $ - 11 $ - 12 $ - 13 $ - 14 $ - 15 $ - Total Construction Estimate Contingency (10%) Engineering/Planning (10%) Engineering Inspection (20%) Land Acquisition Legal (5%) Permitting (5%) TOTALI $ 54,573.75 $ 5,457.38 $ 5,457.38 $ 13,097.70 $ - $ 2,728.69 $ 2,728.69 $ 84,043.58 * Note - Estimate is based on 2020/2021 Labor/Equipment/Material costs. No escalation is included here. Escalation, if needed, will be added on the CIP Summary Page Pathway PRV Site Piping Item Quantity Unit Description Unit Price Total Price 1 1 LS Mob/Demob 5% $ 1,666.50 2 100 LF 8" Site Piping $ 150.00 $ 15,000.00 3 1 EA Tie-in to Existing Piping $ 6,300.00 $ 6,300.00 4 1 2 HRS Rock Excavation $ 1,500.00 $ 3,000.00 5 600 SF AC Pavement and Base (Trench Restoration) $ 10.00 $ 6,000.00 6 1 LS All Other Work Required by the Contract Documents $ 3,030.00 $ 3,030.00 7 $ - 8 $ - 9 $ - 10 $ - 11 $ - 12 $ - 13 $ - 14 $ - Total Construction Estimate Contingency (10%) Engineering/Planning (10%) Engineering Inspection (20%) Land Acquisition Legal (5%) Permitting (5%) TOTALI $ 34,996.50 $ 3,499.65 $ 3,499.65 $ 8,399.16 $ - $ 1,749.83 $ 1,749.83 $ 53,894.61 * Note - Estimate is based on 2020/2021 Labor/Equipment/Material costs. No escalation is included here. Escalation, if needed, will be added on the CIP Summary Page Pathway PRV Item Quantity Unit Description Unit Price Total Price 1 1 LS Mob/Demob 5% $ 2,598.75 2 1 LS 6" PRV (No 2" Bypass) $ 40,000.00 $ 40,000.00 3 4 HRS Rock Excavation $ 1,500.00 $ 6,000.00 4 1 50 SF AC Pavement and Base (Small Patching) $ 25.00 $ 1,250.00 5 1 LS All Other Work Required by the Contract Documents $ 4,725.00 $ 4,725.00 6 $ - 8 $ - 9 $ - 10 $ - 11 $ - 12 $ - 13 $ - 14 $ - 15 $ - Total Construction Estimate Contingency (10%) Engineering/Planning (10%) Engineering Inspection (20%) Land Acquisition Legal (5%) Permitting (5%) TOTALI $ 54,573.75 $ 5,457.38 $ 5,457.38 $ 13,097.70 $ - $ 2,728.69 $ 2,728.69 $ 84,043.58 * Note - Estimate is based on 2020/2021 Labor/Equipment/Material costs. No escalation is included here. Escalation, if needed, will be added on the CIP Summary Page 8" Pipeline in Sitzmark Way to extend Sitzmark Zone Item Quantity Unit Description Unit Price Total Price 1 1 LS Mob/Demob 5% $ 6,339.38 2 300 LF 8" Water Main $ 170.00 $ 51,000.00 3 150 LF 2" PE Water Service Lateral $ 85.00 $ 12,750.00 4 1 4 EA Water Service $ 3,250.00 $ 13,000.00 5 1 EA Connection to Existing Pipe $ 6,500.00 $ 6,500.00 6 15 HRS Rock Excavation $ 1,500.00 $ 22,500.00 7 1500 SF AC Pavement and Base (Trench Restoration) $ 10.00 $ 15,000.00 8 1 LS All Other Work Required by the Contract Documents $ 6,037.50 $ 6,037.50 9 $ - 10 $ - 11 $ - 12 $ - 13 t $ - Total Construction Estimate Contingency (10%) Engineering/Planning (10%) Engineering Inspection (20%) Land Acquisition Legal (5%) Permitting (5%) TOTAL $ 133,126.88 $ 13,312.69 $ 13,312.69 $ 31,950.45 $ - $ 6,656.34 $ 6,656.34 $ 205,015.39 * Note - Estimate is based on 2020/2021 Labor/Equipment/Material costs. No escalation is included here. Escalation, if needed, will be added on the CIP Summary Page 8" Pipeline in Davos Drive to extend Stockholm Zone Item Quantity Unit Description Unit Price Total Price 1 1 LS Mob/Demob 5% $ 23,765.88 2 1100 LF 8" Water Main $ 170.00 $ 187,000.00 3 550 LF 2" PE Water Service Lateral $ 85.00 $ 46,750.00 4 1 12 EA Water Service $ 3,250.00 $ 39,000.00 5 2 EA Fire Hydrant $ 9,300.00 $ 18,600.00 6 4 EA Connection to Existing Pipe $ 6,500.00 $ 23,833.33 8 55 HRS Rock Excavation $ 1,500.00 $ 82,500.00 9 5500 SF AC Pavement and Base (Trench Restoration) $ 10.00 $ 55,000.00 10 1 LS All Other Work Required by the Contract Documents $ 22,634.17 $ 22,634.17 11 $ - 12 $ - 13 $ - 14 $ - 15 $ - Total Construction Estimate Contingency (10%) Engineering/Planning (10%) Engineering Inspection (20%) Land Acquisition Legal (5%) Permitting (5%) TOTAL $ 499,083.38 $ 49,908.34 $ 49,908.34 $ 119,780.01 $ - $ 24,954.17 $ 24,954.17 $ 768,588.40 * Note - Estimate is based on 2020/2021 Labor/Equipment/Material costs. No escalation is included here. Escalation, if needed, will be added on the CIP Summary Page Replace Cross Country Pipeline between Alder Creed Rd & Wolfgang Rd Item Quantity Unit Description Unit Price Total Price 1 1 LS Mob/Demob 5% $ 8,459.06 2 500 LF 8" Water Main $ 170.00 $ 85,000.00 3 2 EA Connection to Existing Pipe $ 6,500.00 $ 13,000.00 4 1 40 HRS Rock Excavation $ 1,500.00 $ 60,000.00 5 125 SF AC Pavement and Base (Small Patching) $ 25.00 $ 3,125.00 6 1 LS All Other Work Required by the Contract Documents $ 8,056.25 $ 8,056.25 7 $ - 8 $ - 9 $ - 10 $ - 11 $ - Total Construction Estimate Contingency (10%) Engineering/Planning (10%) Engineering Inspection (20%) Land Acquisition Legal (5%) Permitting (5%) TOTAL $ 177,640.31 $ 17,764.03 $ 17,764.03 $ 42,633.68 $ - $ 8,882.02 $ 8,882.02 $ 273,566.08 * Note - Estimate is based on 2020/2021 Labor/Equipment/Material costs. No escalation is included here. Escalation, if needed, will be added on the CIP Summary Page Northside Well Facility Replacement Item Quantity Unit Description Unit Price Total Price 1 1 LS Mob/Demob 5% $ 10,625.00 2 1 LS New Well & Pump (575 GPM) (No Well Rehab) $ 25,000.00 $ 25,000.00 3 1 LS Sitework $ 15,000.00 $ 15,000.00 4 1 225 SF New Well House $ 500.00 $ 112,500.00 5 1 LS Chemical Dosing System $ 25,000.00 $ 25,000.00 6 1 LS Electrical $ 35,000.00 $ 35,000.00 7 $ 8 $ 9 $ - 10 $ - 11 $ - 12 $ - Total Construction Estimate Contingency (20%) Engineering/Planning (10%) Engineering Inspection (20%) Land Acquisition Legal (5%) Permitting (5%) TOTAL $ 223,125.00 $ 44,625.00 $ 22,312.50 $ 58,012.50 $ - $ 11,156.25 $ 11,156.25 $ 370,387.50 * Note - Estimate is based on 2020/2021 Labor/Equipment/Material costs. No escalation is included here. Escalation, if needed, will be added on the CIP Summary Page 12" Pipeline in Glacier Way & Skislope Way Item Quantity Unit Description Unit Price Total Price 1 1 LS Mob/Demob 5% $ 40,660.81 2 1750 LF 12" Water Main $ 208.00 $ 364,000.00 3 875 LF 2" PE Water Service Lateral $ 85.00 $ 74,375.00 4 13 EA Water Service $ 3,250.00 $ 42,250.00 5 4 EA Fire Hydrant $ 9,300.00 $ 37,200.00 6 6 EA Connection to Existing Pipe $ 6,500.00 $ 37,916.67 8 88 HRS Rock Excavation $ 1,500.00 $ 131,250.00 9 8750 SF AC Pavement and Base (Trench Restoration) $ 10.00 $ 87,500.00 10 1 LS All Other Work Required by the Contract Documents $ 38,724.58 $ 38,724.58 11 $ - 12 $ - 13 $ - 14 $ - 15 $ - Total Construction Estimate Contingency (10%) Engineering/Planning (10%) Engineering Inspection (20%) Land Acquisition Legal (5%) Permitting (5%) TOTALI $ 853,877.06 $ 85,387.71 $ 85,387.71 $ 204,930.50 $ - $ 42,693.85 $ 42,693.85 $ 1,314,970.68 * Note - Estimate is based on 2020/2021 Labor/Equipment/Material costs. No escalation is included here. Escalation, if needed, will be added on the CIP Summary Page Hansel Avenue Fire Hydrant Relocate Item Quantity Unit Description Unit Price Total Price 1 1 LS Mob/Demob 5% $ 880.00 2 2 EA Relocate Fire Hydrants $ 6,000.00 $ 12,000.00 3 2 HRS Rock Excavation $ 1,500.00 $ 3,000.00 4 1 40 SF AC Pavement and Base (Small Patching) $ 25.00 $ 1,000.00 5 1 LS All Other Work Required by the Contract Documents $ 1,600.00 $ 1,600.00 6 $ - 8 $ - 9 $ - 10 $ - 11 $ - 12 $ - 13 $ - 14 $ - 15 $ - Total Construction Estimate Contingency (10%) Engineering/Planning (10%) Engineering Inspection (20%) Land Acquisition Legal (5%) Permitting (5%) TOTALI $ 18,480.00 $ 1,848.00 $ 1,848.00 $ 4,435.20 $ - $ 924.00 $ 924.00 $ 28,459.20 * Note - Estimate is based on 2020/2021 Labor/Equipment/Material costs. No escalation is included here. Escalation, if needed, will be added on the CIP Summary Page 8" Pipeline from Martiswoods Tower to Kleckner Court Item Quantity Unit Description Unit Price Total Price 1 1 LS Mob/Demob 5% $ 9,287.50 2 650 LF 8" Water Main $ 170.00 $ 110,500.00 3 2 EA Connection to Existing Pipe $ 6,500.00 $ 14,083.33 4 1 33 HRS Rock Excavation $ 1,500.00 $ 48,750.00 5 150 SF AC Pavement and Base (Small Patching) $ 25.00 $ 3,750.00 6 1 LS All Other Work Required by the Contract Documents $ 8,666.67 $ 8,666.67 7 $ - 8 $ - 9 $ - 10 $ - 11 $ - Total Construction Estimate Contingency (10%) Engineering/Planning (10%) Engineering Inspection (20%) Land Acquisition Legal (5%) Permitting (5%) TOTAL $ 195,037.50 $ 19,503.75 $ 19,503.75 $ 46,809.00 $ - $ 9,751.88 $ 9,751.88 $ 300,357.75 * Note - Estimate is based on 2020/2021 Labor/Equipment/Material costs. No escalation is included here. Escalation, if needed, will be added on the CIP Summary Page Change Pressure Zone of Services on Hansel Avenue Item Quantity Unit Description Unit Price Total Price 1 1 LS Mob/Demob 5% $ 2,549.25 2 6 EA Water Service $ 3,250.00 $ 19,500.00 3 6 EA 3/4" PRV (Per Service) $ 225.00 $ 1,350.00 4 1 12 HRS Rock Excavation $ 1,500.00 $ 18,000.00 5 300 SF AC Pavement and Base (Small Patching) $ 25.00 $ 7,500.00 6 1 LS All Other Work Required by the Contract Documents $ 4,635.00 $ 4,635.00 7 $ - 8 $ - 9 $ - Total Construction Estimate Contingency (10%) Engineering/Planning (10%) Engineering Inspection (20%) Land Acquisition Legal (5%) Permitting (5%) TOTALI $ 53,534.25 $ 5,353.43 $ 5,353.43 $ 12,848.22 $ - $ 2,676.71 $ 2,676.71 $ 82,442.75 * Note - Estimate is based on 2020/2021 Labor/Equipment/Material costs. No escalation is included here. Escalation, if needed, will be added on the CIP Summary Page 12" Pipeline in Skislope Way below Ski Lodge Tank Site Item Quantity Unit Description Unit Price Total Price 1 1 LS Mob/Demob 5% $ 33,277.13 2 1500 LF 12" Water Main $ 208.00 $ 312,000.00 3 750 LF 2" PE Water Service Lateral $ 85.00 $ 63,750.00 4 1 6 EA Water Service $ 3,250.00 $ 19,500.00 5 2 EA Fire Hydrant $ 9,300.00 $ 18,600.00 6 5 EA Connection to Existing Pipe $ 6,500.00 $ 32,500.00 8 75 HRS Rock Excavation $ 1,500.00 $ 112,500.00 9 7500 SF AC Pavement and Base (Trench Restoration) $ 10.00 $ 75,000.00 10 1 LS All Other Work Required by the Contract Documents $ 31,692.50 $ 31,692.50 11 $ - 12 $ - 13 $ - 14 $ - 15 $ - Total Construction Estimate Contingency (10%) Engineering/Planning (10%) Engineering Inspection (20%) Land Acquisition Legal (5%) Permitting (5%) TOTALI $ 698,819.63 $ 69,881.96 $ 69,881.96 $ 167,716.71 $ - $ 34,940.98 $ 34,940.98 $ 1,076,182.22 * Note - Estimate is based on 2020/2021 Labor/Equipment/Material costs. No escalation is included here. Escalation, if needed, will be added on the CIP Summary Page 8" Pipeline in Skislope Way below Ski Lodge Tank Site Item Quantity Unit Description Unit Price Total Price 1 1 LS Mob/Demob 5% $ 12,565.44 2 550 LF 8" Water Main $ 170.00 $ 93,500.00 3 275 LF 2" PE Water Service Lateral $ 85.00 $ 23,375.00 4 1 10 EA Water Service $ 3,250.00 $ 32,500.00 5 1 EA Fire Hydrant $ 9,300.00 $ 9,300.00 6 2 EA Connection to Existing Pipe $ 6,500.00 $ 11,916.67 8 28 HRS Rock Excavation $ 1,500.00 $ 41,250.00 9 2750 SF AC Pavement and Base (Trench Restoration) $ 10.00 $ 27,500.00 10 1 LS All Other Work Required by the Contract Documents $ 11,967.08 $ 11,967.08 11 $ - 12 $ - 13 $ - 14 $ - 15 $ - Total Construction Estimate Contingency (10%) Engineering/Planning (10%) Engineering Inspection (20%) Land Acquisition Legal (5%) Permitting (5%) TOTAL $ 263,874.19 $ 26,387.42 $ 26,387.42 $ 63,329.81 $ - $ 13,193.71 $ 13,193.71 $ 406,366.25 * Note - Estimate is based on 2020/2021 Labor/Equipment/Material costs. No escalation is included here. Escalation, if needed, will be added on the CIP Summary Page Pinnacle Hydropnuematic Pump Station Upgrade Item Quantity Unit Description Unit Price Total Price 1 1 LS Mob/Demob 5% $ 9,000.00 2 1 LS Sitework $ 20,000.00 $ 20,000.00 3 1 LS Hydropneumatic PS Skid $ 50,000.00 $ 50,000.00 4 1 150 SF New Pump Station Building $ 500.00 $ 75,000.00 5 1 LS Electrical $ 35,000.00 $ 35,000.00 6 $ - 7 $ 8 $ 9 $ - 10 $ - 11 $ - 12 $ 13 $ - 14 $ - Total Construction Estimate Contingency (10%) Engineering/Planning (10%) Engineering Inspection (20%) Land Acquisition Legal (5%) Permitting (5%)l TOTAL $ 189,000.00 $ 18,900.00 $ 18,900.00 $ 45,360.00 $ - $ 9,450.00 $ 9,450.00 $ 291,060.00 * Note - Estimate is based on 2020/2021 Labor/Equipment/Material costs. No escalation is included here. Escalation, if needed, will be added on the CIP Summary Page 8" Pipeline in Northwoods Blvd to extend Donner View Zone Item Quantity Unit Description Unit Price Total Price 1 1 LS Mob/Demob 5% $ 11,053.88 2 500 LF 8" Water Main $ 170.00 $ 85,000.00 3 250 LF 2" PE Water Service Lateral $ 85.00 $ 21,250.00 4 1 6 EA Water Service $ 3,250.00 $ 19,500.00 5 1 EA Fire Hydrant $ 9,300.00 $ 9,300.00 6 2 EA Connection to Existing Pipe $ 6,500.00 $ 13,000.00 8 25 HRS Rock Excavation $ 1,500.00 $ 37,500.00 9 2500 SF AC Pavement and Base (Trench Restoration) $ 10.00 $ 25,000.00 10 1 LS All Other Work Required by the Contract Documents $ 10,527.50 $ 10,527.50 11 $ - 12 $ - 13 $ - 14 $ - 15 $ - Total Construction Estimate Contingency (10%) Engineering/Planning (10%) Engineering Inspection (20%) Land Acquisition Legal (5%) Permitting (5%) TOTAL $ 232,131.38 $ 23,213.14 $ 23,213.14 $ 55,711.53 $ - $ 11,606.57 $ 11,606.57 $ 357,482.32 * Note - Estimate is based on 2020/2021 Labor/Equipment/Material costs. No escalation is included here. Escalation, if needed, will be added on the CIP Summary Page 8" Pipeline in Rocky Lane to extend Donner Trail Hydro Zone Item Quantity Unit Description Unit Price Total Price 1 1 LS Mob/Demob 5% $ 32,332.13 2 1500 LF 8" Water Main $ 170.00 $ 255,000.00 3 750 LF 2" PE Water Service Lateral $ 85.00 $ 63,750.00 4 1 18 EA Water Service $ 3,250.00 $ 58,500.00 5 2 EA Fire Hydrant $ 9,300.00 $ 18,600.00 6 5 EA Connection to Existing Pipe $ 6,500.00 $ 32,500.00 8 75 HRS Rock Excavation $ 1,500.00 $ 112,500.00 9 7500 SF AC Pavement and Base (Trench Restoration) $ 10.00 $ 75,000.00 10 1 LS All Other Work Required by the Contract Documents $ 30,792.50 $ 30,792.50 11 $ - 12 $ - 13 $ - 14 $ - 15 $ - Total Construction Estimate Contingency (10%) Engineering/Planning (10%) Engineering Inspection (20%) Land Acquisition Legal (5%) Permitting (5%) TOTALI $ 678,974.63 $ 67,897.46 $ 67,897.46 $ 162,953.91 $ - $ 33,948.73 $ 33,948.73 $ 1,045,620.92 * Note - Estimate is based on 2020/2021 Labor/Equipment/Material costs. No escalation is included here. Escalation, if needed, will be added on the CIP Summary Page 6" Pipeline in McPhetres Street Item Quantity Unit Description Unit Price Total Price 1 1 LS Mob/Demob 5% $ 3,083.50 2 200 LF 6" Water Main $ 116.00 $ 23,200.00 3 1 EA Fire Hydrant $ 9,300.00 $ 6,200.00 4 1 1 EA Connection to Existing Pipe $ 6,500.00 $ 4,333.33 5 10 HRS Rock Excavation $ 1,500.00 $ 15,000.00 6 1000 SF AC Pavement and Base (Trench Restoration) $ 10.00 $ 10,000.00 7 1 LS All Other Work Required by the Contract Documents $ 2,936.67 $ 2,936.67 8 $ - 9 $ - 10 $ - 11 $ - 12 $ - Total Construction Estimate Contingency (10%) Engineering/Planning (10%) Engineering Inspection (20%) Land Acquisition Legal (5%) Permitting (5%) TOTAL $ 64,753.50 $ 6,475.35 $ 6,475.35 $ 15,540.84 $ - $ 3,237.68 $ 3,237.68 $ 99,720.39 * Note - Estimate is based on 2020/2021 Labor/Equipment/Material costs. No escalation is included here. Escalation, if needed, will be added on the CIP Summary Page 8" Pipeline in Blueberry Rd and Purple Sage Rd to extend Palisades Hydro Zone Item Quantity Unit Description Unit Price Total Price 1 1 LS Mob/Demob 5% $ 12,029.94 2 550 LF 8" Water Main $ 170.00 $ 93,500.00 3 275 LF 2" PE Water Service Lateral $ 85.00 $ 23,375.00 4 1 4 EA Water Service $ 3,250.00 $ 13,000.00 5 2 EA Fire Hydrant $ 9,300.00 $ 18,600.00 6 2 EA Connection to Existing Pipe $ 6,500.00 $ 11,916.67 8 28 HRS Rock Excavation $ 1,500.00 $ 41,250.00 9 2750 SF AC Pavement and Base (Trench Restoration) $ 10.00 $ 27,500.00 10 1 LS All Other Work Required by the Contract Documents $ 11,457.08 $ 11,457.08 11 $ - 12 $ - 13 $ - 14 $ - 15 $ - Total Construction Estimate Contingency (10%) Engineering/Planning (10%) Engineering Inspection (20%) Land Acquisition Legal (5%) Permitting (5%) TOTAL $ 252,628.69 $ 25,262.87 $ 25,262.87 $ 60,630.89 $ - $ 12,631.43 $ 12,631.43 $ 389,048.18 * Note - Estimate is based on 2020/2021 Labor/Equipment/Material costs. No escalation is included here. Escalation, if needed, will be added on the CIP Summary Page Roundhill Drive Pressure Zone Changes Item Quantity Unit Description Unit Price Total Price 1 1 LS Mob/Demob 5% $ 1,897.50 2 7 EA Water Service $ 3,250.00 $ 22,750.00 3 2 HRS Rock Excavation $ 1,500.00 $ 3,000.00 4 1 350 SF AC Pavement and Base (Small Patching) $ 25.00 $ 8,750.00 5 1 LS All Other Work Required by the Contract Documents $ 3,450.00 $ 3,450.00 6 $ - 7 $ - 8 $ - Total Construction Estimate Contingency (10%) Engineering/Planning (10%) Engineering Inspection (20%) Land Acquisition Legal (5%) Permitting (5%) TOTAL $ 39,847.50 $ 3,984.75 $ 3,984.75 $ 9,563.40 $ - $ 1,992.38 $ 1,992.38 $ 61,365.15 * Note - Estimate is based on 2020/2021 Labor/Equipment/Material costs. No escalation is included here. Escalation, if needed, will be added on the CIP Summary Page Connect Piping at Glenshire Drive & Somerset Drive Item Quantity Unit Description Unit Price Total Price 1 1 LS Mob/Demob 5% $ 1,860.00 2 20 LF 6" Water Main $ 200.00 $ 4,000.00 3 1 LS Pipe Fittings/Valve $ 15,000.00 $ 15,000.00 4 1 2 HRS Rock Excavation $ 1,500.00 $ 3,000.00 5 200 SF AC Pavement and Base (Small Patching) $ 25.00 $ 5,000.00 6 1 LS Traffic Control Allowance $ 7,500.00 $ 7,500.00 7 1 LS All Other Work Required by the Contract Documents $ 2,700.00 $ 2,700.00 8 $ - 9 $ - 10 $ - 11 $ - 12 $ - 13 $ - 14 $ - 15 $ - Total Construction Estimate Contingency (10%) Engineering/Planning (10%) Engineering Inspection (20%) Land Acquisition Legal (5%) Permitting (5%) TOTALI $ 39,060.00 $ 3,906.00 $ 3,906.00 $ 9,374.40 $ - $ 1,953.00 $ 1,953.00 $ 60,152.40 * Note - Estimate is based on 2020/2021 Labor/Equipment/Material costs. No escalation is included here. Escalation, if needed, will be added on the CIP Summary Page Airport Well Pump & Motor Replacement Item Quantity Unit Description Unit Price Total Price 1 1 LS Mob/Demob 5% $ 4,700.00 2 4 EA Remove Existing Pumps $ 5,000.00 $ 20,000.00 3 4 EA Install New Pump/Motors $ 16,000.00 $ 64,000.00 4 1 LS Electrical $ 10,000.00 $ 10,000.00 5 $ - 6 $ - 7 $ - 8 $ - 9 $ - 10 $ - 11 $ - 12 $ - Total Construction Estimate Contingency (10%) Engineering/Planning (10%) Engineering Inspection (20%) Land Acquisition Legal (5%) Permitting (5%) TOTAL $ 98,700.00 $ 9,870.00 $ 9,870.00 $ 23,688.00 $ - $ 4,935.00 $ 4,935.00 $ 151,998.00 * Note - Estimate is based on 2020/2021 Labor/Equipment/Material costs. No escalation is included here. Escalation, if needed, will be added on the CIP Summary Page Sanders Well facility Replacement Item Quantity Unit Description Unit Price Total Price 1 1 LS Mob/Demob 5% $ 8,600.00 2 1 LS New Well & Pump (290 GPM) (No Well Rehab) $ 12,000.00 $ 12,000.00 3 1 LS Sitework $ 5,000.00 $ 5,000.00 4 1 225 SF New Well House $ 500.00 $ 112,500.00 5 1 LS Chemical Dosing System $ 22,500.00 $ 22,500.00 6 1 LS Electrical $ 20,000.00 $ 20,000.00 7 $ 8 $ 9 $ - 10 $ - 11 $ - 12 $ - Total Construction Estimate Contingency (20%) Engineering/Planning (10%) Engineering Inspection (20%) Land Acquisition Legal (5%) Permitting (5%) TOTAL $ 180,600.00 $ 36,120.00 $ 18,060.00 $ 46,956.00 $ - $ 9,030.00 $ 9,030.00 $ 299,796.00 * Note - Estimate is based on 2020/2021 Labor/Equipment/Material costs. No escalation is included here. Escalation, if needed, will be added on the CIP Summary Page 8" Pipeline in Olympic Blvd from East Ridge Road to Kayhoe Court Item Quantity Unit Description Unit Price Total Price 1 1 LS Mob/Demob 5% $ 28,082.25 2 1300 LF 8" Water Main $ 170.00 $ 221,000.00 3 650 LF 2" PE Water Service Lateral $ 85.00 $ 55,250.00 4 1 21 EA Water Service $ 3,250.00 $ 68,250.00 6 3 EA Fire Hydrant $ 9,300.00 $ 27,900.00 7 65 HRS Rock Excavation $ 1,500.00 $ 97,500.00 8 6500 SF AC Pavement and Base (Trench Restoration) $ 10.00 $ 65,000.00 9 1 LS All Other Work Required by the Contract Documents $ 26,745.00 $ 26,745.00 10 $ - 11 $ - 12 $ - 13 $ - 14 t $ - Total Construction Estimate Contingency (10%) Engineering/Planning (10%) Engineering Inspection (20%) Land Acquisition Legal (5%) Permitting (5%) TOTAL $ 589,727.25 $ 58,972.73 $ 58,972.73 $ 141,534.54 $ - $ 29,486.36 $ 29,486.36 $ 908,179.97 * Note - Estimate is based on 2020/2021 Labor/Equipment/Material costs. No escalation is included here. Escalation, if needed, will be added on the CIP Summary Page Innsbruck Pump Station Upgrade Item Quantity Unit Description Unit Price Total Price 1 1 LS Mob/Demob 5% $ 49,320.00 2 1 LS Demolition $ 50,000.00 $ 50,000.00 3 1 LS Sitework $ 40,000.00 $ 40,000.00 4 4 EA New 50HP Pumps/Piping $ 75,000.00 $ 300,000.00 5 720 SF New Pump Station (36 x 20 Masonry Structure) $ 600.00 $ 432,000.00 6 1 LS Electrical $ 164,400.00 $ 164,400.00 7 $ - 8 $ - 9 $ - 10 $ - 11 $ - 12 $ - 13 $ - 14 $ - Total Construction Estimate Contingency (10%) Engineering/Planning (10%) Engineering Inspection (20%) Land Acquisition Legal (5%) Permitting (5%) TOTALI $ 1,035,720.00 $ 103,572.00 $ 103,572.00 $ 248,572.80 $ - $ 51,786.00 $ 51,786.00 $ 1,595,008.80 * Note - Estimate is based on 2020/2021 Labor/Equipment/Material costs. No escalation is included here. Escalation, if needed, will be added on the CIP Summary Page 4" Pipeline in Northwoods Blvd to extend Stockholm Zone Item Quantity Unit Description Unit Price Total Price 1 1 LS Mob/Demob 5% $ 7,643.13 2 500 LF 4" Water Main $ 76.00 $ 38,000.00 3 250 LF 2" PE Water Service Lateral $ 85.00 $ 21,250.00 4 1 4 EA Water Service $ 3,250.00 $ 13,000.00 5 2 EA Connection to Existing Pipe $ 6,500.00 $ 10,833.33 6 25 HRS Rock Excavation $ 1,500.00 $ 37,500.00 7 2500 SF AC Pavement and Base (Trench Restoration) $ 10.00 $ 25,000.00 8 1 LS All Other Work Required by the Contract Documents $ 7,279.17 $ 7,279.17 9 $ - 10 $ - 11 $ - 12 $ - 13 t $ - Total Construction Estimate Contingency (10%) Engineering/Planning (10%) Engineering Inspection (20%) Land Acquisition Legal (5%) Permitting (5%) TOTAL $ 160,505.63 $ 16,050.56 $ 16,050.56 $ 38,521.35 $ - $ 8,025.28 $ 8,025.28 $ 247,178.66 * Note - Estimate is based on 2020/2021 Labor/Equipment/Material costs. No escalation is included here. Escalation, if needed, will be added on the CIP Summary Page 8" Pipeline in Aspenwood Rd to Extend Palisades Hydro Zone Item Quantity Unit Description Unit Price Total Price 1 1 LS Mob/Demob 5% $ 7,126.18 2 325 LF 8" Water Main $ 170.00 $ 55,250.00 3 162 LF 2" PE Water Service Lateral $ 85.00 $ 13,770.00 4 1 3 EA Water Service $ 3,250.00 $ 9,750.00 5 1 EA Fire Hydrant $ 9,300.00 $ 9,300.00 6 1 EA Connection to Existing Pipe $ 6,500.00 $ 7,041.67 8 16 HRS Rock Excavation $ 1,500.00 $ 24,375.00 9 1625 SF AC Pavement and Base (Trench Restoration) $ 10.00 $ 16,250.00 10 1 LS All Other Work Required by the Contract Documents $ 6,786.83 $ 6,786.83 11 $ - 12 $ - 13 $ - 14 $ - 15 $ - Total Construction Estimate Contingency (10%) Engineering/Planning (10%) Engineering Inspection (20%) Land Acquisition Legal (5%) Permitting (5%) TOTAL $ 149,649.68 $ 14,964.97 $ 14,964.97 $ 35,915.92 $ - $ 7,482.48 $ 7,482.48 $ 230,460.50 * Note - Estimate is based on 2020/2021 Labor/Equipment/Material costs. No escalation is included here. Escalation, if needed, will be added on the CIP Summary Page 8" Pipeline in Sitzmark Way to extend Sitzmark Zone Item Quantity Unit Description Unit Price Total Price 1 1 LS Mob/Demob 5% $ 6,339.38 2 300 LF 8" Water Main $ 170.00 $ 51,000.00 3 150 LF 2" PE Water Service Lateral $ 85.00 $ 12,750.00 4 1 4 EA Water Service $ 3,250.00 $ 13,000.00 5 1 EA Connection to Existing Pipe $ 6,500.00 $ 6,500.00 6 15 HRS Rock Excavation $ 1,500.00 $ 22,500.00 7 1500 SF AC Pavement and Base (Trench Restoration) $ 10.00 $ 15,000.00 8 1 LS All Other Work Required by the Contract Documents $ 6,037.50 $ 6,037.50 9 $ - 10 $ - 11 $ - 12 $ - 13 t $ - Total Construction Estimate Contingency (10%) Engineering/Planning (10%) Engineering Inspection (20%) Land Acquisition Legal (5%) Permitting (5%) TOTAL $ 133,126.88 $ 13,312.69 $ 13,312.69 $ 31,950.45 $ - $ 6,656.34 $ 6,656.34 $ 205,015.39 * Note - Estimate is based on 2020/2021 Labor/Equipment/Material costs. No escalation is included here. Escalation, if needed, will be added on the CIP Summary Page 8" Pipeline in Skislope Way to extend Donner View Hydro Zone Item Quantity Unit Description Unit Price Total Price 1 1 LS Mob/Demob 5% $ 5,884.81 2 250 LF 8" Water Main $ 170.00 $ 42,500.00 3 125 LF 2" PE Water Service Lateral $ 85.00 $ 10,625.00 4 1 4 EA Water Service $ 3,250.00 $ 13,000.00 5 1 EA Fire Hydrant $ 9,300.00 $ 9,300.00 6 1 EA Connection to Existing Pipe $ 6,500.00 $ 5,416.67 8 13 HRS Rock Excavation $ 1,500.00 $ 18,750.00 9 1250 SF AC Pavement and Base (Trench Restoration) $ 10.00 $ 12,500.00 10 1 LS All Other Work Required by the Contract Documents $ 5,604.58 $ 5,604.58 11 $ - 12 $ - 13 $ - 14 $ - 15 $ - Total Construction Estimate Contingency (10%) Engineering/Planning (10%) Engineering Inspection (20%) Land Acquisition Legal (5%) Permitting (5%) TOTAL $ 123,581.06 $ 12,358.11 $ 12,358.11 $ 29,659.46 $ - $ 6,179.05 $ 6,179.05 $ 190,314.84 * Note - Estimate is based on 2020/2021 Labor/Equipment/Material costs. No escalation is included here. Escalation, if needed, will be added on the CIP Summary Page Tank Coating/Rehab Item Quantity Unit Description Unit Price Total Price 1 1 LS Mob/Demob 5% $ 14,017.50 2 1 LS Tank Re -Coating (400,000 Gallon Tank) $ 192,000.00 $ 192,000.00 3 1 LS Tank Structural Repair & Seismic Retrofit Allowance $ 75,000.00 $ 75,000.00 4 1 1 LS All Other Work Required by the Contract Documents $ 13,350.00 $ 13,350.00 5 $ - 6 $ - 7 $ - 8 $ - 9 $ - Total Construction Estimate Contingency (10%) Engineering/Planning (10%) Engineering Inspection (20%) Land Acquisition Legal (5%) Permitting (5%) TOTAL $ 294,367.50 $ 29,436.75 $ 29,436.75 $ 70,648.20 $ - $ 14,718.38 $ 14,718.38 $ 453,325.95 Unit Price based on 400,000 Gallon Tank $ 1.13 * Note - Estimate is based on 2020/2021 Labor/Equipment/Material costs. No escalation is included here. Escalation, if needed, will be added on the CIP Summary Page Tank Coating ONLY Item Quantity Unit Description Unit Price Total Price 1 1 LS Mob/Demob 5% $ 10,080.00 2 1 LS Tank Re -Coating (400,000 Gallon Tank) $ 192,000.00 $ 192,000.00 3 1 LS All Other Work Required by the Contract Documents $ 9,600.00 $ 9,600.00 4 $ - 5 $ - 6 $ - 7 $ - 8 $ - Total Construction Estimate Contingency (10%) Engineering/Planning (10%) Engineering Inspection (20%) Land Acquisition Legal (5%) Permitting (5%) TOTAL $ 211,680.00 $ 21,168.00 $ 21,168.00 $ 50,803.20 $ - $ 10,584.00 $ 10,584.00 $ 325,987.20 Unit Price based on 400,000 Gallon Tank $ 0.81 * Note - Estimate is based on 2020/2021 Labor/Equipment/Material costs. No escalation is included here. Escalation, if needed, will be added on the CIP Summary Page Generic Well facility Replacement Item Quantity Unit Description Unit Price Total Price 1 1 LS Mob/Demob 5% $ 1,750.00 2 1 LS New Well & Pump (300-500 GPM) (No Well Rehab) $ 30,000.00 $ 30,000.00 3 1 LS Electrical $ 5,000.00 $ 5,000.00 4 $ - 5 $ - 6 $ - Total Construction Estimate Contingency (20%) Engineering/Planning (10%) Engineering Inspection (20%) Land Acquisition Legal (5%) Permitting (5%) TOTAL $ 36,750.00 $ 7,350.00 $ 3,675.00 $ 9,555.00 $ - $ 1,837.50 $ 1,837.50 $ 61,005.00 * Note - Estimate is based on 2020/2021 Labor/Equipment/Material costs. No escalation is included here. Escalation, if needed, will be added on the CIP Summary Page Generic Well facility Replacement Item Quantity Unit Description Unit Price Total Price 1 1 LS Mob/Demob 5% $ 3,000.00 2 1 LS New Well & Pump (800-1000 GPM) (No Well Rehab) $ 55,000.00 $ 55,000.00 3 1 LS Electrical $ 5,000.00 $ 5,000.00 4 $ - 5 $ - 6 $ - Total Construction Estimate Contingency (20%) Engineering/Planning (10%) Engineering Inspection (20%) Land Acquisition Legal (5%) Permitting (5%) TOTAL $ 63,000.00 $ 12,600.00 $ 6,300.00 $ 16,380.00 $ - $ 3,150.00 $ 3,150.00 $ 104,580.00 * Note - Estimate is based on 2020/2021 Labor/Equipment/Material costs. No escalation is included here. Escalation, if needed, will be added on the CIP Summary Page Generic Well facility Replacement Item Quantity Unit Description Unit Price Total Price 1 1 LS Mob/Demob 5% $ 4,500.00 2 1 LS New Well & Pump (1200-1500 GPM) (No Well Rehab) $ 85,000.00 $ 85,000.00 3 1 LS Electrical $ 5,000.00 $ 5,000.00 4 $ - 5 $ - 6 $ - Total Construction Estimate Contingency (20%) Engineering/Planning (10%) Engineering Inspection (20%) Land Acquisition Legal (5%) Permitting (5%) TOTAL $ 94,500.00 $ 18,900.00 $ 9,450.00 $ 24,570.00 $ - $ 4,725.00 $ 4,725.00 $ 156,870.00 * Note - Estimate is based on 2020/2021 Labor/Equipment/Material costs. No escalation is included here. Escalation, if needed, will be added on the CIP Summary Page Generic 6" PRV - Valve/Piping Replacement Project Item Quantity Unit Description Unit Price Total Price 1 1 LS Mob/Demob 5% $ 822.03 2 1 LS 6" PRV w/ 2" Bypass $ 14,946.00 $ 14,946.00 3 1 LS All Other Work Required by the Contract Documents $ 1,494.60 $ 1,494.60 4 $ - 5 $ - 6 $ - 7 $ - 8 $ - 9 $ - 10 $ - 11 $ - 12 $ - Total Construction Estimate Contingency (10%) Engineering/Planning (10%) Engineering Inspection (20%) Land Acquisition Legal (5%) Permitting (5%) TOTAL $ 17,262.63 $ 1,726.26 $ 1,726.26 $ 4,143.03 $ - $ 863.13 $ 863.13 $ 26,584.45 * Note - Estimate is based on 2020/2021 Labor/Equipment/Material costs. No escalation is included here. Escalation, if needed, will be added on the CIP Summary Page Generic - 4" Water Line Item Quantity Unit Description Unit Price Total Price 1 1 LS Mob/Demob 5% $ 8,733.38 2 500 LF 4" Water Main $ 76.00 $ 38,000.00 3 250 LF 2" PE Water Service Lateral $ 85.00 $ 21,250.00 4 1 4 EA Water Service $ 3,250.00 $ 13,000.00 5 2 EA Fire Hydrant $ 9,300.00 $ 18,600.00 6 2 EA Connection to Existing Pipe $ 6,500.00 $ 13,000.00 8 25 HRS Rock Excavation $ 1,500.00 $ 37,500.00 9 2500 SF AC Pavement and Base (trench restoration) $ 10.00 $ 25,000.00 10 1 LS All Other Work Required by the Contract Documents $ 8,317.50 $ 8,317.50 11 $ - 12 $ - 13 $ - 14 $ - 15 $ - Total Construction Estimate Contingency (10%) Engineering/Planning (10%) Engineering Inspection (20%) Land Acquisition Legal (5%) Permitting (5%) TOTAL $ 183,400.88 $ 18,340.09 $ 18,340.09 $ 44,016.21 $ - $ 9,170.04 L 9,170.04 $ 282,437.35 Per LF $ 564.87 * Note - Estimate is based on 2020/2021 Labor/Equipment/Material costs. No escalation is included here. Escalation, if needed, will be added on the CIP Summary Page Generic - 6" Water Line Item Quantity Unit Description Unit Price Total Price 1 1 LS Mob/Demob 5% $ 9,783.38 2 500 LF 6" Water Main $ 116.00 $ 58,000.00 3 250 LF 2" PE Water Service Lateral $ 85.00 $ 21,250.00 4 1 4 EA Water Service $ 3,250.00 $ 13,000.00 5 2 EA Fire Hydrant $ 9,300.00 $ 18,600.00 6 2 EA Connection to Existing Pipe $ 6,500.00 $ 13,000.00 8 25 HRS Rock Excavation $ 1,500.00 $ 37,500.00 9 2500 SF AC Pavement and Base (trench restoration) $ 10.00 $ 25,000.00 10 1 LS All Other Work Required by the Contract Documents $ 9,317.50 $ 9,317.50 11 $ - 12 $ - 13 $ - 14 $ - 15 $ - Total Construction Estimate Contingency (10%) Engineering/Planning (10%) Engineering Inspection (20%) Land Acquisition Legal (5%) Permitting (5%) TOTAL $ 205,450.88 $ 20,545.09 $ 20,545.09 $ 49,308.21 $ - $ 10,272.54 $ 10,272.54 $ 316,394.35 Per LF $ 632.79 * Note - Estimate is based on 2020/2021 Labor/Equipment/Material costs. No escalation is included here. Escalation, if needed, will be added on the CIP Summary Page Generic - 8" Water Line Item Quantity Unit Description Unit Price Total Price 1 1 LS Mob/Demob 5% $ 20,060.25 2 1000 LF 8" Water Main $ 170.00 $ 170,000.00 3 500 LF 2" PE Water Service Lateral $ 85.00 $ 42,500.00 4 1 4 EA Water Service $ 3,250.00 $ 13,000.00 5 2 EA Fire Hydrant $ 9,300.00 $ 18,600.00 6 2 EA Connection to Existing Pipe $ 6,500.00 $ 13,000.00 8 50 HRS Rock Excavation $ 1,500.00 $ 75,000.00 9 5000 SF AC Pavement and Base (trench restoration) $ 10.00 $ 50,000.00 10 1 LS All Other Work Required by the Contract Documents $ 19,105.00 $ 19,105.00 11 $ - 12 $ - 13 $ - 14 $ - 15 $ - Total Construction Estimate Contingency (10%) Engineering/Planning (10%) Engineering Inspection (20%) Land Acquisition Legal (5%) Permitting (5%) TOTAL $ 421,265.25 $ 42,126.53 $ 42,126.53 $ 101,103.66 $ - $ 21,063.26 $ 21,063.26 $ 648,748.49 Per LF $ 648.75 * Note - Estimate is based on 2020/2021 Labor/Equipment/Material costs. No escalation is included here. Escalation, if needed, will be added on the CIP Summary Page Generic -10" Water Line Item Quantity Unit Description Unit Price Total Price 1 1 LS Mob/Demob 5% $ 11,358.38 2 500 LF 10" Water Main $ 176.00 $ 88,000.00 3 250 LF 2" PE Water Service Lateral $ 85.00 $ 21,250.00 4 1 4 EA Water Service $ 3,250.00 $ 13,000.00 5 2 EA Fire Hydrant $ 9,300.00 $ 18,600.00 6 2 EA Connection to Existing Pipe $ 6,500.00 $ 13,000.00 8 25 HRS Rock Excavation $ 1,500.00 $ 37,500.00 9 2500 SF AC Pavement and Base (trench restoration) $ 10.00 $ 25,000.00 10 1 LS All Other Work Required by the Contract Documents $ 10,817.50 $ 10,817.50 11 $ - 12 $ 13 $ - 14 $ - 15 $ - Total Construction Estimate Contingency (10%) Engineering/Planning (10%) Engineering Inspection (20%) Land Acquisition Legal (5%) Permitting (5%) TOTAL $ 238,525.88 $ 23,852.59 $ 23,852.59 $ 57,246.21 $ - $ 11,926.29 $ 11,926.29 $ 367,329.85 Per LF $ 734.66 * Note - Estimate is based on 2020/2021 Labor/Equipment/Material costs. No escalation is included here. Escalation, if needed, will be added on the CIP Summary Page Generic -12" Pipeline Item Quantity Unit Description Unit Price Total Price 1 1 LS Mob/Demob 5% $ 17,126.81 2 750 LF 12" Water Main $ 208.00 $ 156,000.00 3 375 LF 2" PE Water Service Lateral $ 85.00 $ 31,875.00 4 1 4 EA Water Service $ 3,250.00 $ 13,000.00 5 2 EA Fire Hydrant $ 9,300.00 $ 18,600.00 6 2 EA Connection to Existing Pipe $ 6,500.00 $ 13,000.00 8 38 HRS Rock Excavation $ 1,500.00 $ 56,250.00 9 3750 SF AC Pavement and Base (trench restoration) $ 10.00 $ 37,500.00 10 1 LS All Other Work Required by the Contract Documents $ 16,311.25 $ 16,311.25 11 $ - 12 $ 13 $ 14 $ - 15 $ - Total Construction Estimate Contingency (10%) Engineering/Planning (10%) Engineering Inspection (20%) Land Acquisition Legal (5%) Permitting (5%) TOTAL $ 359,663.06 $ 35,966.31 $ 35,966.31 $ 86,319.14 $ - $ 17,983.15 $ 17,983.15 $ 553,881.12 Per LF $ 738.51 * Note - Estimate is based on 2020/2021 Labor/Equipment/Material costs. No escalation is included here. Escalation, if needed, will be added on the CIP Summary Page 3 EA - 25 HP Generic Pump Station Upgrade Item Quantity Unit Description Unit Price Total Price 1 1 LS Mob/Demob 5% $ 36,900.00 2 1 LS Demolition $ 50,000.00 $ 50,000.00 3 1 LS Sitework $ 40,000.00 $ 40,000.00 4 3 EA New 25 HP Pumps/Piping $ 45,000.00 $ 135,000.00 5 600 SF New Pump Station (Masonry Bldg - 20 x 30) $ 650.00 $ 390,000.00 6 1 LS Electrical $ 123,000.00 $ 123,000.00 7 $ - 8 $ - 9 $ - 10 $ - 11 $ - 12 $ - 13 $ - 14 $ - Total Construction Estimate Contingency (10%) Engineering/Planning (10%) Engineering Inspection (20%) Land Acquisition Legal (5%) Permitting (5%) TOTALI $ 774,900.00 $ 77,490.00 $ 77,490.00 $ 185,976.00 $ - $ 38,745.00 $ 38,745.00 $ 1,193,346.00 * Note - Estimate is based on 2020/2021 Labor/Equipment/Material costs. No escalation is included here. Escalation, if needed, will be added on the CIP Summary Page 4 EA - 100 HP Generic Pump Station Upgrade Item Quantity Unit Description Unit Price Total Price 1 1 LS Mob/Demob 5% $ 55,080.00 2 1 LS Demolition $ 50,000.00 $ 50,000.00 3 1 LS Sitework $ 40,000.00 $ 40,000.00 4 4 EA New 100 HP Pumps/Piping $ 90,000.00 $ 360,000.00 5 720 SF New Pump Station (Masonry Bldg - 20 x 30) $ 650.00 $ 468,000.00 6 1 LS Electrical $ 183,600.00 $ 183,600.00 7 $ - 8 $ - 9 $ - 10 $ - 11 $ - 12 $ - 13 $ - 14 $ - Total Construction Estimate Contingency (10%) Engineering/Planning (10%) Engineering Inspection (20%) Land Acquisition Legal (5%) Permitting (5%) TOTALI $ 1,156,680.00 $ 115,668.00 $ 115,668.00 $ 277,603.20 $ - $ 57,834.00 $ 57,834.00 $ 1,781,287.20 * Note - Estimate is based on 2020/2021 Labor/Equipment/Material costs. No escalation is included here. Escalation, if needed, will be added on the CIP Summary Page 4 EA - 150 HP Generic Pump Station Upgrade Item Quantity Unit Description Unit Price Total Price 1 1 LS Mob/Demob 5% $ 59,880.00 2 1 LS Demolition $ 50,000.00 $ 50,000.00 3 1 LS Sitework $ 40,000.00 $ 40,000.00 4 4 EA New 150 HP Pumps/Piping $ 110,000.00 $ 440,000.00 5 720 SF New Pump Station (Masonry Bldg - 20 x 30) $ 650.00 $ 468,000.00 6 1 LS Electrical $ 199,600.00 $ 199,600.00 7 $ - 8 $ - 9 $ - 10 $ - 11 $ - 12 $ - 13 $ - 14 $ - Total Construction Estimate Contingency (10%) Engineering/Planning (10%) Engineering Inspection (20%) Land Acquisition Legal (5%) Permitting (5%) TOTALI $ 1,257,480.00 $ 125,748.00 $ 125,748.00 $ 301,795.20 $ - $ 62,874.00 $ 62,874.00 $ 1,936,519.20 * Note - Estimate is based on 2020/2021 Labor/Equipment/Material costs. No escalation is included here. Escalation, if needed, will be added on the CIP Summary Page Appendix E Detailed Cost Estimates Cost Report Pre -Construction Services Group 202OTDPUDCIP Truckee Donner PUD CIP Cost Basis Biditem 5 Base Labor U. Cost 8.81 Total 2,467.34 Manhours 70.0000 4" Water Line Takeoff Qty: Bid Qty: Burden Total Labor 8.39 17.20 2,348.80 4,816.14 Unit/MH MH/Unit 4.0000 0.2500 280.000 LF 280.000 LF Equipment Perm Matls Const Matls 5.11 29.25 0.85 1,432.16 8,191.38 237.82 $/MH Base Labor/MH 243.7500 35.2477 Page 1 of 35 03/16/2020 7:29 AM Sub Total 8.52 60.94 2,385.00 17,062.50 Total Labor/MH Unit/CH 68.8020 14.0000 Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U. Cost 0.23 0.22 0.45 0.12 0.00 0.04 0.00 0.61 Total 128.98 122.03 251.01 67.52 0.00 21.62 0.00 340.15 Crew $/Unit Crew Hrs/Unit Units/Crew Hr $/Crew Hour Shifts Units/Shift Shifts/Unit $/Shift 0.5688 0.0036 280.0000 159.2650 0.2500 2,240.0000 0.0004 1,360.6000 Manhours Unit/MH MH/Unit Total Labor/MH Base Labor/Unit 4.0000 140.0000 0.0071 62.7525 0.2303 Calendar: STD Standard Hrs/Shift: 8 WC: 5221 Concrete Construction Crew: LAB4 4 Man Labor Crew Prod: S 0.25 Eff: 100.00 Crew Hrs: 2.00 Labor PCs: 2.00 Equipment PCs: 2.00 Notes: Assume an average of 4" pavement depth. Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT % Actual UC Total 3MISCTOOL Misc Tool Allowance 1.00 2.00 HR 10.00 108.10 10.81 21.62 8231 SAW CONCRETE 20-29HP SELF PR 1.00 2.00 HR 22.90 108.10 24.76 49.52 8UTLPU Utility Pickup 1.00 2.00 HR 9.00 100.00 9.00 18.00 LAB4 Labor Foreman 1.00 2.00 MH 34.00 100.00 64.91 129.81 LABORER Laborer 1.00 2.00 MH 30.49 100.00 60.60 121.20 Activity: 5.2 Excavate/ Install/ Backfill • :• Unit: LF Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U. Cost 4.35 4.05 8.39 2.97 0.00 0.39 6.57 18.32 Total 1,216.96 1,133.20 2,350.16 830.26 0.00 108.10 1,840.00 5,128.52 Crew $/Unit Crew Hrs/Unit Units/Crew Hr $/Crew Hour Shifts Units/Shift Shifts/Unit $/Shift 11.3586 0.0286 35.0000 397.5525 1.0000 280.0000 0.0036 5,128.5200 Manhours Unit/MH MH/Unit Total Labor/MH Base Labor/Unit 32.0000 8.7500 0.1143 73.4425 4.3463 Calendar: STD Standard Hrs/Shift: 8 WC: 5221 Concrete Construction Crew: MINIP Mini Pipe Crew Prod: S 1 Eff: 100.00 Crew Hrs: 8.00 Labor PCs: 4.00 Equipment PCs: 3.00 Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT % Actual UC Total 3TRAFFICPLAT Traffic Plate 1.00 2.00 EA/D 50.00 108.10 54.05 108.10 4HAUL Hauling - Sub 1.00 16.00 HR 115.00 100.00 115.00 1,840.00 8031 ROLLER 18-29" WALKBEHIND DBL 1.00 8.00 HR 37.47 108.10 40.50 324.01 8243 BACKHOE/LOADER 60-90HP 4WD 1.00 8.00 HR 50.21 108.10 54.28 434.25 8UTLPU Utility Pickup 1.00 8.00 HR 9.00 100.00 9.00 72.00 LABORER Laborer 2.00 16.00 MH 30.49 100.00 60.60 969.58 OPER4 Operator Foreman 1.00 8.00 MH 48.00 100.00 89.27 714.13 OPERATOR Operator 1.00 8.00 MH 43.14 100.00 83.31 666.45 2020TDPUDCIP Truckee Donner PUD CIP Cost Basis 03/16/2020 7:29 AM Page 2 of 35 Base Labor Burden Total Labor U. Cost 0.46 0.43 0.90 Total 390.52 363.64 754.16 Crew $/Unit Crew Hrs/Unit Units/Crew Hr 1.3582 0.0024 420.0000 Manhours Unit/MH 10.0000 84.0000 Calendar: STD Standard Hrs/Shift: 8 Crew: BKFL Backfill Crew Prod: S 0.25 Resource Description Pcs/Wste 2A ASPHALT 1.00 2TACKCOAT Tack Coat 1.00 4HAUL Hauling - Sub 1.00 8034 ROLLER 41-49" VIB SINGLE DRU 1.00 8243 BACKHOE/LOADER 60-90HP 4WD 1.00 8324 TRUCK WATER 2000-2999 GALLON 1.00 8BITCHPOT Bitch Pot 1.00 8UTLPU Utility Pickup 1.00 LABORER Laborer 2.00 OPER4 Operator Foreman 1.00 OPERATOR Operator 2.00 Equipment Perm Matls Const Matls Sub Total 0.55 2.68 0.00 0.48 4.61 462.38 2,252.80 0.00 405.00 3,874.34 $/Crew Hour Shifts Units/Shift Shifts/Unit $/Shift 570.4350 0.2500 3,360.0000 0.0003 15,497.3600 MH/Unit Total Labor/MH Base Labor/Unit 0.0119 75.4160 0.4649 WC: 5221 Concrete Construction Eff: 100.00 Crew Hrs: 2.00 Labor PCs: 5.00 Equipment PCs: 4.00 Quantity Unit Unit Cost Tax/OT % Actual UC Total 27.00 TON 72.00 108.10 77.83 2,101.46 280.00 LF 0.50 108.10 0.54 151.34 27.00 TON 15.00 100.00 15.00 405.00 2.00 HR 60.26 108.10 65.14 130.27 2.00 HR 50.21 108.10 54.28 108.56 2.00 HR 60.07 108.10 64.94 129.88 2.00 HR 35.00 108.10 37.84 75.67 2.00 HR 9.00 100.00 9.00 18.00 4.00 MH 30.49 100.00 60.60 242.40 2.00 MH 48.00 100.00 89.27 178.54 4.00 MH 43.14 100.00 83.31 333.22 Calendar: STD Standard Hrs/Shift: 8 Notes: Assume approx 50% of all trench will require re -striping Resource Description Pcs/Wste Quantity Unit 4STRIPE Striping - Sub 1.00 140.00 LF WC: 5221 Concrete Construction Unit Cost Tax/OT % Actual UC Total 1.00 100.00 1.00 140.00 Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 730.88 729.93 1,460.81 72.00 0.00 108.10 0.00 1,640.91 Total 730.88 729.93 1,460.81 72.00 0.00 108.10 0.00 1,640.91 Crew $/Unit Crew Hrs/Unit Units/Crew Hr $/Crew Hour Shifts Units/Shift Shifts/Unit $/Shift 1,532.8100 8.0000 0.1250 191.6013 1.0000 1.0000 1.0000 1,640.9100 Manhours Unit/MH MH/Unit Total Labor/MH Base Labor/Unit 24.0000 0.0417 24.0000 60.8671 730.8800 Calendar: STD Standard Hrs/Shift: 8 WC: 5221 Concrete Construction Crew: LAB4 4 Man Labor Crew Prod: S 1 Eff: 100.00 Crew Hrs: 8.00 Labor PCs: 3.00 Equipment PCs: 1.00 Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT % Actual UC Total 3TCMTL Traffic Control Materials 1.00 1.00 DAY 100.00 108.10 108.10 108.10 8UTLPU Utility Pickup 1.00 8.00 HR 9.00 100.00 9.00 72.00 FLAG Flagger 2.00 16.00 MH 28.68 100.00 58.85 941.58 LAB4 Labor Foreman 1.00 8.00 MH 34.00 100.00 64.90 519.23 Activity: 5.6 Street Reconstruction Quantity: 1 Unit: LS Calendar: STD Standard Hrs/Shift: 8 WC: 5221 Concrete Construction Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT % Actual UC Total 4PAVE AC Paving 1.00 0.00 LS 13,053.21 100.00 0.00 0.00 2O2OTDPUDCIP Truckee Donner PUD CIP Cost Basis 03/16/2020 7:29 AM Page 3 of 35 Base Labor Burdei U. Cost 0.00 0.0( Total 0.00 0.0( Calendar: STD Standard Resource Description 24"FITTING 4" MJ Fitting 24"H20 4" Waterline - C-900 24"MEGALUG 4" Megalug 2BASE Base Rock 2PIPEACC Pipe Accessories 2PIPEALLOW Misc Pipe Matt Allowance 2SAND Bedding Sand - FOB Plant 2VALVEALLOW Valve Allowance Biditem 10 Base Labor U. Cost 9.87 Total 2,467.34 Manhours 70.0000 Total Labor Equipment 0.00 0.00 0.00 0.00 Hrs/Shift: 8 Pcs/Wste Quantity Unit 1.00 1.00 EA 1.05 300.00 LF 1.00 2.00 EA 1.00 60.00 TON 1.00 280.00 LF 1.00 6,213.83 LS 1.00 40.00 TON 1.00 0.50 EA 6" Water Line Takeoff Qty: Bid Qty: Burden Total Labor 9.40 19.26 2,348.80 4,816.14 Unit/MH MH/Unit 3.5714 0.2800 250.000 LF 250.000 LF Perm Matls Const Matls Sub Total 21.21 0.00 0.00 21.21 5,938.58 0.00 0.00 5,938.58 WC: 5221 Concrete Construction Unit Cost Tax/OT % Actual UC Total 365.89 108.10 395.53 395.53 7.19 108.10 7.77 2,331.72 38.12 108.10 41.21 82.42 9.75 108.10 10.54 632.39 1.60 108.10 1.73 484.29 0.10 108.10 0.11 671.72 6.00 108.10 6.49 259.44 2,162.14 100.00 2,162.14 1,081.07 Equipment Perm Matls Const Matls 5.70 41.24 0.95 1,424.21 10,310.59 237.82 $/MH Base Labor/MH 273.0773 35.2477 Sub Total 9.31 76.46 2,326.65 19,115.41 Total Labor/MH Unit/CH 68.8020 12.5000 Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U. cost 0.26 0.24 0.50 0.14 0.00 0.04 0.00 0.68 Total 128.98 122.03 251.01 67.52 0.00 21.62 0.00 340.15 Crew $/Unit Crew Hrs/Unit Units/Crew Hr $/Crew Hour Shifts Units/Shift Shifts/Unit $/Shift 0.6371 0.0040 250.0000 159.2650 0.2500 2,000.0000 0.0005 1,360.6000 Manhours Unit/MH MH/Unit Total Labor/MH Base Labor/Unit 4.0000 125.0000 0.0080 62.7525 0.2580 Calendar: STD Standard Hrs/Shift: 8 WC: 5221 Concrete Construction Crew: LAB4 4 Man Labor Crew Prod: S 0.25 Eff: 100.00 Crew Hrs: 2.00 Labor PCs: 2.00 Equipment PCs: 2.00 Notes: Assume an average of 4" pavement depth. Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT % Actual UC Total 3MISCTOOL Misc Tool Allowance 1.00 2.00 HR 10.00 108.10 10.81 21.62 8231 SAW CONCRETE 20-29HP SELF PR 1.00 2.00 HR 22.90 108.10 24.76 49.52 8UTLPU Utility Pickup 1.00 2.00 HR 9.00 100.00 9.00 18.00 LAB4 Labor Foreman 1.00 2.00 MH 34.00 100.00 64.91 129.81 LABORER Laborer 1.00 2.00 MH 30.49 100.00 60.60 121.20 • • • Unit: LF Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U. Cost 4.87 4.53 9.40 3.32 0.00 0.43 7.36 20.51 Total 1,216.96 1,133.20 2,350.16 830.26 0.00 108.10 1,840.00 5,128.52 Crew $/Unit Crew Hrs/Unit Units/Crew Hr $/Crew Hour Shifts Units/Shift Shifts/Unit $/Shift 12.7217 0.0320 31.2500 397.5525 1.0000 250.0000 0.0040 5,128.5200 Manhours Unit/MH MH/Unit Total Labor/MH Base Labor/Unit 32.0000 7.8125 0.1280 73.4425 4.8678 2020TDPUDCIP Truckee Donner PUD CIP Cost Basis 03/16/2020 7:29 AM Page 4 of 35 Calendar: STD Standard Hrs/Shift: 8 Crew: MINIP Mini Pipe Crew Prod: S 1 Resource Description Pcs/Wste 3TRAFFICPLAT Traffic Plate 1.00 4HAUL Hauling - Sub 1.00 8031 ROLLER 18-29" WALKBEHIND DBL 1.00 8243 BACKHOE/LOADER 60-90HP 4WD 1.00 8UTLPU Utility Pickup 1.00 LABORER Laborer 2.00 OPER4 Operator Foreman 1.00 OPERATOR Operator 1.00 Base Labor Burden Total Labor U.Cost 0.52 0.48 1.01 Total 390.52 363.64 754.16 Crew $/Unit Crew Hrs/Unit Units/Crew Hr 1.5212 0.0027 375.0000 Manhours Unit/MH 10.0000 75.0000 Calendar: STD Standard Hrs/Shift: 8 Crew: BKFL Backfill Crew Prod: S 0.25 Resource Description Pcs/Wste 2A ASPHALT 1.00 2TACKCOAT Tack Coat 1.00 4HAUL Hauling - Sub 1.00 8034 ROLLER 41-49" VIB SINGLE DRU 1.00 8243 BACKHOE/LOADER 60-90HP 4WD 1.00 8324 TRUCK WATER 2000-2999 GALLON 1.00 8BITCHPOT Bitch Pot 1.00 8UTLPU Utility Pickup 1.00 LABORER Laborer 2.00 OPER4 Operator Foreman 1.00 OPERATOR Operator 2.00 WC: 5221 Concrete Construction Eff: 100.00 Crew Hrs: 8.00 Labor PCs: 4.00 Equipment PCs: 3.00 Quantity Unit Unit Cost Tax/OT % Actual UC Total 2.00 EA/D 50.00 108.10 54.05 108.10 16.00 HR 115.00 100.00 115.00 1,840.00 8.00 HR 37.47 108.10 40.50 324.01 8.00 HR 50.21 108.10 54.28 434.25 8.00 HR 9.00 100.00 9.00 72.00 16.00 MH 30.49 100.00 60.60 969.58 8.00 MH 48.00 100.00 89.27 714.13 8.00 MH 43.14 100.00 83.31 666.45 Equipment Perm Matls Const Matls Sub Total 0.61 2.68 0.00 0.48 4.78 454.43 2,011.66 0.00 361.65 3,581.90 $/Crew Hour Shifts Units/Shift Shifts/Unit $/Shift 570.4350 0.2500 3,000.0000 0.0003 14,327.6000 MH/Unit Total Labor/MH Base Labor/Unit 0.0133 75.4160 0.5207 WC: 5221 Concrete Construction Eff: 100.00 Crew Hrs: 2.00 Labor PCs: 5.00 Equipment PCs: 4.00 Quantity Unit Unit Cost Tax/OT % Actual UC Total 24.11 TON 72.00 108.10 77.83 1,876.53 250.00 LF 0.50 108.10 0.54 135.13 24.11 TON 15.00 100.00 15.00 361.65 2.00 HR 60.26 108.10 65.14 130.27 2.00 HR 50.21 108.10 54.28 108.56 2.00 HR 60.07 108.10 64.94 129.88 1.79 HR 35.00 108.10 37.83 67.72 2.00 HR 9.00 100.00 9.00 18.00 4.00 MH 30.49 100.00 60.60 242.40 2.00 MH 48.00 100.00 89.27 178.54 4.00 MH 43.14 100.00 83.31 333.22 Calendar: STD Standard Hrs/Shift: 8 Notes: Assume approx 50 of all trench will require re -striping Resource Description Pcs/Wste Quantity Unit 4STRIPE Striping - Sub 1.00 125.00 LF Base Labor U. cost 730.88 Total 730.88 Crew $/Unit Crew Hrs/Unit 1,532.8100 8.0000 Manhours 24.0000 Calendar: STD Standard Burden Total Labor Equipment 729.93 1,460.81 72.00 729.93 1,460.81 72.00 Units/Crew Hr $/Crew Hour 0.1250 191.6013 Unit/MH 0.0417 Hrs/Shift: 8 WC: 5221 Concrete Construction Unit Cost Tax/OT % Actual UC Total 1.00 100.00 1.00 125.00 • . Perm Matls Const Matls Sub Total 0.00 108.10 0.00 1,640.91 0.00 108.10 0.00 1,640.91 Shifts Units/Shift Shifts/Unit $/Shift 1.0000 1.0000 1.0000 1,640.9100 MH/Unit Total Labor/MH Base Labor/Unit 24.0000 60.8671 730.8800 WC: 5221 Concrete Construction 202OTDPUDCIP Truckee Donner PUD CIP Cost Basis 03/16/2020 7:29 AM Page 5 of 35 Crew: LAB4 4 Man Labor Crew Resource Description 3TCMTL Traffic Control Materials 8UTLPU Utility Pickup FLAG Flagger LAB4 Labor Foreman Prod: S 1 Eff: 100.00 Crew Hrs: 8.00 Labor PCs: 3.00 Equipment PCs: 1.00 Pcs/Wste Quantity Unit Unit Cost Tax/OT % Actual UC Total 1.00 1.00 DAY 100.00 108.10 108.10 108.10 1.00 8.00 H R 9.00 100.00 9.00 72.00 2.00 16.00 MH 28.68 100.00 58.85 941.58 1.00 8.00 MH 34.00 100.00 64.90 519.23 Calendar: STD Standard Hrs/Shift: 8 WC: 5221 Concrete Construction Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT % Actual UC Total 4PAVE AC Paving 1.00 0.00 LS 13,053.21 100.00 0.00 0.00 • ' Materials • • Unit: LF Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 0.00 0.00 0.00 0.00 33.20 0.00 0.00 33.20 Total 0.00 0.00 0.00 0.00 8,298.93 0.00 0.00 8,298.93 Calendar: STD Standard Hrs/Shift: 8 WC: 5221 Concrete Construction Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT % Actual UC Total 26"H20 6" Waterline 1.00 280.00 LF 14.05 108.10 15.19 4,252.65 2BASE Base Rock 1.00 54.00 TON 9.75 108.10 10.54 569.15 2MEGALUG MJ Megalug Pack 1.00 2.00 EA 56.95 108.10 61.57 123.13 2MJFITTING MJ Fitting 1.00 1.00 EA 498.83 108.10 539.24 539.24 2PIPEACC Pipe Accessories 1.00 250.00 LF 1.60 108.10 1.73 432.40 2PIPEALLOW Misc Pipe Matt Allowance 1.00 8,546.30 LS 0.10 108.10 0.11 923.86 2SAND Bedding Sand - FOB Plant 1.00 40.00 TON 6.00 108.10 6.49 259.44 2VALVEALLOW Valve Allowance 1.00 0.50 EA 2,398.11 100.00 2,398.12 1,199.06 Biditem 8" Water Line Takeoff Qty: 250.000 LF 2 O Bid Qty: 250.000 LF Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 11.25 10.68 21.93 11.84 61.75 0.95 9.84 106.31 Total 2,812.46 2,670.12 5,482.58 2,959.05 15,437.26 237.82 2,460.00 26,576.71 Manhours Unit/MH MH/Unit $/MH Base Labor/MH Total Labor/MH Unit/CH 78.0000 3.2051 0.3120 340.7271 36.0572 70.2895 12.5000 20.1 Sawcut • •• Unit: LF Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U. cost 0.26 0.24 0.50 0.14 0.00 0.04 0.00 0.68 Total 128.98 122.03 251.01 67.52 0.00 21.62 0.00 340.15 Crew $/Unit Crew Hrs/Unit Units/Crew Hr $/Crew Hour Shifts Units/Shift Shifts/Unit $/Shift 0.6371 0.0040 250.0000 159.2650 0.2500 2,000.0000 0.0005 1,360.6000 Manhours Unit/MH MH/Unit Total Labor/MH Base Labor/Unit 4.0000 125.0000 0.0080 62.7525 0.2580 Calendar: STD Standard Hrs/Shift: 8 WC: 5221 Concrete Construction Crew: LAB4 4 Man Labor Crew Prod: S 0.25 Eff: 100.00 Crew Hrs: 2.00 Labor PCs: 2.00 Equipment Pcs: 2.00 Notes: Assume an average of 4" pavement depth. Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT % Actual UC Total 3MISCTOOL Misc Tool Allowance 1.00 2.00 HR 10.00 108.10 10.81 21.62 202OTDPUDCIP Truckee Donner PUD CIP Cost Basis 03/16/2020 7:29 AM Page 6 of 35 8231 SAW CONCRETE 20-29HP SELF PR 1.00 2.00 HR 22.90 108.10 24.76 49.52 8UTLPU Utility Pickup 1.00 2.00 HR 9.00 100.00 9.00 18.00 LAB4 Labor Foreman 1.00 2.00 MH 34.00 100.00 64.91 129.81 LABORER Laborer 1.00 2.00 MH 30.49 100.00 60.60 121.20 • • • Unit: LF Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 6.25 5.82 12.07 9.37 0.00 0.43 7.36 29.23 Total 1,562.08 1,454.52 3,016.60 2,342.39 0.00 108.10 1,840.00 7,307.09 Crew $/Unit Crew Hrs/Unit Units/Crew Hr $/Crew Hour Shifts Units/Shift Shifts/Unit $/Shift 21.4360 0.0320 31.2500 669.8738 1.0000 250.0000 0.0040 7,307.0900 Manhours Unit/MH MH/Unit Total Labor/MH Base Labor/Unit 40.0000 6.2500 0.1600 75.4150 6.2483 Calendar: STD Standard Hrs/Shift: 8 WC: 5221 Concrete Construction Crew: SMPIPE Small Pipe Crew Prod: S 1 Eff: 100.00 Crew Hrs: 8.00 Labor PCs: 5.00 Equipment PCs: 3.00 Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT % Actual UC Total 3TRAFFICPLAT Traffic Plate 1.00 2.00 EA/D 50.00 108.10 54.05 108.10 4HAUL Hauling - Sub 1.00 16.00 HR 115.00 100.00 115.00 1,840.00 8031 ROLLER 18-29" WALKBEHIND DBL 1.00 8.00 HR 37.47 108.10 40.50 324.01 8267 LOADER WHEEL 2.5-2.9 CUBIC Y 1.00 8.00 HR 103.25 108.10 111.61 892.86 8276 EXCAVATOR 35000-39999# 1.00 8.00 HR 130.15 108.10 140.69 1,125.52 LABORER Laborer 2.00 16.00 MH 30.49 100.00 60.60 969.58 OPER4 Operator Foreman 1.00 8.00 MH 48.00 100.00 89.27 714.13 OPERATOR Operator 2.00 16.00 MH 43.14 100.00 83.31 1,332.89 20.3 AC Patch Paving • ••• Unit: SF Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 0.39 0.36 0.75 0.48 2.70 0.00 0.50 4.43 Total 390.52 363.64 754.16 477.14 2,703.59 0.00 495.00 4,429.89 Crew $/Unit Crew Hrs/Unit Units/Crew Hr $/Crew Hour Shifts Units/Shift Shifts/Unit $/Shift 1.1409 0.0020 500.0000 570.4350 0.2500 4,000.0000 0.0003 17,719.5600 Manhours Unit/MH MH/Unit Total Labor/MH Base Labor/Unit 10.0000 100.0000 0.0100 75.4160 0.3905 Calendar: STD Standard Hrs/Shift: 8 WC: 5221 Concrete Construction Crew: BKFL Backfill Crew Prod: S 0.25 Eff: 100.00 Crew Hrs: 2.00 Labor PCs: 5.00 Equipment PCs: 4.00 Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT % Actual UC Total 2A ASPHALT 1.00 33.00 TON 72.00 108.10 77.83 2,568.46 2TACKCOAT Tack Coat 1.00 250.00 LF 0.50 108.10 0.54 135.13 4HAUL Hauling - Sub 1.00 33.00 TON 15.00 100.00 15.00 495.00 8034 ROLLER 41-49" VIB SINGLE DRU 1.00 2.00 HR 60.26 108.10 65.14 130.27 8243 BACKHOE/LOADER 60-90HP 4WD 1.00 2.00 HR 50.21 108.10 54.28 108.56 8324 TRUCK WATER 2000-2999 GALLON 1.00 2.00 HR 60.07 108.10 64.94 129.88 8BITCHPOT Bitch Pot 1.00 2.39 HR 35.00 108.10 37.84 90.43 8UTLPU Utility Pickup 1.00 2.00 HR 9.00 100.00 9.00 18.00 LABORER Laborer 2.00 4.00 MH 30.49 100.00 60.60 242.40 OPER4 Operator Foreman 1.00 2.00 MH 48.00 100.00 89.27 178.54 OPERATOR Operator 2.00 4.00 MH 43.14 100.00 83.31 333.22 Calendar: STD Standard Hrs/Shift: 8 WC: 5221 Concrete Construction Notes: Assume approx 50% of all trench will require re -striping 202OTDPUDCIP Truckee Donner PUD CIP Cost Basis 03/16/2020 7:29 AM Page 7 of 35 Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT % Actual UC Total 4STRIPE Striping - Sub 1.00 125.00 LF 1.00 100.00 1.00 125.00 Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 730.88 729.93 1,460.81 72.00 0.00 108.10 0.00 1,640.91 Total 730.88 729.93 1,460.81 72.00 0.00 108.10 0.00 1,640.91 Crew $/Unit Crew Hrs/Unit Units/Crew Hr $/Crew Hour Shifts Units/Shift Shifts/Unit $/Shift 1,532.8100 8.0000 0.1250 191.6013 1.0000 1.0000 1.0000 1,640.9100 Manhours Unit/MH MH/Unit Total Labor/MH Base Labor/Unit 24.0000 0.0417 24.0000 60.8671 730.8800 Calendar: STD Standard Hrs/Shift: 8 WC: 5221 Concrete Construction Crew: LAB4 4 Man Labor Crew Prod: S 1 Eff: 100.00 Crew Hrs: 8.00 Labor PCs: 3.00 Equipment PCs: 1.00 Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT % Actual UC Total 3TCMTL Traffic Control Materials 1.00 1.00 DAY 100.00 108.10 108.10 108.10 8UTLPU Utility Pickup 1.00 8.00 HR 9.00 100.00 9.00 72.00 FLAG Flagger 2.00 16.00 MH 28.68 100.00 58.85 941.58 LAB4 Labor Foreman 1.00 8.00 MH 34.00 100.00 64.90 519.23 20.6 Street ReconstructionQuantity: Calendar: STD Standard Hrs/Shift: 8 WC: 5221 Concrete Construction Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT % Actual UC Total 4PAVE AC Paving 1.00 0.00 LS 13,053.21 100.00 0.00 0.00 Base Labor Burden Total Labor Equipment U.Cost 0.00 0.00 0.00 0.00 Total 0.00 0.00 0.00 0.00 Calendar: STD Standard Hrs/Shift: 8 Resource Description Pcs/Wste Quantity Unit 28"H20 8" Water Line 1.00 280.00 LF 2BASE Base Rock 1.00 72.00 TON 2MEGALUG MJ Megalug Pack 1.00 2.00 EA 2MJFITTING MJ Fitting 1.00 1.00 EA 2PIPEACC Pipe Accessories 1.00 250.00 LF 2PIPEALLOW Misc Pipe Matt Allowance 1.00 12,950.26 LS 2SAND Bedding Sand - FOB Plant 1.00 42.00 TON 2VALVEALLOW Valve Allowance 1.00 0.50 EA Biditem 10" Water Line Takeoff Qty: 3 O Bid Qty: Base Labor Burden Total Labor U.Cost 12.23 11.61 23.84 Total 2,812.46 2,670.12 5,482.58 Manhours Unit/MH MH/Unit 78.0000 2.9487 0.3391 Perm Matls Const Matls Sub 50.93 0.00 0.00 12,733.67 0.00 0.00 WC: 5221 Concrete Construction Unit Cost Tax/OT % Actual UC 24.13 108.10 26.08 9.75 108.10 10.54 69.36 108.10 74.98 740.00 108.10 799.94 1.60 108.10 1.73 0.10 108.10 0.11 6.00 108.10 6.49 3,233.02 100.00 3,233.02 230.000 LF 230.000 LF Equipment Perm Matls Const Matls 12.83 87.08 1.03 2,951.48 20,027.90 237.82 $/MH Base Labor/MH 398.7792 36.0572 Sub 10.46 2,405.00 Total Labor/MH 70.2895 Total 50.93 12,733.67 Total 7,303.67 758.86 149.96 799.94 432.40 1,399.92 272.41 1,616.51 Total 135.24 31,104.78 Unit/CH 11.5000 Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total 202OTDPUDCIP Truckee Donner PUD CIP Cost Basis 03/16/2020 7:29 AM Page 8 of 35 U. Cost 0.28 0.27 0.55 Total 128.98 122.03 251.01 Crew $/Unit Crew Hrs/Unit Units/Crew Hr 0.6925 0.0043 230.0000 Manhours Unit/MH 4.0000 115.0000 Calendar: STD Standard Hrs/Shift: 8 Crew: LAB4 4 Man Labor Crew Prod: S 0.25 Notes: Assume an average of 4" pavement depth. 0.15 0.00 67.52 0.00 $/Crew Hour Shifts 159.2650 0.2500 MH/Unit 0.0087 WC: 5221 Eff: 100.00 Crew Hrs: 2.00 0.05 0.00 0.74 21.62 0.00 340.15 Units/Shift Shifts/Unit $/Shift 1,840.0000 0.0005 1,360.6000 Total Labor/MH Base Labor/Unit 62.7525 0.2804 Concrete Construction Labor PCs: 2.00 Equipment PCs: 2.00 Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT % Actual UC Total 3MISCTOOL Misc Tool Allowance 1.00 2.00 HR 10.00 108.10 10.81 21.62 8231 SAW CONCRETE 20-29HP SELF PR 1.00 2.00 H R 22.90 108.10 24.76 49.52 8UTLPU Utility Pickup 1.00 2.00 HR 9.00 100.00 9.00 18.00 LAB4 Labor Foreman 1.00 2.00 MH 34.00 100.00 64.91 129.81 LABORER Laborer 1.00 2.00 MH 30.49 100.00 60.60 121.20 • • • Unit: LF Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 6.79 6.32 13.12 10.18 0.00 0.47 8.00 31.77 Total 1,562.08 1,454.52 3,016.60 2,342.39 0.00 108.10 1,840.00 7,307.09 Crew $/Unit Crew Hrs/Unit Units/Crew Hr $/Crew Hour Shifts Units/Shift Shifts/Unit $/Shift 23.3000 0.0348 28.7500 669.8738 1.0000 230.0000 0.0043 7,307.0900 Manhours Unit/MH MH/Unit Total Labor/MH Base Labor/Unit 40.0000 5.7500 0.1739 75.4150 6.7917 Calendar: STD Standard Hrs/Shift: 8 WC: 5221 Concrete Construction Crew: SMPIPE Small Pipe Crew Prod: S 1 Eff: 100.00 Crew Hrs: 8.00 Labor PCs: 5.00 Equipment PCs: 3.00 Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT % Actual UC Total 3TRAFFICPLAT Traffic Plate 1.00 2.00 EA/D 50.00 108.10 54.05 108.10 4HAUL Hauling - Sub 1.00 16.00 HR 115.00 100.00 115.00 1,840.00 8031 ROLLER 18-29" WALKBEHIND DBL 1.00 8.00 HR 37.47 108.10 40.50 324.01 8267 LOADER WHEEL 2.5-2.9 CUBIC Y 1.00 8.00 HR 103.25 108.10 111.61 892.86 8276 EXCAVATOR 35000-39999# 1.00 8.00 HR 130.15 108.10 140.69 1,125.52 LABORER Laborer 2.00 16.00 MH 30.49 100.00 60.60 969.58 OPER4 Operator Foreman 1.00 8.00 MH 48.00 100.00 89.27 714.13 OPERATOR Operator 2.00 16.00 MH 43.14 100.00 83.31 1,332.89 30.3 AC Patch Paving • • Unit: SIF Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 0.42 0.40 0.82 0.51 2.81 0.00 0.49 4.63 Total 390.52 363.64 754.16 469.57 2,583.59 0.00 450.00 4,257.32 Crew $/Unit Crew Hrs/Unit Units/Crew Hr $/Crew Hour Shifts Units/Shift Shifts/Unit $/Shift 1.2401 0.0022 460.0000 570.4350 0.2500 3,680.0000 0.0003 17,029.2800 Manhours Unit/MH MH/Unit Total Labor/MH Base Labor/Unit 10.0000 92.0000 0.0109 75.4160 0.4245 Calendar: STD Standard Hrs/Shift: 8 WC: 5221 Concrete Construction Crew: BKFL Backfill Crew Prod: S 0.25 Eff: 100.00 Crew Hrs: 2.00 Labor PCs: 5.00 Equipment Pcs: 4.00 Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT % Actual UC Total 2A ASPHALT 1.00 30.00 TON 72.00 108.10 77.83 2,334.96 2TACKCOAT Tack Coat 1.00 460.00 LF 0.50 108.10 0.54 248.63 202OTDPUDCIP Truckee Donner PUD CIP Cost Basis 03/16/2020 7:29 AM Page 9 of 35 4HAUL Hauling - Sub 1.00 30.00 TON 15.00 100.00 15.00 450.00 8034 ROLLER 41-49" VIB SINGLE DRU 1.00 2.00 HR 60.26 108.10 65.14 130.27 8243 BACKHOE/LOADER 60-90HP 4WD 1.00 2.00 HR 50.21 108.10 54.28 108.56 8324 TRUCK WATER 2000-2999 GALLON 1.00 2.00 HR 60.07 108.10 64.94 129.88 8BITCHPOT Bitch Pot 1.00 2.19 HR 35.00 108.10 37.84 82.86 8UTLPU Utility Pickup 1.00 2.00 HR 9.00 100.00 9.00 18.00 LABORER Laborer 2.00 4.00 MH 30.49 100.00 60.60 242.40 OPER4 Operator Foreman 1.00 2.00 MH 48.00 100.00 89.27 178.54 OPERATOR Operator 2.00 4.00 MH 43.14 100.00 83.31 333.22 Calendar: STD Standard Hrs/Shift: 8 Notes: Assume approx 50% of all trench will require re -striping Resource Description Pcs/Wste Quantity Unit 4STRIPE Striping - Sub 1.00 115.00 LF WC: 5221 Concrete Construction Unit Cost Tax/OT % Actual UC Total 1.00 100.00 1.00 115.00 Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 730.88 729.93 1,460.81 72.00 0.00 108.10 0.00 1,640.91 Total 730.88 729.93 1,460.81 72.00 0.00 108.10 0.00 1,640.91 Crew $/Unit Crew Hrs/Unit Units/Crew Hr $/Crew Hour Shifts Units/Shift Shifts/Unit $/Shift 1,532.8100 8.0000 0.1250 191.6013 1.0000 1.0000 1.0000 1,640.9100 Manhours Unit/MH MH/Unit Total Labor/MH Base Labor/Unit 24.0000 0.0417 24.0000 60.8671 730.8800 Calendar: STD Standard Hrs/Shift: 8 WC: 5221 Concrete Construction Crew: LAB4 4 Man Labor Crew Prod: S 1 Eff: 100.00 Crew Hrs: 8.00 Labor PCs: 3.00 Equipment PCs: 1.00 Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT % Actual UC Total 3TCMTL Traffic Control Materials 1.00 1.00 DAY 100.00 108.10 108.10 108.10 8UTLPU Utility Pickup 1.00 8.00 HR 9.00 100.00 9.00 72.00 FLAG Flagger 2.00 16.00 MH 28.68 100.00 58.85 941.58 LAB4 Labor Foreman 1.00 8.00 MH 34.00 100.00 64.90 519.23 30.6 StreetReconstruction Quantity: 1 Unit: LS Calendar: STD Standard Hrs/Shift: 8 WC: 5221 Concrete Construction Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT % Actual UC Total 4PAVE AC Paving 1.00 0.00 LS 13,053.21 100.00 0.00 0.00 • ' Materials • • Unit: LF Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 0.00 0.00 0.00 0.00 75.84 0.00 0.00 75.84 Total 0.00 0.00 0.00 0.00 17,444.31 0.00 0.00 17,444.31 Calendar: STD Standard Hrs/Shift: 8 WC: 5221 Concrete Construction Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT % Actual UC Total 210"H20 10" Water Line 1.00 260.00 LF 36.70 108.10 39.67 10,314.90 2BASE Base Rock 1.00 60.00 TON 9.75 108.10 10.54 632.39 2MEGALUG MJ Megalug Pack 1.00 2.00 EA 166.90 108.10 180.42 360.84 2MJFITTING MJ Fitting 1.00 1.00 EA 1,441.18 108.10 1,557.92 1,557.92 2PIPEACC Pipe Accessories 1.00 230.00 LF 1.60 108.10 1.73 397.81 2PIPEALLOW Misc Pipe Matt Allowance 1.00 17,567.27 LS 0.10 108.10 0.11 1,899.02 2SAND Bedding Sand - FOB Plant 1.00 40.00 TON 6.00 108.10 6.49 259.44 2VALVEALLOW Valve Allowance 1.00 0.50 EA 4,043.97 100.00 4,043.98 2,021.99 202OTDPUDCIP Truckee Donner PUD CIP Cost Basis 03/16/2020 7:29 AM Page 10 of 35 Biditem 12" Water Line Takeoff Qty: 230.000 LF 40 Bid Qty: 230.000 LF Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 12.23 11.61 23.84 12.83 113.69 1.03 14.46 165.85 Total 2,812.46 2,670.12 5,482.58 2,951.48 26,148.03 237.82 3,325.00 38,144.91 Manhours Unit/MH MH/Unit $/MH Base Labor/MH Total Labor/MH Unit/CH 78.0000 2.9487 0.3391 489.0373 36.0572 70.2895 11.5000 40.1 Sawcut • .• Unit: LF Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U. cost 0.28 0.27 0.55 0.15 0.00 0.05 0.00 0.74 Total 128.98 122.03 251.01 67.52 0.00 21.62 0.00 340.15 Crew $/Unit Crew Hrs/Unit Units/Crew Hr $/Crew Hour Shifts Units/Shift Shifts/Unit $/Shift 0.6925 0.0043 230.0000 159.2650 0.2500 1,840.0000 0.0005 1,360.6000 Manhours Unit/MH MH/Unit Total Labor/MH Base Labor/Unit 4.0000 115.0000 0.0087 62.7525 0.2804 Calendar: STD Standard Hrs/Shift: 8 WC: 5221 Concrete Construction Crew: LAB4 4 Man Labor Crew Prod: S 0.25 Eff: 100.00 Crew Hrs: 2.00 Labor PCs: 2.00 Equipment PCs: 2.00 Notes: Assume an average of 4" pavement depth. Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT % Actual UC Total 3MISCTOOL Misc Tool Allowance 1.00 2.00 HR 10.00 108.10 10.81 21.62 8231 SAW CONCRETE 20-29HP SELF PR 1.00 2.00 H R 22.90 108.10 24.76 49.52 8UTLPU Utility Pickup 1.00 2.00 HR 9.00 100.00 9.00 18.00 LAB4 Labor Foreman 1.00 2.00 MH 34.00 100.00 64.91 129.81 LABORER Laborer 1.00 2.00 MH 30.49 100.00 60.60 121.20 • • • Unit: LF Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 6.79 6.32 13.12 10.18 0.00 0.47 12.00 35.77 Total 1,562.08 1,454.52 3,016.60 2,342.39 0.00 108.10 2,760.00 8,227.09 Crew $/Unit Crew Hrs/Unit Units/Crew Hr $/Crew Hour Shifts Units/Shift Shifts/Unit $/Shift 23.3000 0.0348 28.7500 669.8738 1.0000 230.0000 0.0043 8,227.0900 Manhours Unit/MH MH/Unit Total Labor/MH Base Labor/Unit 40.0000 5.7500 0.1739 75.4150 6.7917 Calendar: STD Standard Hrs/Shift: 8 WC: 5221 Concrete Construction Crew: SMPIPE Small Pipe Crew Prod: S 1 Eff: 100.00 Crew Hrs: 8.00 Labor PCs: 5.00 Equipment PCs: 3.00 Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT % Actual UC Total 3TRAFFICPLAT Traffic Plate 1.00 2.00 EA/D 50.00 108.10 54.05 108.10 4HAUL Hauling - Sub 1.00 24.00 HR 115.00 100.00 115.00 2,760.00 8031 ROLLER 18-29" WALKBEHIND DBL 1.00 8.00 HR 37.47 108.10 40.50 324.01 8267 LOADER WHEEL 2.5-2.9 CUBIC Y 1.00 8.00 HR 103.25 108.10 111.61 892.86 8276 EXCAVATOR 35000-39999# 1.00 8.00 HR 130.15 108.10 140.69 1,125.52 LABORER Laborer 2.00 16.00 MH 30.49 100.00 60.60 969.58 OPER4 Operator Foreman 1.00 8.00 MH 48.00 100.00 89.27 714.13 OPERATOR Operator 2.00 16.00 MH 43.14 100.00 83.31 1,332.89 40.3 AC Patch Paving • • Unit: SF Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total 2020TDPUDCIP Truckee Donner PUD CIP Cost Basis 03/16/2020 7:29 AM Page 11 of 35 U.Cost 0.42 0.40 0.82 0.51 2.81 0.00 0.49 4.63 Total 390.52 363.64 754.16 469.57 2,583.59 0.00 450.00 4,257.32 Crew $/Unit Crew Hrs/Unit Units/Crew Hr $/Crew Hour Shifts Units/Shift Shifts/Unit $/Shift 1.2401 0.0022 460.0000 570.4350 0.2500 3,680.0000 0.0003 17,029.2800 Manhours Unit/MH MH/Unit Total Labor/MH Base Labor/Unit 10.0000 92.0000 0.0109 75.4160 0.4245 Calendar: STD Standard Hrs/Shift: 8 WC: 5221 Concrete Construction Crew: BKFL Backfill Crew Prod: S 0.25 Eff: 100.00 Crew Hrs: 2.00 Labor PCs: 5.00 Equipment PCs: 4.00 Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT % Actual UC Total 2A ASPHALT 1.00 30.00 TON 72.00 108.10 77.83 2,334.96 2TACKCOAT Tack Coat 1.00 460.00 LF 0.50 108.10 0.54 248.63 4HAUL Hauling - Sub 1.00 30.00 TON 15.00 100.00 15.00 450.00 8034 ROLLER 41-49" VIB SINGLE DRU 1.00 2.00 HR 60.26 108.10 65.14 130.27 8243 BACKHOE/LOADER 60-90HP 4WD 1.00 2.00 HR 50.21 108.10 54.28 108.56 8324 TRUCK WATER 2000-2999 GALLON 1.00 2.00 HR 60.07 108.10 64.94 129.88 8BITCHPOT Bitch Pot 1.00 2.19 HR 35.00 108.10 37.84 82.86 8UTLPU Utility Pickup 1.00 2.00 HR 9.00 100.00 9.00 18.00 LABORER Laborer 2.00 4.00 MH 30.49 100.00 60.60 242.40 OPER4 Operator Foreman 1.00 2.00 MH 48.00 100.00 89.27 178.54 OPERATOR Operator 2.00 4.00 MH 43.14 100.00 83.31 333.22 Calendar: STD Standard Hrs/Shift: 8 Notes: Assume approx 50% of all trench will require re -striping Resource Description Pcs/Wste Quantity Unit 4STRIPE Striping - Sub 1.00 115.00 LF WC: 5221 Concrete Construction Unit Cost Tax/OT % Actual UC Total 1.00 100.00 1.00 115.00 Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 730.88 729.93 1,460.81 72.00 0.00 108.10 0.00 1,640.91 Total 730.88 729.93 1,460.81 72.00 0.00 108.10 0.00 1,640.91 Crew $/Unit Crew Hrs/Unit Units/Crew Hr $/Crew Hour Shifts Units/Shift Shifts/Unit $/Shift 1,532.8100 8.0000 0.1250 191.6013 1.0000 1.0000 1.0000 1,640.9100 Manhours Unit/MH MH/Unit Total Labor/MH Base Labor/Unit 24.0000 0.0417 24.0000 60.8671 730.8800 Calendar: STD Standard Hrs/Shift: 8 WC: 5221 Concrete Construction Crew: LAB4 4 Man Labor Crew Prod: S 1 Eff: 100.00 Crew Hrs: 8.00 Labor PCs: 3.00 Equipment PCs: 1.00 Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT % Actual UC Total 3TCMTL Traffic Control Materials 1.00 1.00 DAY 100.00 108.10 108.10 108.10 8UTLPU Utility Pickup 1.00 8.00 HR 9.00 100.00 9.00 72.00 FLAG Flagger 2.00 16.00 MH 28.68 100.00 58.85 941.58 LAB4 Labor Foreman 1.00 8.00 MH 34.00 100.00 64.90 519.23 40.6 StreetReconstruction Quantity: 1 Unit: LS Calendar: STD Standard Hrs/Shift: 8 WC: 5221 Concrete Construction Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT % Actual UC Total 4PAVE AC Paving 1.00 0.00 LS 13,053.21 100.00 0.00 0.00 Activity: 40.9 Materials Quantity: 230 Unit: LF Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total 2O2OTDPUDCIP Truckee Donner PUD CIP Cost Basis 03/16/2020 7:29 AM Page 12 of 35 U. Cost 0.00 0.00 0.00 0.00 102.45 0.00 0.00 102.45 Total 0.00 0.00 0.00 0.00 23,564.44 0.00 0.00 23,564.44 Calendar: STD Standard Hrs/Shift: 8 WC: 5221 Concrete Construction Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT % Actual UC Total 212"H20 12" Water Line 1.00 260.00 LF 51.87 108.10 56.07 14,578.58 2BASE Base Rock 1.00 60.00 TON 9.75 108.10 10.54 632.39 2MEGALUG MJ Megalug Pack 1.00 2.00 EA 115.82 108.10 125.20 250.40 2MJFITTIN G MJ Fitting 1.00 1.00 EA 1,935.30 108.10 2,092.06 2,092.06 2PIPEACC Pipe Accessories 1.00 230.00 LF 2.20 108.10 2.38 546.99 2PIPEALLOW Misc Pipe Matt Allowance 1.00 23,574.84 LS 0.10 108.10 0.11 2,548.44 2SAND Bedding Sand - FOB Plant 1.00 55.00 TON 6.00 108.10 6.49 356.73 2VALVEALLOW Valve Allowance 1.00 0.50 EA 4,734.22 108.10 5,117.70 2,558.85 Biditem 50 Base Labor U. Cost 12.78 Total 2,812.46 Manhours 78.0000 14" Water Line Takeoff Qty: Bid Qty: Burden Total Labor 12.14 24.92 2,670.12 5,482.58 Unit/MH MH/Unit 2.8205 0.3545 220.000 LF 220.000 LF Equipment Perm Matls Const Matls Sub Total 13.38 140.24 1.08 11.32 190.94 2,944.29 30,851.99 237.82 2,490.00 42,006.68 $/MH Base Labor/MH Total Labor/MH Unit/CH 538.5472 36.0572 70.2895 11.0000 Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U. Cost 0.29 0.28 0.57 0.15 0.00 0.05 0.00 0.77 Total 128.98 122.03 251.01 67.52 0.00 21.62 0.00 340.15 Crew $/Unit Crew Hrs/Unit Units/Crew Hr $/Crew Hour Shifts Units/Shift Shifts/Unit $/Shift 0.7239 0.0045 220.0000 159.2650 0.2500 1,760.0000 0.0006 1,360.6000 Manhours Unit/MH MH/Unit Total Labor/MH Base Labor/Unit 4.0000 110.0000 0.0091 62.7525 0.2931 Calendar: STD Standard Hrs/Shift: 8 WC: 5221 Concrete Construction Crew: LAB4 4 Man Labor Crew Prod: S 0.25 Eff: 100.00 Crew Hrs: 2.00 Labor PCs: 2.00 Equipment PCs: 2.00 Notes: Assume an average of 4" pavement depth. Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT % Actual UC Total 3MISCTOOL Misc Tool Allowance 1.00 2.00 HR 10.00 108.10 10.81 21.62 8231 SAW CONCRETE 20-29HP SELF PR 1.00 2.00 HR 22.90 108.10 24.76 49.52 8UTLPU Utility Pickup 1.00 2.00 HR 9.00 100.00 9.00 18.00 LAB4 Labor Foreman 1.00 2.00 MH 34.00 100.00 64.91 129.81 LABORER Laborer 1.00 2.00 MH 30.49 100.00 60.60 121.20 • • • Unit: LF Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U. Cost 7.10 6.61 13.71 10.65 0.00 0.49 8.36 33.21 Total 1,562.08 1,454.52 3,016.60 2,342.39 0.00 108.10 1,840.00 7,307.09 Crew $/Unit Crew Hrs/Unit Units/Crew Hr $/Crew Hour Shifts Units/Shift Shifts/Unit $/Shift 24.3590 0.0364 27.5000 669.8738 1.0000 220.0000 0.0045 7,307.0900 Manhours Unit/MH MH/Unit Total Labor/MH Base Labor/Unit 40.0000 5.5000 0.1818 75.4150 7.1004 Calendar: STD Standard Hrs/Shift: 8 WC: 5221 Concrete Construction 202OTDPUDCIP Truckee Donner PUD CIP Cost Basis 03/16/2020 7:29 AM Page 13 of 35 Crew: SMPIPE Small Pipe Crew Prod: S 1 Eff: 100.00 Crew Hrs: 8.00 Labor PCs: 5.00 Equipment PCs: 3.00 Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT % Actual UC Total 3TRAFFICPLAT Traffic Plate 1.00 2.00 EA/D 50.00 108.10 54.05 108.10 4HAUL Hauling - Sub 1.00 16.00 HR 115.00 100.00 115.00 1,840.00 8031 ROLLER 18-29" WALKBEHIND DBL 1.00 8.00 HR 37.47 108.10 40.50 324.01 8267 LOADER WHEEL 2.5-2.9 CUBIC Y 1.00 8.00 HR 103.25 108.10 111.61 892.86 8276 EXCAVATOR 35000-39999# 1.00 8.00 HR 130.15 108.10 140.69 1,125.52 LABORER Laborer 2.00 16.00 MH 30.49 100.00 60.60 969.58 OPER4 Operator Foreman 1.00 8.00 MH 48.00 100.00 89.27 714.13 OPERATOR Operator 2.00 16.00 MH 43.14 100.00 83.31 1,332.89 Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 0.36 0.33 0.69 0.42 2.76 0.00 0.49 4.36 Total 390.52 363.64 754.16 462.38 3,039.77 0.00 540.00 4,796.31 Crew $/Unit Crew Hrs/Unit Units/Crew Hr $/Crew Hour Shifts Units/Shift Shifts/Unit $/Shift 1.0372 0.0018 550.0000 570.4350 0.2500 4,400.0000 0.0002 19,185.2400 Manhours Unit/MH MH/Unit Total Labor/MH Base Labor/Unit 10.0000 110.0000 0.0091 75.4160 0.3550 Calendar: STD Standard Hrs/Shift: 8 WC: 5221 Concrete Construction Crew: BKFL Backfill Crew Prod: S 0.25 Eff: 100.00 Crew Hrs: 2.00 Labor PCs: 5.00 Equipment PCs: 4.00 Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT % Actual UC Total 2A ASPHALT 1.00 36.00 TON 72.00 108.10 77.83 2,801.95 2TACKCOAT Tack Coat 1.00 440.00 LF 0.50 108.10 0.54 237.82 4HAUL Hauling - Sub 1.00 36.00 TON 15.00 100.00 15.00 540.00 8034 ROLLER 41-49" VIB SINGLE DRU 1.00 2.00 HR 60.26 108.10 65.14 130.27 8243 BACKHOE/LOADER 60-90HP 4WD 1.00 2.00 HR 50.21 108.10 54.28 108.56 8324 TRUCK WATER 2000-2999 GALLON 1.00 2.00 HR 60.07 108.10 64.94 129.88 8BITCHPOT Bitch Pot 1.00 2.00 HR 35.00 108.10 37.84 75.67 8UTLPU Utility Pickup 1.00 2.00 HR 9.00 100.00 9.00 18.00 LABORER Laborer 2.00 4.00 MH 30.49 100.00 60.60 242.40 OPER4 Operator Foreman 1.00 2.00 MH 48.00 100.00 89.27 178.54 OPERATOR Operator 2.00 4.00 MH 43.14 100.00 83.31 333.22 50.4 StripingQuantity: 1 Unit: LS Calendar: STD Standard Hrs/Shift: 8 WC: 5221 Concrete Construction Notes: Assume approx 50% of all trench will require re -striping Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT % Actual UC Total 4STRIPE Striping - Sub 1.00 110.00 LF 1.00 100.00 1.00 110.00 50.5 Traffic Control Quantity: 1 Unit: LS Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 730.88 729.93 1,460.81 72.00 0.00 108.10 0.00 1,640.91 Total 730.88 729.93 1,460.81 72.00 0.00 108.10 0.00 1,640.91 Crew $/Unit Crew Hrs/Unit Units/Crew Hr $/Crew Hour Shifts Units/Shift Shifts/Unit $/Shift 1,532.8100 8.0000 0.1250 191.6013 1.0000 1.0000 1.0000 1,640.9100 Manhours Unit/MH MH/Unit Total Labor/MH Base Labor/Unit 24.0000 0.0417 24.0000 60.8671 730.8800 Calendar: STD Standard Hrs/Shift: 8 WC: 5221 Concrete Construction Crew: LAB4 4 Man Labor Crew Prod: S 1 Eff: 100.00 Crew Hrs: 8.00 Labor Pcs: 3.00 Equipment PCs: 1.00 2O2OTDPUDCIP Truckee Donner PUD CIP Cost Basis 03/16/2020 7:29 AM Page 14 of 35 Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT % Actual UC Total 3TCMTL Traffic Control Materials 1.00 1.00 DAY 100.00 108.10 108.10 108.10 8UTLPU Utility Pickup 1.00 8.00 HR 9.00 100.00 9.00 72.00 FLAG Flagger 2.00 16.00 MH 28.68 100.00 58.85 941.58 LAB4 Labor Foreman 1.00 8.00 MH 34.00 100.00 64.90 519.23 50.6 StreetReconstruction Quantity: Calendar: STD Standard Hrs/Shift: 8 WC: 5221 Concrete Construction Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT % Actual UC Total 4PAVE AC Paving 1.00 0.00 LS 13,053.21 100.00 0.00 0.00 • ' Materials • • Unit: LF Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 0.00 0.00 0.00 0.00 126.42 0.00 0.00 126.42 Total 0.00 0.00 0.00 0.00 27,812.22 0.00 0.00 27,812.22 Calendar: STD Standard Hrs/Shift: 8 WC: 5221 Concrete Construction Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT % Actual UC Total 214"H20 14" Water Line 1.00 240.00 LF 67.43 108.10 72.89 17,494.04 2BASE Base Rock 1.00 60.00 TON 9.75 108.10 10.54 632.39 2MEGALUG MJ Megalug Pack 1.00 2.00 EA 166.90 108.10 180.42 360.84 2MJFITTING MJ Fitting 1.00 1.00 EA 2,500.00 108.10 2,702.50 2,702.50 2PIPEACC Pipe Accessories 1.00 220.00 LF 2.20 108.10 2.38 523.20 2PIPEALLOW Misc Pipe Matt Allowance 1.00 27,573.82 LS 0.10 108.10 0.11 2,980.73 2SAND Bedding Sand - FOB Plant 1.00 58.00 TON 6.00 108.10 6.49 376.19 2VALVEALLOW Valve Allowance 1.00 0.50 EA 5,484.66 100.00 5,484.66 2,742.33 Biditem 16" Water Line Takeoff Qty: 200.000 LF 60 Bid Qty: 200.000 LF Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 13.93 13.23 27.16 15.17 191.55 1.01 9.55 244.45 Total 2,786.66 2,645.70 5,432.36 3,034.92 38,309.86 202.69 1,909.45 48,889.28 Manhours Unit/MH MH/Unit $/MH Base Labor/MH Total Labor/MH Unit/CH 77.2000 2.5907 0.3860 633.2808 36.0966 70.3674 10.2041 60.1 Sawcut • •• Unit: LF Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U. Cost 0.26 0.24 0.50 0.14 0.00 0.04 0.00 0.68 Total 103.18 97.61 200.79 54.01 0.00 17.30 0.00 272.10 Crew $/Unit Crew Hrs/Unit Units/Crew Hr $/Crew Hour Shifts Units/Shift Shifts/Unit $/Shift 0.6370 0.0040 250.0000 159.2500 0.2000 2,000.0000 0.0005 1,360.5000 Manhours Unit/MH MH/Unit Total Labor/MH Base Labor/Unit 3.2000 125.0000 0.0080 62.7469 0.2580 Calendar: STD Standard Hrs/Shift: 8 WC: 5221 Concrete Construction Crew: LAB4 4 Man Labor Crew Prod: S 0.2 Eff: 100.00 Crew Hrs: 1.60 Labor PCs: 2.00 Equipment Pcs: 2.00 Notes: Assume an average of 4" pavement depth. Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT % Actual UC Total 3MISCTOOL Misc Tool Allowance 1.00 1.60 HR 10.00 108.10 10.81 17.30 8231 SAW CONCRETE 20-29HP SELF PR 1.00 1.60 HR 22.90 108.10 24.76 39.61 8UTLPU Utility Pickup 1.00 1.60 HR 9.00 100.00 9.00 14.40 202OTDPUDCIP Truckee Donner PUD CIP Cost Basis 03/16/2020 7:29 AM Page 15 of 35 LAB4 Labor Foreman LABORER Laborer 1.00 1.60 MH 34.00 100.00 64.90 103.84 1.00 1.60 MH 30.49 100.00 60.59 96.95 Base Labor Burden Total Labor U. cost 7.81 7.27 15.08 Total 1,562.08 1,454.52 3,016.60 Crew $/Unit Crew Hrs/Unit Units/Crew Hr 27.3157 0.0400 25.0000 Manhours Unit/MH 40.0000 5.0000 Calendar: STD Standard Hrs/Shift: 8 Crew: sMPIPE Small Pipe Crew Prod: S 1 Resource Description Pcs/Wste 3TRAFFICPLAT Traffic Plate 1.00 4HAUL Hauling - Sub 1.00 8031 ROLLER 18-29" WALKBEHIND DBL 1.00 8267 LOADER WHEEL 2.5-2.9 CUBIC Y 1.00 8277 EXCAVATOR 40000-42999# 1.00 LABORER Laborer 2.00 OPER4 Operator Foreman 1.00 OPERATOR Operator 2.00 .• AC Patch Paving .3 Base Labor Burden Total Labor U. Cost 0.39 0.36 0.75 Total 390.52 363.64 754.16 Crew $/Unit Crew Hrs/Unit Units/Crew Hr 1.1409 0.0020 500.0000 Manhours Unit/MH 10.0000 100.0000 Calendar: STD Standard Hrs/Shift: 8 Crew: BKFL Backfill Crew Prod: S 0.25 Resource Description Pcs/Wste 2A ASPHALT 1.00 2TACKCOAT Tack Coat 1.00 4HAUL Hauling - Sub 1.00 8034 ROLLER 41-49" VIB SINGLE DRU 1.00 8243 BACKHOE/LOADER 60-90HP 4WD 1.00 8324 TRUCK WATER 2000-2999 GALLON 1.00 8BITCHPOT Bitch Pot 1.00 8UTLPU Utility Pickup 1.00 LABORER Laborer 2.00 OPER4 Operator Foreman 1.00 OPERATOR Operator 2.00 Equipment Perm Matls Const Matls Sub Total 12.23 0.00 0.39 6.57 34.27 2,446.53 0.00 77.29 1,314.45 6,854.87 $/Crew Hour Shifts Units/Shift Shifts/Unit $/Shift 682.8913 1.0000 200.0000 0.0050 6,854.8700 MH/Unit Total Labor/MH Base Labor/Unit 0.2000 75.4150 7.8104 WC: 5221 Concrete Construction Eff: 100.00 Crew Hrs: 8.00 Labor PCs: 5.00 Equipment PCs: 3.00 Quantity Unit Unit Cost Tax/OT % Actual UC Total 1.43 EA/D 50.00 108.10 54.05 77.29 11.43 HR 115.00 100.00 115.00 1,314.45 8.00 HR 37.47 108.10 40.50 324.01 8.00 HR 103.25 108.10 111.61 892.86 8.00 HR 142.19 108.10 153.71 1,229.66 16.00 MH 30.49 100.00 60.60 969.58 8.00 MH 48.00 100.00 89.27 714.13 16.00 MH 43.14 100.00 83.31 1,332.89 • ••• Unit: SF Equipment Perm Matls Const Matls Sub Total 0.46 2.78 0.00 0.50 4.50 462.38 2,784.66 0.00 495.00 4,496.20 $/Crew Hour Shifts Units/Shift Shifts/Unit $/Shift 570.4350 0.2500 4,000.0000 0.0003 17,984.8000 MH/Unit Total Labor/MH Base Labor/Unit 0.0100 75.4160 0.3905 WC: 5221 Concrete Construction Eff: 100.00 Crew Hrs: 2.00 Labor PCs: 5.00 Equipment PCs: 4.00 Quantity Unit Unit Cost Tax/OT % Actual UC Total 33.00 TON 72.00 108.10 77.83 2,568.46 400.00 LF 0.50 108.10 0.54 216.20 33.00 TON 15.00 100.00 15.00 495.00 2.00 HR 60.26 108.10 65.14 130.27 2.00 HR 50.21 108.10 54.28 108.56 2.00 HR 60.07 108.10 64.94 129.88 2.00 HR 35.00 108.10 37.84 75.67 2.00 HR 9.00 100.00 9.00 18.00 4.00 MH 30.49 100.00 60.60 242.40 2.00 MH 48.00 100.00 89.27 178.54 4.00 MH 43.14 100.00 83.31 333.22 Calendar: STD Standard Hrs/Shift: 8 Notes: Assume approx 50% of all trench will require re -striping Resource Description Pcs/Wste Quantity Unit 4STRIPE Striping - Sub 1.00 100.00 LF WC: 5221 Concrete Construction Unit Cost Tax/OT % Actual UC Total 1.00 100.00 1.00 100.00 202OTDPUDCIP Truckee Donner PUD CIP Cost Basis 03/16/2020 7:29 AM Page 16 of 35 Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 730.88 729.93 1,460.81 72.00 0.00 108.10 0.00 1,640.91 Total 730.88 729.93 1,460.81 72.00 0.00 108.10 0.00 1,640.91 Crew $/Unit Crew Hrs/Unit Units/Crew Hr $/Crew Hour Shifts Units/Shift Shifts/Unit $/Shift 1,532.8100 8.0000 0.1250 191.6013 1.0000 1.0000 1.0000 1,640.9100 Manhours Unit/MH MH/Unit Total Labor/MH Base Labor/Unit 24.0000 0.0417 24.0000 60.8671 730.8800 Calendar: STD Standard Hrs/Shift: 8 WC: 5221 Concrete Construction Crew: LAB4 4 Man Labor Crew Prod: S 1 Eff: 100.00 Crew Hrs: 8.00 Labor PCs: 3.00 Equipment PCs: 1.00 Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT % Actual UC Total 3TCMTL Traffic Control Materials 1.00 1.00 DAY 100.00 108.10 108.10 108.10 8UTLPU Utility Pickup 1.00 8.00 FIR 9.00 100.00 9.00 72.00 FLAG Flagger 2.00 16.00 MH 28.68 100.00 58.85 941.58 LAB4 Labor Foreman 1.00 8.00 MH 34.00 100.00 64.90 519.23 60.6 Street ReconstructionQuantity: Calendar: STD Standard Hrs/Shift: 8 WC: 5221 Concrete Construction Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT % Actual UC Total 4PAVE AC Paving 1.00 0.00 LS 13,053.21 100.00 0.00 0.00 Base Labor Burden Total Labor Equipment U.Cost 0.00 0.00 0.00 0.00 Total 0.00 0.00 0.00 0.00 Calendar: STD Standard Hrs/Shift: 8 Resource Description Pcs/Wste Quantity Unit 216"H20 16" Water Line 1.00 220.00 LF 2BASE Base Rock 1.00 66.00 TON 2MEGALUG MJ Megalug Pack 1.00 2.00 EA 2MJFITTING MJ Fitting 1.00 1.00 EA 2PIPEACC Pipe Accessories 1.00 200.00 LF 2PIPEALLOW Misc Pipe Matt Allowance 1.00 36,025.27 LS 2SAND Bedding Sand - FOB Plant 1.00 58.00 TON 2VALVEALLOW Valve Allowance 1.00 0.50 EA Biditem 8" PRV Takeoff Qty: 70 Bid Qty: Base Labor Burden Total Labor U. cost 3,124.16 2,909.04 6,033.20 Total 3,124.16 2,909.04 6,033.20 Manhours Unit/MH MH/Unit 80.0000 0.0125 80.0000 Perm Matls Const Matls Sub 177.63 0.00 0.00 35,525.20 0.00 0.00 WC: 5221 Concrete Construction Unit Cost Tax/OT % Actual UC 89.70 108.10 96.97 9.75 108.10 10.54 239.18 108.10 258.56 3,491.77 108.10 3,774.60 2.50 108.10 2.70 0.10 108.10 0.11 6.00 108.10 6.49 8,788.80 100.00 8,788.80 1.000 EA 1.000 EA Equipment Perm Matls Const Matls 4,360.77 21,378.13 0.00 4,360.77 21,378.13 0.00 $/MH Base Labor/MH 408.6513 39.0520 Sub 920.00 920.00 Total Labor/MH 75.4150 Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub U.Cost 0.00 0.00 0.00 0.00 21,272.73 0.00 0.00 Total 0.00 0.00 0.00 0.00 21,272.73 0.00 0.00 Total 177.63 35, 525.20 Total 21,332.45 695.62 517.11 3,774.60 540.50 3,894.33 376.19 4,394.40 Total 32,692.10 32,692.10 Unit/CH 0.0625 Total 21,272.73 21,272.73 202OTDPUDCIP Truckee Donner PUD CIP Cost Basis 03/16/2020 7:29 AM Page 17 of 35 Calendar: STD Standard Resource Description 2BNGKIT Bolt/Nut/Gasket Kit 2PIPEALLOW Misc Pipe Matt Allowance 2PIPESPOOL Pipe Spool 2PRV Pressure Reducing Valve 2PRVVAULT Precast PRV Vault Hrs/Shift: 8 Pcs/Wste Quantity Unit 1.00 2.00 EA 1.00 19,197.48 LS 1.00 2.00 EA 1.00 1.00 EA 1.00 1.00 EA WC: 5221 Concrete Construction Unit Cost Tax/OT % Actual UC Total 125.00 108.10 135.13 270.25 0.10 108.10 0.11 2,075.25 748.00 108.10 808.59 1,617.18 7,513.00 108.10 8,121.55 8,121.55 8,500.00 108.10 9,188.50 9,188.50 Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 1,562.08 1,454.52 3,016.60 2,342.39 105.40 0.00 920.00 6,384.39 Total 1,562.08 1,454.52 3,016.60 2,342.39 105.40 0.00 920.00 6,384.39 Crew $/Unit Crew Hrs/Unit Units/Crew Hr $/Crew Hour Shifts Units/Shift Shifts/Unit $/Shift 5,358.9900 8.0000 0.1250 669.8738 1.0000 1.0000 1.0000 6,384.3900 Manhours Unit/MH MH/Unit Total Labor/MH Base Labor/Unit 40.0000 0.0250 40.0000 75.4150 1,562.0800 Calendar: STD Standard Hrs/Shift: 8 WC: 5221 Concrete Construction Crew: SMPIPE Small Pipe Crew Prod: S 1 Eff: 100.00 Crew Hrs: 8.00 Labor PCs: 5.00 Equipment Pcs: 3.00 Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT % Actual UC Total 2BASE Base Rock 1.00 10.00 TON 9.75 108.10 10.54 105.40 4HAUL Hauling - Sub 1.00 8.00 HR 115.00 100.00 115.00 920.00 8031 ROLLER 18-29" WALKBEHIND DBL 1.00 8.00 HR 37.47 108.10 40.50 324.01 8267 LOADER WHEEL 2.5-2.9 CUBIC Y 1.00 8.00 HR 103.25 108.10 111.61 892.86 8276 EXCAVATOR 35000-39999# 1.00 8.00 HR 130.15 108.10 140.69 1,125.52 LABORER Laborer 2.00 16.00 MH 30.49 100.00 60.60 969.58 OPER4 Operator Foreman 1.00 8.00 MH 48.00 100.00 89.27 714.13 OPERATOR Operator 2.00 16.00 MH 43.14 100.00 83.31 1,332.89 • - Quantity: Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 1,562.08 1,454.52 3,016.60 2,018.38 0.00 0.00 0.00 5,034.98 Total 1,562.08 1,454.52 3,016.60 2,018.38 0.00 0.00 0.00 5,034.98 Crew $/Unit Crew Hrs/Unit Units/Crew Hr $/Crew Hour Shifts Units/Shift Shifts/Unit $/Shift 5,034.9800 8.0000 0.1250 629.3725 1.0000 1.0000 1.0000 5,034.9800 Manhours Unit/MH MH/Unit Total Labor/MH Base Labor/Unit 40.0000 0.0250 40.0000 75.4150 1,562.0800 Calendar: STD Standard Hrs/Shift: 8 WC: 5221 Concrete Construction Crew: SMPIPE Small Pipe Crew Prod: S 1 Eff: 100.00 Crew Hrs: 8.00 Labor PCs: 5.00 Equipment PCs: 2.00 Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT % Actual UC Total 8267 LOADER WHEEL 2.5-2.9 CUBIC Y 1.00 8.00 HR 103.25 108.10 111.61 892.86 8276 EXCAVATOR 35000-39999# 1.00 8.00 HR 130.15 108.10 140.69 1,125.52 LABORER Laborer 2.00 16.00 MH 30.49 100.00 60.60 969.58 OPER4 Operator Foreman 1.00 8.00 MH 48.00 100.00 89.27 714.13 OPERATOR Operator 2.00 16.00 MH 43.14 100.00 83.31 1,332.89 Biditem 12" PRV 71 Takeoff Qty: 1.000 EA Bid Qty: 1.000 EA Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total 202OTDPUDCIP Truckee Donner PUD CIP Cost Basis 03/16/2020 7:29 AM Page 18 of 35 U.Cost 3,124.16 2,909.04 6,033.20 4,360.77 28,111.28 0.00 920.00 39,425.25 Total 3,124.16 2,909.04 6,033.20 4,360.77 28,111.28 0.00 920.00 39,425.25 Manhours Unit/MH MH/Unit $/MH Base Labor/MH Total Labor/MH Unit/CH 80.0000 0.0125 80.0000 492.8156 39.0520 75.4150 0.0625 71.1 PRV Materials Quantity:Activity: Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 0.00 0.00 0.00 0.00 28,005.88 0.00 0.00 28,005.88 Total 0.00 0.00 0.00 0.00 28,005.88 0.00 0.00 28,005.88 Calendar: STD Standard Hrs/Shift: 8 WC: 5221 Concrete Construction Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT % Actual UC Total 2BNGKIT Bolt/Nut/Gasket Kit 1.00 2.00 EA 125.00 108.10 135.13 270.25 2PIPEALLOW Misc Pipe Matt Allowance 1.00 25,273.78 LS 0.10 108.10 0.11 2,732.10 2PIPESPOOL Pipe Spool 1.00 2.00 EA 748.00 108.10 808.59 1,617.18 2PRV Pressure Reducing Valve 1.00 1.00 EA 12,134.00 108.10 13,116.85 13,116.85 2PRVVAULT Precast PRV Vault 1.00 1.00 EA 9,500.00 108.10 10,269.50 10,269.50 71.2 Install PRV Vault Quantity:Activity: Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 1,562.08 1,454.52 3,016.60 2,342.39 105.40 0.00 920.00 6,384.39 Total 1,562.08 1,454.52 3,016.60 2,342.39 105.40 0.00 920.00 6,384.39 Crew $/Unit Crew Hrs/Unit Units/Crew Hr $/Crew Hour Shifts Units/Shift Shifts/Unit $/Shift 5,358.9900 8.0000 0.1250 669.8738 1.0000 1.0000 1.0000 6,384.3900 Manhours Unit/MH MH/Unit Total Labor/MH Base Labor/Unit 40.0000 0.0250 40.0000 75.4150 1,562.0800 Calendar: STD Standard Hrs/Shift: 8 WC: 5221 Concrete Construction Crew: SMPIPE Small Pipe Crew Prod: S 1 Eff: 100.00 Crew Hrs: 8.00 Labor PCs: 5.00 Equipment PCs: 3.00 Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT % Actual UC Total 2BASE Base Rock 1.00 10.00 TON 9.75 108.10 10.54 105.40 4HAUL Hauling - Sub 1.00 8.00 HR 115.00 100.00 115.00 920.00 8031 ROLLER 18-29" WALKBEHIND DBL 1.00 8.00 HR 37.47 108.10 40.50 324.01 8267 LOADER WHEEL 2.5-2.9 CUBIC Y 1.00 8.00 HR 103.25 108.10 111.61 892.86 8276 EXCAVATOR 35000-39999# 1.00 8.00 HR 130.15 108.10 140.69 1,125.52 LABORER Laborer 2.00 16.00 MH 30.49 100.00 60.60 969.58 OPER4 Operator Foreman 1.00 8.00 MH 48.00 100.00 89.27 714.13 OPERATOR Operator 2.00 16.00 MH 43.14 100.00 83.31 1,332.89 71.3 Install PRV Piping/Valve Quantity:Activity: Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 1,562.08 1,454.52 3,016.60 2,018.38 0.00 0.00 0.00 5,034.98 Total 1,562.08 1,454.52 3,016.60 2,018.38 0.00 0.00 0.00 5,034.98 Crew $/Unit Crew Hrs/Unit Units/Crew Hr $/Crew Hour Shifts Units/Shift Shifts/Unit $/Shift 5,034.9800 8.0000 0.1250 629.3725 1.0000 1.0000 1.0000 5,034.9800 Manhours Unit/MH MH/Unit Total Labor/MH Base Labor/Unit 40.0000 0.0250 40.0000 75.4150 1,562.0800 Calendar: STD Standard Hrs/Shift: 8 WC: 5221 Concrete Construction Crew: SMPIPE Small Pipe Crew Prod: S 1 Eff: 100.00 Crew Hrs: 8.00 Labor PCs: 5.00 Equipment PCs: 2.00 Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT % Actual UC Total 8267 LOADER WHEEL 2.5-2.9 CUBIC Y 1.00 8.00 HR 103.25 108.10 111.61 892.86 8276 EXCAVATOR 35000-39999# 1.00 8.00 HR 130.15 108.10 140.69 1,125.52 2020TDPUDCIP Truckee Donner PUD CIP Cost Basis 03/16/2020 7:29 AM Page 19 of 35 LABORER Laborer 2.00 16.00 MH 30.49 100.00 60.60 969.58 OPER4 Operator Foreman 1.00 8.00 MH 48.00 100.00 89.27 714.13 OPERATOR Operator 2.00 16.00 MH 43.14 100.00 83.31 1,332.89 Biditem Water Meter Takeoff Qty: 1.000 EA 90 Bid Qty: 1.000 EA Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 304.24 283.31 587.55 207.56 2,291.54 0.00 0.00 3,086.65 Total 304.24 283.31 587.55 207.56 2,291.54 0.00 0.00 3,086.65 Manhours Unit/MH MH/Unit $/MH Base Labor/MH Total Labor/MH Unit/CH 8.0000 0.1250 8.0000 385.8313 38.0300 73.4438 0.5000 Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub U.Cost 0.00 0.00 0.00 0.00 2,291.54 0.00 0.00 Total 0.00 0.00 0.00 0.00 2,291.54 0.00 0.00 Calendar: STD Standard Hrs/Shift: 8 WC: 5221 Concrete Construction Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT % Actual UC 21"POLY 1" Poly Pipe 1.00 20.00 LF 1.06 108.10 1.15 2CORP Corp Stop 1.00 1.00 EA 68.58 108.10 74.13 2PIPEALLOW Misc Pipe Matt Allowance 1.00 2,067.99 LS 0.10 108.10 0.11 2PITSET Pit Setter 1.00 1.00 EA 1,648.25 108.10 1,781.76 2SADDLE Pipe Saddle 1.00 1.00 EA 175.00 108.10 189.18 Total 2,291.54 2,291.54 Total 22.92 74.13 223.55 1,781.76 189.18 Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 304.24 283.31 587.55 207.56 0.00 0.00 0.00 795.11 Total 304.24 283.31 587.55 207.56 0.00 0.00 0.00 795.11 Crew $/Unit Crew Hrs/Unit Units/Crew Hr $/Crew Hour Shifts Units/Shift Shifts/Unit $/Shift 795.1100 2.0000 0.5000 397.5550 0.2500 4.0000 0.2500 3,180.4400 Manhours Unit/MH MH/Unit Total Labor/MH Base Labor/Unit 8.0000 0.1250 8.0000 73.4438 304.2400 Calendar: STD Standard Hrs/Shift: 8 WC: 5221 Concrete Construction Crew: MINIP Mini Pipe Crew Prod: S 0.25 Eff: 100.00 Crew Hrs: 2.00 Labor PCs: 4.00 Equipment PCs: 3.00 Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT % Actual UC Total 8031 ROLLER18-29" WALKBEHIND DBL 1.00 2.00 FIR 37.47 108.10 40.50 81.00 8243 BACKHOE/LOADER 60-90HP 4WD 1.00 2.00 FIR 50.21 108.10 54.28 108.56 8UTLPU Utility Pickup 1.00 2.00 HR 9.00 100.00 9.00 18.00 LABORER Laborer 2.00 4.00 MH 30.49 100.00 60.60 242.40 OPER4 Operator Foreman 1.00 2.00 MH 48.00 100.00 89.27 178.54 OPERATOR Operator 1.00 2.00 MH 43.14 100.00 83.31 166.61 Biditem Fire Hydrant 100 Takeoff Qty: 1.000 EA Bid Qty: 1.000 EA Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 912.72 849.91 1,762.63 595.10 6,647.98 0.00 0.00 9,005.71 Total 912.72 849.91 1,762.63 595.10 6,647.98 0.00 0.00 9,005.71 202OTDPUDCIP Truckee Donner PUD CIP Cost Basis 03/16/2020 7:29 AM Page 20 of 35 Manhours Unit/MH 24.0000 0.0417 MH/Unit $/MH Base Labor/MH 24.0000 375.2379 38.0300 Total Labor/MH 73.4429 Unit/CH 0.1667 Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 0.00 0.00 0.00 0.00 6,566.90 0.00 0.00 6,566.90 Total 0.00 0.00 0.00 0.00 6,566.90 0.00 0.00 6,566.90 Calendar: STD Standard Hrs/Shift: 8 WC: 5221 Concrete Construction Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT % Actual UC Total 26"H20 6" Water Line 1.00 20.00 LF 14.05 108.10 15.19 303.76 26"PVC 6" PVC 1.00 5.00 LF 7.50 108.10 8.11 40.54 2FIREH YD Fire Hydrant 1.00 1.00 EA 4,428.00 108.10 4,786.67 4,786.67 2G5 G5 Valve Box 1.00 1.00 EA 78.00 108.10 84.32 84.32 2GATEVLV Gate Valve 1.00 1.00 EA 836.23 108.10 903.96 903.96 2PIPEALLOW Misc Pipe Matt Allowance 1.00 8,282.11 LS 0.05 108.10 0.05 447.65 •• . Quantity: 1 Unit: EA Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 608.48 566.60 1,175.08 415.13 0.00 0.00 0.00 1,590.21 Total 608.48 566.60 1,175.08 415.13 0.00 0.00 0.00 1,590.21 Crew $/Unit Crew Hrs/Unit Units/Crew Hr $/Crew Hour Shifts Units/Shift Shifts/Unit $/Shift 1,590.2100 4.0000 0.2500 397.5525 0.5000 2.0000 0.5000 3,180.4200 Manhours Unit/MH MH/Unit Total Labor/MH Base Labor/Unit 16.0000 0.0625 16.0000 73.4425 608.4800 Calendar: STD Standard Hrs/Shift: 8 WC: 5221 Concrete Construction Crew: MINIP Mini Pipe Crew Prod: S 0.5 Eff: 100.00 Crew Hrs: 4.00 Labor Pcs: 4.00 Equipment PCs: 3.00 Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT % Actual UC Total 8031 ROLLER 18-29" WALKBEHIND DBL 1.00 4.00 HR 37.47 108.10 40.50 162.00 8243 BACKHOE/LOADER 60-90HP 4WD 1.00 4.00 HR 50.21 108.10 54.28 217.13 8UTLPU Utility Pickup 1.00 4.00 HR 9.00 100.00 9.00 36.00 LABORER Laborer 2.00 8.00 MH 30.49 100.00 60.60 484.79 OPER4 Operator Foreman 1.00 4.00 MH 48.00 100.00 89.27 357.07 OPERATOR Operator 1.00 4.00 MH 43.14 100.00 83.31 333.22 ••3 Raise/Collar Valve Quantity: 1 Unit: EA Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 304.24 283.31 587.55 179.97 81.08 0.00 0.00 848.60 Total 304.24 283.31 587.55 179.97 81.08 0.00 0.00 848.60 Crew $/Unit Crew Hrs/Unit Units/Crew Hr $/Crew Hour Shifts Units/Shift Shifts/Unit $/Shift 767.5200 2.0000 0.5000 383.7600 0.2500 4.0000 0.2500 3,394.4000 Manhours Unit/MH MH/Unit Total Labor/MH Base Labor/Unit 8.0000 0.1250 8.0000 73.4438 304.2400 Calendar: STD Standard Hrs/Shift: 8 WC: 5221 Concrete Construction Crew: MINIP Mini Pipe Crew Prod: S 0.25 Eff: 100.00 Crew Hrs: 2.00 Labor PCs: 4.00 Equipment PCs: 4.00 Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT % Actual UC Total 2CONC Ready -Mix Concrete 1.00 0.50 CY 150.00 108.10 162.16 81.08 8001 COMPRESSOR 155-175 CFM DIESE 1.00 2.00 HR 15.93 108.10 17.22 34.44 8016 BREAKER PAVEMENT AIR 90# 1.00 2.00 HR 8.77 108.10 9.49 18.97 8243 BACKHOE/LOADER 60-90HP 4WD 1.00 2.00 HR 50.21 108.10 54.28 108.56 8UTLPU Utility Pickup 1.00 2.00 HR 9.00 100.00 9.00 18.00 LABORER Laborer 2.00 4.00 MH 30.49 100.00 60.60 242.40 202OTDPUDCIP Truckee Donner PUD CIP Cost Basis 03/16/2020 7:29 AM Page 21 of 35 OPER4 Operator Foreman 1.00 2.00 MH 48.00 100.00 89.27 178.54 OPERATOR Operator 1.00 2.00 MH 43.14 100.00 83.31 166.61 Biditem 4" Valve Takeoff Qty: 1.000 EA 105 Bid Qty: 1.000 EA Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 456.36 424.97 881.33 283.75 997.06 0.00 0.00 2,162.14 Total 456.36 424.97 881.33 283.75 997.06 0.00 0.00 2,162.14 Manhours Unit/MH MH/Unit $/MH Base Labor/MH Total Labor/MH Unit/CH 12.0000 0.0833 12.0000 180.1783 38.0300 73.4442 0.3333 105.1 Valve Materials Quantity: Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 0.00 0.00 0.00 0.00 915.98 0.00 0.00 915.98 Total 0.00 0.00 0.00 0.00 915.98 0.00 0.00 915.98 Calendar: STD Standard Hrs/Shift: 8 WC: 5221 Concrete Construction Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT % Actual UC Total 24'MEGALUG 4" Megalug 1.00 2.00 EA 38.12 108.10 41.21 82.42 24"MJVLV 4" MJ Gate Valve 1.00 1.00 EA 655.60 108.10 708.70 708.70 26"PVC 6" PVC 1.00 5.00 LF 7.50 108.10 8.11 40.54 2G5 G5 Valve Box 1.00 1.00 EA 78.00 108.10 84.32 84.32 105.2 Install Valve Quantity: Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 152.12 141.66 293.78 103.78 0.00 0.00 0.00 397.56 Total 152.12 141.66 293.78 103.78 0.00 0.00 0.00 397.56 Crew $/Unit Crew Hrs/Unit Units/Crew Hr $/Crew Hour Shifts Units/Shift Shifts/Unit $/Shift 397.5600 1.0000 1.0000 397.5600 0.1250 8.0000 0.1250 3,180.4800 Manhours Unit/MH MH/Unit Total Labor/MH Base Labor/Unit 4.0000 0.2500 4.0000 73.4450 152.1200 Calendar: STD Standard Hrs/Shift: 8 WC: 5221 Concrete Construction Crew: MINIP Mini Pipe Crew Prod: S 0.125 Eff: 100.00 Crew Hrs: 1.00 Labor PCs: 4.00 Equipment PCs: 3.00 Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT % Actual UC Total 8031 ROLLER 18-29" WALKBEHIND DBL 1.00 1.00 HR 37.47 108.10 40.50 40.50 8243 BACKHOE/LOADER 60-90HP 4WD 1.00 1.00 HR 50.21 108.10 54.28 54.28 8UTLPU Utility Pickup 1.00 1.00 HR 9.00 100.00 9.00 9.00 LABORER Laborer 2.00 2.00 MH 30.49 100.00 60.60 121.20 OPER4 Operator Foreman 1.00 1.00 MH 48.00 100.00 89.27 89.27 OPERATOR Operator 1.00 1.00 MH 43.14 100.00 83.31 83.31 •5.3 Raise/Collar Valve Quantity: Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 304.24 283.31 587.55 179.97 81.08 0.00 0.00 848.60 Total 304.24 283.31 587.55 179.97 81.08 0.00 0.00 848.60 Crew $/Unit Crew Hrs/Unit Units/Crew Hr $/Crew Hour Shifts Units/Shift Shifts/Unit $/Shift 767.5200 2.0000 0.5000 383.7600 0.2500 4.0000 0.2500 3,394.4000 Manhours Unit/MH MH/Unit Total Labor/MH Base Labor/Unit 8.0000 0.1250 8.0000 73.4438 304.2400 Calendar: STD Standard Hrs/Shift: 8 WC: 5221 Concrete Construction 202OTDPUDCIP Truckee Donner PUD CIP Cost Basis 03/16/2020 7:29 AM Page 22 of 35 Crew: MINIP Mini Pipe Crew Prod: S 0.25 Eff: 100.00 Crew Hrs: 2.00 Labor PCs: 4.00 Equipment PCs: 4.00 Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT % Actual UC Total 2CONC Ready -Mix Concrete 1.00 0.50 CY 150.00 108.10 162.16 81.08 8001 COMPRESSOR 155-175 CFM DIESE 1.00 2.00 HR 15.93 108.10 17.22 34.44 8016 BREAKER PAVEMENT AIR 90# 1.00 2.00 HR 8.77 108.10 9.49 18.97 8243 BACKHOE/LOADER 60-90HP 4WD 1.00 2.00 HR 50.21 108.10 54.28 108.56 8UTLPU Utility Pickup 1.00 2.00 HR 9.00 100.00 9.00 18.00 LABORER Laborer 2.00 4.00 MH 30.49 100.00 60.60 242.40 OPER4 Operator Foreman 1.00 2.00 MH 48.00 100.00 89.27 178.54 OPERATOR Operator 1.00 2.00 MH 43.14 100.00 83.31 166.61 Biditem 110 6" Valve Takeoff Qty: 1.000 EA Bid Qty: 1.000 EA Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 456.36 424.97 881.33 283.75 1,233.03 0.00 0.00 2,398.11 Total 456.36 424.97 881.33 283.75 1,233.03 0.00 0.00 2,398.11 Manhours Unit/MH MH/Unit $/MH Base Labor/MH Total Labor/MH Unit/CH 12.0000 0.0833 12.0000 199.8425 38.0300 73.4442 0.3333 110.1 Valve Materials Quantity: 1 Unit: EA Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 0.00 0.00 0.00 0.00 1,151.95 0.00 0.00 1,151.95 Total 0.00 0.00 0.00 0.00 1,151.95 0.00 0.00 1,151.95 Calendar: STD Standard Hrs/Shift: 8 WC: 5221 Concrete Construction Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT % Actual UC Total 26"PVC 6" PVC 1.00 5.00 LF 7.50 108.10 8.11 40.54 2G5 G5 Valve Box 1.00 1.00 EA 78.00 108.10 84.32 84.32 2GATEVLV Gate Valve 1.00 1.00 EA 836.23 108.10 903.96 903.96 2MEGALUG MJ Megalug Pack 1.00 2.00 EA 56.95 108.10 61.57 123.13 Activity: 110.2 Install Valve Quantity: 1 Unit: EA Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 152.12 141.66 293.78 103.78 0.00 0.00 0.00 397.56 Total 152.12 141.66 293.78 103.78 0.00 0.00 0.00 397.56 Crew $/Unit Crew Hrs/Unit Units/Crew Hr $/Crew Hour Shifts Units/Shift Shifts/Unit $/Shift 397.5600 1.0000 1.0000 397.5600 0.1250 8.0000 0.1250 3,180.4800 Manhours Unit/MH MH/Unit Total Labor/MH Base Labor/Unit 4.0000 0.2500 4.0000 73.4450 152.1200 Calendar: STD Standard Hrs/Shift: 8 WC: 5221 Concrete Construction Crew: MINIP Mini Pipe Crew Prod: S 0.125 Eff: 100.00 Crew Hrs: 1.00 Labor PCs: 4.00 Equipment PCs: 3.00 Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT % Actual UC Total 8031 ROLLER 18-29" WALKBEHIND DBL 1.00 1.00 HR 37.47 108.10 40.50 40.50 8243 BACKHOE/LOADER 60-90HP 4WD 1.00 1.00 HR 50.21 108.10 54.28 54.28 8UTLPU Utility Pickup 1.00 1.00 HR 9.00 100.00 9.00 9.00 LABORER Laborer 2.00 2.00 MH 30.49 100.00 60.60 121.20 OPER4 Operator Foreman 1.00 1.00 MH 48.00 100.00 89.27 89.27 OPERATOR Operator 1.00 1.00 MH 43.14 100.00 83.31 83.31 202OTDPUDCIP Truckee Donner PUD CIP Cost Basis 03/16/2020 7:29 AM Page 23 of 35 Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U. Cost 304.24 283.31 587.55 179.97 81.08 0.00 0.00 848.60 Total 304.24 283.31 587.55 179.97 81.08 0.00 0.00 848.60 Crew $/Unit Crew Hrs/Unit Units/Crew Hr $/Crew Hour Shifts Units/Shift Shifts/Unit $/Shift 767.5200 2.0000 0.5000 383.7600 0.2500 4.0000 0.2500 3,394.4000 Manhours Unit/MH MH/Unit Total Labor/MH Base Labor/Unit 8.0000 0.1250 8.0000 73.4438 304.2400 Calendar: STD Standard Hrs/Shift: 8 WC: 5221 Concrete Construction Crew: MINIP Mini Pipe Crew Prod: S 0.25 Eff: 100.00 Crew Hrs: 2.00 Labor PCs: 4.00 Equipment PCs: 4.00 Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT % Actual UC Total 2CONC Ready -Mix Concrete 1.00 0.50 CY 150.00 108.10 162.16 81.08 8001 COMPRESSOR 155-175 CFM DIESE 1.00 2.00 HR 15.93 108.10 17.22 34.44 8016 BREAKER PAVEMENT AIR 90# 1.00 2.00 HR 8.77 108.10 9.49 18.97 8243 BACKHOE/LOADER 60-90HP 4WD 1.00 2.00 HR 50.21 108.10 54.28 108.56 8UTLPU Utility Pickup 1.00 2.00 HR 9.00 100.00 9.00 18.00 LABORER Laborer 2.00 4.00 MH 30.49 100.00 60.60 242.40 OPER4 Operator Foreman 1.00 2.00 MH 48.00 100.00 89.27 178.54 OPERATOR Operator 1.00 2.00 MH 43.14 100.00 83.31 166.61 Biditem 120 Base Labor U. Cost 499.50 Total 499.50 Manhours 13.0000 Base Labor U. Cost 0.00 Total 0.00 Calendar: STD Standard Resource Description 26"PVC 6" PVC 2G5 G5 Valve Box 2GATEVLV Gate Valve 2MEGALUG MJ Megalug Pack 8" Valve Takeoff Qty: Bid Qty: Burden Total Labor 465.13 964.63 465.13 964.63 Unit/MH MH/Unit 0.0769 13.0000 Base Labor U. Cost 195.26 Total 195.26 Crew $/Unit Crew Hrs/Unit 669.8800 1.0000 Manhours 5.0000 Calendar: STD Standard Crew: SMPIPE Small Pipe Crew 1.000 EA 1.000 EA Equipment Perm Matls Const Matls Sub 472.77 1,795.62 0.00 0.00 472.77 1,795.62 0.00 0.00 $/MH Base Labor/MH Total Labor/MH 248.6938 38.4231 74.2023 Burden Total Labor Equipment 0.00 0.00 0.00 0.00 0.00 0.00 Hrs/Shift: 8 Pcs/Wste Quantity Unit 1.00 5.00 LF 1.00 1.00 EA 1.00 1.00 EA 1.00 2.00 EA Perm Matls Const Matls Sub 1,714.54 0.00 0.00 1,714.54 0.00 0.00 WC: 5221 Concrete Construction Unit Cost Tax/OT % Actual UC 7.50 108.10 8.11 78.00 108.10 84.32 1,331.84 108.10 1,439.72 69.36 108.10 74.98 Burden Total Labor Equipment Perm Matls 181.82 377.08 292.80 0.00 181.82 377.08 292.80 0.00 Units/Crew Hr $/Crew Hour Shifts 1.0000 669.8800 0.1250 Unit/MH MH/Unit 0.2000 5.0000 Hrs/Shift: 8 WC: 5221 Prod: S 0.125 Eff: 100.00 Crew Hrs: 1.00 Total 3,233.02 3,233.02 Unit/CH 0.3333 Total 1,714.54 1,714.54 Total 40.54 84.32 1,439.72 149.96 Const Matls Sub Total 0.00 0.00 669.88 0.00 0.00 669.88 Units/Shift Shifts/Unit $/Shift 8.0000 0.1250 5,359.0400 Total Labor/MH Base Labor/Unit 75.4160 195.2600 Concrete Construction Labor PCs: 5.00 Equipment PCs: 3.00 202OTDPUDCIP Truckee Donner PUD CIP Cost Basis 03/16/2020 7:29 AM Page 24 of 35 Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT % Actual UC Total 8031 ROLLER 18-29" WALKBEHIND DBL 1.00 1.00 HR 37.47 108.10 40.50 40.50 8267 LOADER WHEEL 2.5-2.9 CUBIC Y 1.00 1.00 HR 103.25 108.10 111.61 111.61 8276 EXCAVATOR 35000-39999# 1.00 1.00 HR 130.15 108.10 140.69 140.69 LABORER Laborer 2.00 2.00 MH 30.49 100.00 60.60 121.20 OPER4 Operator Foreman 1.00 1.00 MH 48.00 100.00 89.27 89.27 OPERATOR Operator 2.00 2.00 MH 43.14 100.00 83.31 166.61 Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U. Cost 304.24 283.31 587.55 179.97 81.08 0.00 0.00 848.60 Total 304.24 283.31 587.55 179.97 81.08 0.00 0.00 848.60 Crew $/Unit Crew Hrs/Unit Units/Crew Hr $/Crew Hour Shifts Units/Shift Shifts/Unit $/Shift 767.5200 2.0000 0.5000 383.7600 0.2500 4.0000 0.2500 3,394.4000 Manhours Unit/MH MH/Unit Total Labor/MH Base Labor/Unit 8.0000 0.1250 8.0000 73.4438 304.2400 Calendar: STD Standard Hrs/Shift: 8 WC: 5221 Concrete Construction Crew: MINIP Mini Pipe Crew Prod: S 0.25 Eff: 100.00 Crew Hrs: 2.00 Labor Pcs: 4.00 Equipment PCs: 4.00 Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT % Actual UC Total 2CONC Ready -Mix Concrete 1.00 0.50 CY 150.00 108.10 162.16 81.08 8001 COMPRESSOR 155-175 CFM DIESE 1.00 2.00 HR 15.93 108.10 17.22 34.44 8016 BREAKER PAVEMENT AIR 90# 1.00 2.00 HR 8.77 108.10 9.49 18.97 8243 BACKHOE/LOADER 60-90HP 4WD 1.00 2.00 HR 50.21 108.10 54.28 108.56 8UTLPU Utility Pickup 1.00 2.00 HR 9.00 100.00 9.00 18.00 LABORER Laborer 2.00 4.00 MH 30.49 100.00 60.60 242.40 OPER4 Operator Foreman 1.00 2.00 MH 48.00 100.00 89.27 178.54 OPERATOR Operator 1.00 2.00 MH 43.14 100.00 83.31 166.61 Biditem 130 Base Labor U. Cost 499.50 Total 499.50 Manhours 13.0000 Base Labor U. Cost 0.00 Total 0.00 Calendar: STD Standard Resource Description 26"PVC 6" PVC 2G5 G5 Valve Box 2GATEVLV Gate Valve 2MEGALUG MJ Megalug Pack Base Labor 10" Valve Takeoff Qty: Bid Qty: Burden Total Labor 465.13 964.63 465.13 964.63 Unit/MH MH/Unit 0.0769 13.0000 1.000 EA 1.000 EA Equipment Perm Matls Const Matls Sub 472.77 2,606.57 0.00 0.00 472.77 2,606.57 0.00 0.00 $/MH Base Labor/MH Total Labor/MH 311.0746 38.4231 74.2023 Burden Total Labor Equipment Perm Matls Const Matls Sub 0.00 0.00 0.00 2,525.49 0.00 0.00 0.00 0.00 0.00 2,525.49 0.00 0.00 Hrs/Shift: 8 WC: 5221 Concrete Construction Pcs/Wste Quantity Unit Unit Cost Tax/OT % Actual UC 1.00 5.00 LF 7.50 108.10 8.11 1.00 1.00 EA 78.00 108.10 84.32 1.00 1.00 EA 2,076.59 108.10 2,244.79 1.00 2.00 EA 72.08 108.10 77.92 istall Valve Quantity: 1 Burden Total Labor Equipment Perm Matls Const Matls Sub Total 4,043.97 4,043.97 Unit/CH 0.3333 Total 2,525.49 2,525.49 Total 40.54 84.32 2,244.79 155.84 Total 202OTDPUDCIP Truckee Donner PUD CIP Cost Basis 03/16/2020 7:29 AM Page 25 of 35 U.Cost 195.26 181.82 377.08 292.80 0.00 0.00 0.00 669.88 Total 195.26 181.82 377.08 292.80 0.00 0.00 0.00 669.88 Crew $/Unit Crew Hrs/Unit Units/Crew Hr $/Crew Hour Shifts Units/Shift Shifts/Unit $/Shift 669.8800 1.0000 1.0000 669.8800 0.1250 8.0000 0.1250 5,359.0400 Manhours Unit/MH MH/Unit Total Labor/MH Base Labor/Unit 5.0000 0.2000 5.0000 75.4160 195.2600 Calendar: STD Standard Hrs/Shift: 8 WC: 5221 Concrete Construction Crew: SMPIPE Small Pipe Crew Prod: S 0.125 Eff: 100.00 Crew Hrs: 1.00 Labor PCs: 5.00 Equipment PCs: 3.00 Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT % Actual UC Total 8031 ROLLER 18-29" WALKBEHIND DBL 1.00 1.00 HR 37.47 108.10 40.50 40.50 8267 LOADER WHEEL 2.5-2.9 CUBIC Y 1.00 1.00 HR 103.25 108.10 111.61 111.61 8276 EXCAVATOR 35000-39999# 1.00 1.00 HR 130.15 108.10 140.69 140.69 LABORER Laborer 2.00 2.00 MH 30.49 100.00 60.60 121.20 OPER4 Operator Foreman 1.00 1.00 MH 48.00 100.00 89.27 89.27 OPERATOR Operator 2.00 2.00 MH 43.14 100.00 83.31 166.61 Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 304.24 283.31 587.55 179.97 81.08 0.00 0.00 848.60 Total 304.24 283.31 587.55 179.97 81.08 0.00 0.00 848.60 Crew $/Unit Crew Hrs/Unit Units/Crew Hr $/Crew Hour Shifts Units/Shift Shifts/Unit $/Shift 767.5200 2.0000 0.5000 383.7600 0.2500 4.0000 0.2500 3,394.4000 Manhours Unit/MH MH/Unit Total Labor/MH Base Labor/Unit 8.0000 0.1250 8.0000 73.4438 304.2400 Calendar: STD Standard Hrs/Shift: 8 WC: 5221 Concrete Construction Crew: MINIP Mini Pipe Crew Prod: S 0.25 Eff: 100.00 Crew Hrs: 2.00 Labor PCs: 4.00 Equipment PCs: 4.00 Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT % Actual UC Total 2CONC Ready -Mix Concrete 1.00 0.50 CY 150.00 108.10 162.16 81.08 8001 COMPRESSOR 155-175 CFM DIESE 1.00 2.00 HR 15.93 108.10 17.22 34.44 8016 BREAKER PAVEMENT AIR 90# 1.00 2.00 HR 8.77 108.10 9.49 18.97 8243 BACKHOE/LOADER 60-90HP 4WD 1.00 2.00 HR 50.21 108.10 54.28 108.56 8UTLPU Utility Pickup 1.00 2.00 HR 9.00 100.00 9.00 18.00 LABORER Laborer 2.00 4.00 MH 30.49 100.00 60.60 242.40 OPER4 Operator Foreman 1.00 2.00 MH 48.00 100.00 89.27 178.54 OPERATOR Operator 1.00 2.00 MH 43.14 100.00 83.31 166.61 Biditem 140 Base Labor U. Cost 499.50 Total 499.50 Manhours 13.0000 12" Valve Takeoff Qty: Bid Qty: Burden Total Labor 465.13 964.63 465.13 964.63 Unit/MH MH/Unit 0.0769 13.0000 1.000 EA 1.000 EA Equipment Perm Matls Const Matls 472.77 3,296.82 0.00 472.77 3,296.82 0.00 $/MH Base Labor/MH 364.1708 38.4231 Sub Total 0.00 4,734.22 0.00 4,734.22 Total Labor/MH Unit/CH 74.2023 0.3333 Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 0.00 0.00 0.00 0.00 3,215.74 0.00 0.00 3,215.74 Total 0.00 0.00 0.00 0.00 3,215.74 0.00 0.00 3,215.74 202OTDPUDCIP Truckee Donner PUD CIP Cost Basis 03/16/2020 7:29 AM Page 26 of 35 Calendar: STD Standard Hrs/Shift: 8 Resource Description Pcs/Wste 26"PVC 6" PVC 1.00 2G5 G5 Valve Box 1.00 2GATEVLV Gate Valve 1.00 2MEGALUG MJ Megalug Pack 1.00 Base Labor Burden Total Labor U.Cost 195.26 181.82 377.08 Total 195.26 181.82 377.08 Crew $/Unit Crew Hrs/Unit Units/Crew Hr 669.8800 1.0000 1.0000 Manhours Unit/MH 5.0000 0.2000 Calendar: STD Standard Hrs/Shift: 8 Crew: SMPIPE Small Pipe Crew Prod: S 0.125 Resource Description Pcs/Wste 8031 ROLLER 18-29" WALKBEHIND DBL 1.00 8267 LOADER WHEEL 2.5-2.9 CUBIC Y 1.00 8276 EXCAVATOR 35000-39999# 1.00 LABORER Laborer 2.00 OPER4 Operator Foreman 1.00 OPERATOR Operator 2.00 Base Labor Burden Total Labor U.Cost 304.24 283.31 587.55 Total 304.24 283.31 587.55 Crew $/Unit Crew Hrs/Unit Units/Crew Hr 767.5200 2.0000 0.5000 Manhours Unit/MH 8.0000 0.1250 Calendar: STD Standard Hrs/Shift: 8 Crew: MINIP Mini Pipe Crew Prod: S 0.25 Resource Description Pcs/Wste 2CONC Ready -Mix Concrete 1.00 8001 COMPRESSOR 155-175 CFM DIESE 1.00 8016 BREAKER PAVEMENT AIR 90# 1.00 8243 BACKHOE/LOADER 60-90HP 4WD 1.00 8UTLPU Utility Pickup 1.00 LABORER Laborer 2.00 OPER4 Operator Foreman 1.00 OPERATOR Operator 1.00 Biditem 14" Valve 150 Qty: WC: 5221 Concrete Construction Quantity Unit Unit Cost Tax/OT % Actual UC Total 5.00 LF 7.50 108.10 8.11 40.54 1.00 EA 78.00 108.10 84.32 84.32 1.00 EA 2,627.64 108.10 2,840.48 2,840.48 2.00 EA 115.82 108.10 125.20 250.40 Equipment Perm Matls Const Matls Sub Total 292.80 0.00 0.00 0.00 669.88 292.80 0.00 0.00 0.00 669.88 $/Crew Hour Shifts Units/Shift Shifts/Unit $/Shift 669.8800 0.1250 8.0000 0.1250 5,359.0400 MH/Unit Total Labor/MH Base Labor/Unit 5.0000 75.4160 195.2600 WC: 5221 Concrete Construction Eff: 100.00 Crew Hrs: 1.00 Labor PCs: 5.00 Equipment PCs: 3.00 Quantity Unit Unit Cost Tax/OT % Actual UC Total 1.00 HR 37.47 108.10 40.50 40.50 1.00 HR 103.25 108.10 111.61 111.61 1.00 HR 130.15 108.10 140.69 140.69 2.00 MH 30.49 100.00 60.60 121.20 1.00 MH 48.00 100.00 89.27 89.27 2.00 MH 43.14 100.00 83.31 166.61 Equipment Perm Matls Const Matls Sub Total 179.97 81.08 0.00 0.00 848.60 179.97 81.08 0.00 0.00 848.60 $/Crew Hour Shifts Units/Shift Shifts/Unit $/Shift 383.7600 0.2500 4.0000 0.2500 3,394.4000 MH/Unit Total Labor/MH Base Labor/Unit 8.0000 73.4438 304.2400 WC: 5221 Concrete Construction Eff: 100.00 Crew Hrs: 2.00 Labor PCs: 4.00 Equipment Pcs: 4.00 Quantity Unit Unit Cost Tax/OT % Actual UC Total 0.50 CY 150.00 108.10 162.16 81.08 2.00 HR 15.93 108.10 17.22 34.44 2.00 HR 8.77 108.10 9.49 18.97 2.00 HR 50.21 108.10 54.28 108.56 2.00 HR 9.00 100.00 9.00 18.00 4.00 MH 30.49 100.00 60.60 242.40 2.00 MH 48.00 100.00 89.27 178.54 2.00 MH 43.14 100.00 83.31 166.61 1.000 EA 1.000 EA Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total 202OTDPUDCIP Truckee Donner PUD CIP Cost Basis 03/16/2020 7:29 AM Page 27 of 35 U.Cost 694.76 646.95 1,341.71 765.57 3,377.38 0.00 0.00 5,484.66 Total 694.76 646.95 1,341.71 765.57 3,377.38 0.00 0.00 5,484.66 Manhours Unit/MH MH/Unit $/MH Base Labor/MH Total Labor/MH Unit/CH 18.0000 0.0556 18.0000 304.7033 38.5978 74.5394 0.2500 150.1 Valve Materials Quantity: 1 Unit: EA Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 0.00 0.00 0.00 0.00 3,296.30 0.00 0.00 3,296.30 Total 0.00 0.00 0.00 0.00 3,296.30 0.00 0.00 3,296.30 Calendar: STD Standard Hrs/Shift: 8 WC: 5221 Concrete Construction Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT % Actual UC Total 24"MEGALUG 4" Megalug 1.00 2.00 EA 166.90 108.10 180.42 360.84 24"MJVLV 4" MJ Gate Valve 1.00 1.00 EA 2,600.00 108.10 2,810.60 2,810.60 26"PVC 6" PVC 1.00 5.00 LF 7.50 108.10 8.11 40.54 2G5 G5 Valve Box 1.00 1.00 EA 78.00 108.10 84.32 84.32 150.2 Install Valve Quantity: 1 Unit: EA Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 390.52 363.64 754.16 585.60 0.00 0.00 0.00 1,339.76 Total 390.52 363.64 754.16 585.60 0.00 0.00 0.00 1,339.76 Crew $/Unit Crew Hrs/Unit Units/Crew Hr $/Crew Hour Shifts Units/Shift Shifts/Unit $/Shift 1,339.7600 2.0000 0.5000 669.8800 0.2500 4.0000 0.2500 5,359.0400 Manhours Unit/MH MH/Unit Total Labor/MH Base Labor/Unit 10.0000 0.1000 10.0000 75.4160 390.5200 Calendar: STD Standard Hrs/Shift: 8 WC: 5221 Concrete Construction Crew: SMPIPE Small Pipe Crew Prod: S 0.25 Eff: 100.00 Crew Hrs: 2.00 Labor PCs: 5.00 Equipment PCs: 3.00 Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT % Actual UC Total 8031 ROLLER 18-29" WALKBEHIND DBL 1.00 2.00 HR 37.47 108.10 40.50 81.00 8267 LOADER WHEEL 2.5-2.9 CUBIC Y 1.00 2.00 HR 103.25 108.10 111.61 223.22 8276 EXCAVATOR 35000-39999# 1.00 2.00 HR 130.15 108.10 140.69 281.38 LABORER Laborer 2.00 4.00 MH 30.49 100.00 60.60 242.40 OPER4 Operator Foreman 1.00 2.00 MH 48.00 100.00 89.27 178.54 OPERATOR Operator 2.00 4.00 MH 43.14 100.00 83.31 333.22 •3 Raise/Collar Valve Quantity: 1 Unit: LS Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 304.24 283.31 587.55 179.97 81.08 0.00 0.00 848.60 Total 304.24 283.31 587.55 179.97 81.08 0.00 0.00 848.60 Crew $/Unit Crew Hrs/Unit Units/Crew Hr $/Crew Hour Shifts Units/Shift Shifts/Unit $/Shift 767.5200 2.0000 0.5000 383.7600 0.2500 4.0000 0.2500 3,394.4000 Manhours Unit/MH MH/Unit Total Labor/MH Base Labor/Unit 8.0000 0.1250 8.0000 73.4438 304.2400 Calendar: STD Standard Hrs/Shift: 8 WC: 5221 Concrete Construction Crew: MINIP Mini Pipe Crew Prod: S 0.25 Eff: 100.00 Crew Hrs: 2.00 Labor PCs: 4.00 Equipment PCs: 4.00 Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT % Actual UC Total 2CONC Ready -Mix Concrete 1.00 0.50 CY 150.00 108.10 162.16 81.08 8001 COMPRESSOR 155-175 CFM DIESE 1.00 2.00 HR 15.93 108.10 17.22 34.44 8016 BREAKER PAVEMENT AIR 90# 1.00 2.00 HR 8.77 108.10 9.49 18.97 8243 BACKHOE/LOADER 60-90HP 4WD 1.00 2.00 HR 50.21 108.10 54.28 108.56 8UTLPU Utility Pickup 1.00 2.00 HR 9.00 100.00 9.00 18.00 202OTDPUDCIP Truckee Donner PUD CIP Cost Basis 03/16/2020 7:29 AM Page 28 of 35 LABORER OPER4 OPERATOR Laborer Operator Foreman Operator 2.00 1.00 1.00 4.00 MH 2.00 MH 2.00 MH 30.49 100.00 48.00 100.00 43.14 100.00 60.60 89.27 83.31 242.40 178.54 166.61 Biditem 16" Valve 160 Takeoff Qty: Bid 1.000 EA 1.000 EA Qty: Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 560.48 525.35 1,085.83 484.19 7,218.78 0.00 0.00 8,788.80 Total 560.48 525.35 1,085.83 484.19 7,218.78 0.00 0.00 8,788.80 Manhours Unit/MH MH/Unit $/MH Base Labor/MH Total Labor/MH Unit/CH 15.0000 0.0667 15.0000 585.9200 37.3653 72.3887 0.2500 Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 0.00 0.00 0.00 0.00 7,137.70 0.00 0.00 7,137.70 Total 0.00 0.00 0.00 0.00 7,137.70 0.00 0.00 7,137.70 Calendar: STD Standard Hrs/Shift: 8 WC: 5221 Concrete Construction Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT % Actual UC Total 26"PVC 6" PVC 1.00 5.00 LF 7.50 108.10 8.11 40.54 2G5 G5 Valve Box 1.00 1.00 EA 78.00 108.10 84.32 84.32 2GATEVLV Gate Valve 1.00 1.00 EA 6,009.00 108.10 6,495.73 6,495.73 2MEGALUG MJ Megalug Pack 1.00 2.00 EA 239.18 108.10 258.56 517.11 160.2 Install Valve Quantity: Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 256.24 242.04 498.28 304.22 0.00 0.00 0.00 802.50 Total 256.24 242.04 498.28 304.22 0.00 0.00 0.00 802.50 Crew $/Unit Crew Hrs/Unit Units/Crew Hr $/Crew Hour Shifts Units/Shift Shifts/Unit $/Shift 802.5000 2.0000 0.5000 401.2500 0.2500 4.0000 0.2500 3,210.0000 Manhours Unit/MH MH/Unit Total Labor/MH Base Labor/Unit 7.0000 0.1429 7.0000 71.1829 256.2400 Calendar: STD Standard Hrs/Shift: 8 WC: 5221 Concrete Construction Crew: SMBF Small Backfill Crew Prod: S 0.25 Eff: 100.00 Crew Hrs: 2.00 Labor PCs: 3.50 Equipment PCs: 2.00 Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT % Actual UC Total 8031 ROLLER 18-29" WALKBEHIND DBL 1.00 2.00 HR 37.47 108.10 40.50 81.00 8267 LOADER WHEEL 2.5-2.9 CUBIC Y 1.00 2.00 HR 103.25 108.10 111.61 223.22 LABORER Laborer 2.00 4.00 MH 30.49 100.00 60.60 242.40 OPER4 Operator Foreman 0.50 1.00 MH 48.00 100.00 89.27 89.27 OPERATOR Operator 1.00 2.00 MH 43.14 100.00 83.31 166.61 .•3 Raise/Collar Valve Quantity: Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 304.24 283.31 587.55 179.97 81.08 0.00 0.00 848.60 Total 304.24 283.31 587.55 179.97 81.08 0.00 0.00 848.60 Crew $/Unit Crew Hrs/Unit Units/Crew Hr $/Crew Hour Shifts Units/Shift Shifts/Unit $/Shift 767.5200 2.0000 0.5000 383.7600 0.2500 4.0000 0.2500 3,394.4000 Manhours Unit/MH MH/Unit Total Labor/MH Base Labor/Unit 8.0000 0.1250 8.0000 73.4438 304.2400 Calendar: STD Standard Hrs/Shift: 8 WC: 5221 Concrete Construction 202OTDPUDCIP Truckee Donner PUD CIP Cost Basis 03/16/2020 7:29 AM Page 29 of 35 Crew: MINIP Mini Pipe Crew Prod: S 0.25 Eff: 100.00 Crew Hrs: 2.00 Labor PCs: 4.00 Equipment PCs: 4.00 Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT % Actual UC Total 2CONC Ready -Mix Concrete 1.00 0.50 CY 150.00 108.10 162.16 81.08 8001 COMPRESSOR 155-175 CFM DIESE 1.00 2.00 HR 15.93 108.10 17.22 34.44 8016 BREAKER PAVEMENT AIR 90# 1.00 2.00 HR 8.77 108.10 9.49 18.97 8243 BACKHOE/LOADER 60-90HP 4WD 1.00 2.00 HR 50.21 108.10 54.28 108.56 8UTLPU Utility Pickup 1.00 2.00 HR 9.00 100.00 9.00 18.00 LABORER Laborer 2.00 4.00 MH 30.49 100.00 60.60 242.40 OPER4 Operator Foreman 1.00 2.00 MH 48.00 100.00 89.27 178.54 OPERATOR Operator 1.00 2.00 MH 43.14 100.00 83.31 166.61 Biditem (Non Additive) Standby Generator Takeoff Qty: 1.000 EA 170 Bid Qty: 1.000 EA Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 8,229.52 7,055.04 15,284.56 1,721.64 273,281.66 324.30 54,712.50 345,324.66 Total 8,229.52 7,055.04 15,284.56 1,721.64 273,281.66 324.30 54,712.50 345,324.66 Manhours Unit/MH MH/Unit $/MH Base Labor/MH Total Labor/MH Unit/CH 192.0000 0.0052 192.0000 1,798.5659 42.8621 79.6071 0.0179 170.1 (Non Equipment Additive)Activity: •..Quantity: Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 4,475.76 3,745.40 8,221.16 0.00 2,728.98 324.30 5,312.50 16,586.94 Total 4,475.76 3,745.40 8,221.16 0.00 2,728.98 324.30 5,312.50 16,586.94 Crew $/Unit Crew Hrs/Unit Units/Crew Hr $/Crew Hour Shifts Units/Shift Shifts/Unit $/Shift 8,221.1600 24.0000 0.0417 342.5483 3.0000 0.3333 3.0000 5,528.9800 Manhours Unit/MH MH/Unit Total Labor/MH Base Labor/Unit 96.0000 0.0104 96.0000 85.6371 4,475.7600 Calendar: STD Standard Hrs/Shift: 8 WC: 5221 Concrete Construction Crew: 4CARP 4 Man Carp Crew Prod: S 3 Eff: 100.00 Crew Hrs: 24.00 Labor PCs: 4.00 Equipment PCs: 0.00 Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT % Actual UC Total 2CONC Ready -Mix Concrete 1.10 18.70 CY 135.00 108.10 145.93 2,728.98 3FORMMTL Form Materials 1.00 120.00 SF 2.50 108.10 2.70 324.30 4REBAR Rebar 1.00 4,250.00 LB 1.25 100.00 1.25 5,312.50 CARP Carpenter - Journeyman 2.00 48.00 MH 50.50 100.00 92.14 4,422.87 CARP4 Carpenter Foreman 1.00 24.00 MH 55.00 100.00 97.66 2,343.91 LABORER Laborer 1.00 24.00 MH 30.49 100.00 60.60 1,454.38 170.2 (Non Generator..Quantity: Additive)Activity: Calendar: STD Standard Hrs/Shift: 8 WC: 5221 Concrete Construction Notes: Generator Supply includes assumed 1150 kVa genset with house and ATS Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT % Actual UC Total 2GENERATOR Generator 1.00 1.00 LS 250,000.00 108.10 270,250.00 270,250.00 170.3 (Non . ..Quantity: Additive)Activity: Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 2,087.84 1,703.50 3,791.34 853.14 302.68 0.00 4,400.00 9,347.16 Total 2,087.84 1,703.50 3,791.34 853.14 302.68 0.00 4,400.00 9,347.16 Crew $/Unit Crew Hrs/Unit Units/Crew Hr $/Crew Hour Shifts Units/Shift Shifts/Unit $/Shift 4,644.4800 16.0000 0.0625 290.2800 2.0000 0.5000 2.0000 4,673.5800 202OTDPUDCIP Truckee Donner PUD CIP Cost Basis 03/16/2020 7:29 AM Page 30 of 35 Manhours Unit/MH MH/Unit Total Labor/MH Base Labor/Unit 48.0000 0.0208 48.0000 78.9863 2,087.8400 Calendar: STD Standard Hrs/Shift: 8 WC: 5221 Concrete Construction Crew: MECHSM Small Mechanical Crew Prod: S 2 Eff: 100.00 Crew Hrs: 16.00 Labor PCs: 3.00 Equipment PCs: 2.00 Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT % Actual UC Total 2AB Anchor Bolts 1.00 8.00 EA 35.00 108.10 37.84 302.68 4CRANE Sub Crane Allowance 1.00 8.00 HR 550.00 100.00 550.00 4,400.00 8'FORK8 Reach Forklift - 8000 lb 1.00 16.00 HR 41.00 108.10 44.32 709.14 8UTLPU Utility Pickup 1.00 16.00 HR 9.00 100.00 9.00 144.00 LABORER Laborer 1.00 16.00 MH 30.49 100.00 60.60 969.58 MECHHLP Mech Helper/Oiler 1.00 16.00 MH 45.00 100.00 85.40 1,366.35 MILLWR Millwright 1.00 16.00 MH 55.00 100.00 90.96 1,455.41 Calendar: STD Standard Hrs/Shift: 8 WC: 5221 Concrete Construction Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT % Actual UC Total 4ELEC Electric - Sub 1.00 1.00 LS 45,000.00 100.00 45,000.00 45,000.00 Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 1,665.92 1,606.14 3,272.06 868.50 0.00 0.00 0.00 4,140.56 Total 1,665.92 1,606.14 3,272.06 868.50 0.00 0.00 0.00 4,140.56 Crew $/Unit Crew Hrs/Unit Units/Crew Hr $/Crew Hour Shifts Units/Shift Shifts/Unit $/Shift 4,140.5600 16.0000 0.0625 258.7850 2.0000 0.5000 2.0000 2,070.2800 Manhours Unit/MH MH/Unit Total Labor/MH Base Labor/Unit 48.0000 0.0208 48.0000 68.1679 1,665.9200 Calendar: STD Standard Hrs/Shift: 8 WC: 5221 Concrete Construction Crew: MINIP Mini Pipe Crew Prod: S 2 Eff: 100.00 Crew Hrs: 16.00 Labor PCs: 3.00 Equipment PCs: 1.00 Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT % Actual UC Total 8243 BACKHOE/LOADER 60-90HP 4WD 1.00 16.00 HR 50.21 108.10 54.28 868.50 LABORER Laborer 2.00 32.00 MH 30.49 100.00 60.60 1,939.17 OPERATOR Operator 1.00 16.00 MH 43.14 100.00 83.31 1,332.89 Biditem (Non Additive) Tank Coating Takeoff Qty: 400,000.000 GAL 180 Bid Qty: 400,000.000 GAL Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 0.03 0.02 0.05 0.02 0.00 0.05 0.25 0.37 Total 10,014.40 9,253.28 19,267.68 6,730.06 1,135.05 19,144.51 101,000.00 147,277.30 Manhours Unit/MH MH/Unit $/MH Base Labor/MH Total Labor/MH Unit/CH 296.0000 1,351.3514 0.0007 497.5584 33.8324 65.0935 3,333.3333 Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 1,519.68 1,457.96 2,977.64 911.06 0.00 0.00 0.00 3,888.70 Total 1,519.68 1,457.96 2,977.64 911.06 0.00 0.00 0.00 3,888.70 Crew $/Unit Crew Hrs/Unit Units/Crew Hr $/Crew Hour Shifts Units/Shift Shifts/Unit $/Shift 3,888.7000 16.0000 0.0625 243.0438 2.0000 0.5000 2.0000 1,944.3500 Manhours Unit/MH MH/Unit Total Labor/MH Base Labor/Unit 202OTDPUDCIP Truckee Donner PUD CIP Cost Basis 03/16/2020 7:29 AM Page 31 of 35 48.0000 0.0208 48.0000 62.0342 1,519.6800 Calendar: STD Standard Hrs/Shift: 8 WC: 5221 Concrete Construction Crew: LAB4 4 Man Labor Crew Prod: S 2 Eff: 100.00 Crew Hrs: 16.00 Labor PCs: 3.00 Equipment PCs: 3.00 Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT % Actual UC Total 8088 GENERATOR 19-29 KVA 1.00 16.00 HR 36.01 108.10 38.93 622.83 8205 PUMP 2" ELECTRIC SUBMERSIBLE 1.00 16.00 HR 8.34 108.10 9.01 144.23 8UTLPU Utility Pickup 1.00 16.00 HR 9.00 100.00 9.00 144.00 LAB4 Labor Foreman 1.00 16.00 MH 34.00 100.00 64.90 1,038.47 LABORER Laborer 2.00 32.00 MH 30.49 100.00 60.60 1,939.17 Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 6,078.72 5,831.85 11,910.57 5,459.00 0.00 19,144.51 0.00 36,514.08 Total 6,078.72 5,831.85 11,910.57 5,459.00 0.00 19,144.51 0.00 36,514.08 Crew $/Unit Crew Hrs/Unit Units/Crew Hr $/Crew Hour Shifts Units/Shift Shifts/Unit $/Shift 17,369.5700 64.0000 0.0156 271.3995 8.0000 0.1250 8.0000 4,564.2600 Manhours Unit/MH MH/Unit Total Labor/MH Base Labor/Unit 192.0000 0.0052 192.0000 62.0342 6,078.7200 Calendar: STD Standard Hrs/Shift: 8 WC: 5221 Concrete Construction Crew: LAB4 4 Man Labor Crew Prod: S 8 Eff: 100.00 Crew Hrs: 64.00 Labor PCs: 3.00 Equipment Pcs: 3.00 Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT % Actual UC Total 3BLASTSAND Blast Sand Media 1.00 450.00 BAG 35.00 108.10 37.84 17,025.75 3SANDPOT Sandblasing Pot 1.00 8.00 DAY 245.00 108.10 264.85 2,118.76 8*BOOM45 45' Boomlift 1.00 64.00 HR 31.00 108.10 33.51 2,144.70 8005 COMPRESSOR 350-450 CFM 150 P 1.00 64.00 HR 39.58 108.10 42.79 2,738.30 8UTLPU Utility Pickup 1.00 64.00 HR 9.00 100.00 9.00 576.00 LAB4 Labor Foreman 1.00 64.00 MH 34.00 100.00 64.90 4,153.89 LABORER Laborer 2.00 128.00 MH 30.49 100.00 60.60 7,756.68 Additive)Activity: 180.3 (Non .. . .Quantity: Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 1,600.00 1,221.76 2,821.76 144.00 864.80 0.00 1,000.00 4,830.56 Total 1,600.00 1,221.76 2,821.76 144.00 864.80 0.00 1,000.00 4,830.56 Crew $/Unit Crew Hrs/Unit Units/Crew Hr $/Crew Hour Shifts Units/Shift Shifts/Unit $/Shift 2,965.7600 16.0000 0.0625 185.3600 2.0000 0.5000 2.0000 2,415.2800 Manhours Unit/MH MH/Unit Total Labor/MH Base Labor/Unit 32.0000 0.0313 32.0000 88.1800 1,600.0000 Calendar: STD Standard Hrs/Shift: 8 WC: 5221 Concrete Construction Crew: MECHSM Small Mechanical Crew Prod: S 2 Eff: 100.00 Crew Hrs: 16.00 Labor Pcs: 2.00 Equipment PCs: 1.00 Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT % Actual UC Total 2MISCMTL Misc Materials 1.00 1.00 LS 800.00 108.10 864.80 864.80 4WELD Welding Sub 1.00 8.00 HR 125.00 100.00 125.00 1,000.00 8UTLPU Utility Pickup 1.00 16.00 HR 9.00 100.00 9.00 144.00 MECHHLP Mech Helper/Oiler 1.00 16.00 MH 45.00 100.00 85.40 1,366.35 MILLWR Millwright 1.00 16.00 MH 55.00 100.00 90.96 1,455.41 Additive)Activity: 180.4 (Non ..Quantity: 1 Unit: LS Calendar: STD Standard Hrs/Shift: 8 WC: 5221 Concrete Construction Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT % Actual UC Total 4PAINT Paint Coatings Sub 1.00 3,500.00 SF 20.00 100.00 20.00 70,000.00 202OTDPUDCIP Truckee Donner PUD CIP Cost Basis 03/16/2020 7:29 AM Page 32 of 35 :05 (Non Additive). . . Calendar: STD Standard Hrs/Shift: 8 WC: 5221 Concrete Construction Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT % Actual UC Total 4NACETEST NACE Testing QA/QC 1.00 10.00 DAY 2,500.00 100.00 2,500.00 25,000.00 i6 (Non Additive).Quantity: Calendar: STD Standard Hrs/Shift: 8 WC: 5221 Concrete Construction Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT % Actual UC Total 4PAINT Paint Coatings Sub 1.00 250.00 SF 20.00 100.00 20.00 5,000.00 :07 (Non Additive).Quantity: 1 Unit: LS Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 816.00 741.71 1,557.71 216.00 270.25 0.00 0.00 2,043.96 Total 816.00 741.71 1,557.71 216.00 270.25 0.00 0.00 2,043.96 Crew $/Unit Crew Hrs/Unit Units/Crew Hr $/Crew Hour Shifts Units/Shift Shifts/Unit $/Shift 1,773.7100 24.0000 0.0417 73.9046 3.0000 0.3333 3.0000 681.3200 Manhours Unit/MH MH/Unit Total Labor/MH Base Labor/Unit 24.0000 0.0417 24.0000 64.9046 816.0000 Calendar: STD Standard Hrs/Shift: 8 WC: 5221 Concrete Construction Crew: LAB4 4 Man Labor Crew Prod: S 3 Eff: 100.00 Crew Hrs: 24.00 Labor PCs: 1.00 Equipment Pcs: 1.00 Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT % Actual UC Total 2MISCMTL Misc Materials 1.00 1.00 LS 250.00 108.10 270.25 270.25 8UTLPU Utility Pickup 1.00 24.00 HR 9.00 100.00 9.00 216.00 LAB4 Labor Foreman 1.00 24.00 MH 34.00 100.00 64.90 1,557.71 Biditem (Non Additive) Street Reconstruction 190 TakeoffQty: 10,000.000 SF Bid Qty: 10,000.000 SF Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 0.33 0.31 0.64 0.41 2.02 0.01 2.49 5.56 Total 3,265.52 3,100.99 6,366.51 4,084.31 20,160.65 108.10 24,875.00 55,594.57 Manhours Unit/MH MH/Unit $/MH Base Labor/MH Total Labor/MH Unit/CH 88.8000 112.6126 0.0089 626.0650 36.7739 71.6949 625.0000 Activity: 190.1 (Non Additive) AC Paving Quantity: 10000 Unit: SF Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U. Cost 0.25 0.24 0.49 0.40 2.02 0.00 0.26 3.17 Total 2,534.64 2,371.06 4,905.70 4,012.31 20,160.65 0.00 2,625.00 31,703.66 Crew $/Unit Crew Hrs/Unit Units/Crew Hr $/Crew Hour Shifts Units/Shift Shifts/Unit $/Shift 0.7215 0.0008 1,250.0000 901.9163 1.0000 10,000.0000 0.0001 31,703.6600 Manhours Unit/MH MH/Unit Total Labor/MH Base Labor/Unit 64.8000 154.3210 0.0065 75.7052 0.2535 Calendar: STD Standard Hrs/Shift: 8 WC: 5221 Concrete Construction Crew: BKFL Backfill Crew Prod: S 1 Eff: 100.00 Crew Hrs: 8.00 Labor PCs: 8.10 Equipment PCs: 5.00 Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT % Actual UC Total 2A ASPHALT 1.05 262.50 TON 68.00 108.10 73.51 19,295.85 2TACKCOAT Tack Coat 1.00 10,000.00 SF 0.08 108.10 0.09 864.80 4HAUL Hauling - Sub 1.00 262.50 TON 10.00 100.00 10.00 2,625.00 202OTDPUDCIP Truckee Donner PUD CIP Cost Basis 03/16/2020 7:29 AM Page 33 of 35 8036 ROLLER 50-56" VIB SINGLE DRU 2.00 16.00 HR 74.23 108.10 80.24 1,283.86 8243 BACKHOE/LOADER 60-90HP 4WD 1.00 8.00 HR 50.21 108.10 54.28 434.25 8324 TRUCK WATER 2000-2999 GALLON 1.00 8.00 HR 60.07 108.10 64.94 519.52 8BITCHPOT Bitch Pot 1.00 8.00 HR 35.00 108.10 37.84 302.68 8PAVER AC Paver 1.00 8.00 HR 175.00 100.00 175.00 1,400.00 8UTLPU Utility Pickup 1.00 8.00 HR 9.00 100.00 9.00 72.00 LABORER Laborer 3.00 24.00 MH 30.49 100.00 60.60 1,454.38 OPER4 Operator Foreman 1.10 8.80 MH 48.00 100.00 89.27 785.55 OPERATOR Operator 4.00 32.00 MH 43.14 100.00 83.31 2,665.77 Activity: 190.2 (Non Additive) Striping Et Signage Quantity: 0.52 Unit: LS Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 0.00 0.00 0.00 0.00 0.00 0.00 6,730.77 6,730.77 Total 0.00 0.00 0.00 0.00 0.00 0.00 3,500.00 3,500.00 Calendar: STD Standard Hrs/Shift: 8 WC: 5221 Concrete Construction Notes: Assume approx 50% of all trench will require re -striping Resource Description PCs/Wste Quantity Unit Unit Cost Tax/OT % Actual UC Total 4SIG N Signage 1.00 2.00 EA 750.00 100.00 750.00 1,500.00 4STRIPE Striping - Sub 1.00 2,000.00 LF 1.00 100.00 1.00 2,000.00 Activity: 190.3 (Non Additive) AC Milling Quantity: 10000 Unit: SF Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 0.00 0.00 0.00 0.00 0.00 0.00 1.88 1.88 Total 0.00 0.00 0.00 0.00 0.00 0.00 18,750.00 18,750.00 Calendar: STD Standard Hrs/Shift: 8 WC: 5221 Concrete Construction Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT % Actual UC Total 4HAUL Hauling - Sub 1.00 250.00 TON 15.00 100.00 15.00 3,750.00 4MILL Asphalt Milling Sub 1.00 10,000.00 SF 1.50 100.00 1.50 15,000.00 Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 1,405.54 1,403.71 2,809.25 138.46 0.00 207.88 0.00 3,155.60 Total 730.88 729.93 1,460.81 72.00 0.00 108.10 0.00 1,640.91 Crew $/Unit Crew Hrs/Unit Units/Crew Hr $/Crew Hour Shifts Units/Shift Shifts/Unit $/Shift 2,947.7115 15.3846 0.0650 191.6013 1.0000 0.5200 1.9231 1,640.9100 Manhours Unit/MH MH/Unit Total Labor/MH Base Labor/Unit 24.0000 0.0217 46.1538 60.8671 1,405.5385 Calendar: STD Standard Hrs/Shift: 8 WC: 5221 Concrete Construction Crew: LAB4 4 Man Labor Crew Prod: S 1 Eff: 100.00 Crew Hrs: 8.00 Labor PCs: 3.00 Equipment PCs: 1.00 Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT % Actual UC Total 3TCMTL Traffic Control Materials 1.00 1.00 DAY 100.00 108.10 108.10 108.10 8UTLPU Utility Pickup 1.00 8.00 HR 9.00 100.00 9.00 72.00 FLAG Flagger 2.00 16.00 MH 28.68 100.00 58.85 941.58 LAB4 Labor Foreman 1.00 8.00 MH 34.00 100.00 64.90 519.23 Biditem General Account 990001 Bid Qty: 1.000 LS Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total 202OTDPUDCIP Truckee Donner PUD CIP Cost Basis 03/16/2020 7:29 AM Page 34 of 35 U.Cost 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Total 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Activity: 99 CONTINGENCY Quantity: 1 Unit: LS Calendar: Code not found. Hrs/Shift: 8 WC: Code not found. Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT % Actual UC Total 8224*TD Contingency 1.00 337,954.90 TDC$ 0.00 108.10 0.00 0.00 Activity: 999 PROJECT SUPPORTQuantity: 1 Unit: LS Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Total 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Calendar: Code not found. Hrs/Shift: 8 WC: Code not found. Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT % Actual UC Total 4*CRANESUB Crane Subcontractor 1.00 0.00 HR 500.00 100.00 0.00 0.00 4*QAQC QA/QC Testing 1.00 0.00 LS 0.00 100.00 0.00 0.00 4*SURVEY Land Surveyor 1.00 0.00 HR 165.00 100.00 0.00 0.00 5*CRANE-CRAW Crawler Crane 1.00 0.00 HR 400.00 100.00 0.00 0.00 5*CRANE-HYDR Hydrolic Crane 1.00 0.00 HR 200.00 100.00 0.00 0.00 8*BOOM45 45' Boomlift 1.00 0.00 HR 31.00 108.10 0.00 0.00 8*FORK10 Reach Forklift - 10000 lb 1.00 0.00 HR 47.00 108.10 0.00 0.00 8*FORK8 Reach Forklift - 8000 lb 1.00 0.00 HR 41.00 108.10 0.00 0.00 8*SHOPLIFT Shop Forklift 1.00 0.00 HR 26.00 108.10 0.00 0.00 OPERATOR Operator 1.00 0.00 MH 43.14 100.00 0.00 0.00 RIGGER Crane Rigger 1.00 0.00 MH 48.00 100.00 0.00 0.00 Activity: 9999 MOB/DEMOB Quantity: 1 Unit: LS Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Total 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Calendar: Code not found. Hrs/Shift: 8 WC: Code not found. Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT % Actual UC Total 4*9AXL 9 axe[ Heavy Equipment Trans 1.00 0.00 HR 175.00 100.00 0.00 0.00 4*TRUCKING Flat bed material transport 1.00 0.00 HR 110.00 100.00 0.00 0.00 Activity: 9 GENERAL CONDITIONS Quantity: 1 Unit: LS Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Total 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Calendar: Code not found. Hrs/Shift: 8 WC: Code not found. Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT % Actual UC Total 1*ADMIN Project Ad min 1.00 0.00 MO 6,000.00 110.00 0.00 0.00 1*APM Assistant PM 1.00 0.00 MO 12,000.00 110.00 0.00 0.00 1*PE Project Engineer 1.00 0.00 MO 8,000.00 110.00 0.00 0.00 1*PM Project Manager 1.00 0.00 MO 14,000.00 110.00 0.00 0.00 1*SAFETY Safety Professional 1.00 0.00 MO 8,000.00 110.00 0.00 0.00 1*SUPT Project Superintendent 1.00 0.00 MO 13,000.00 110.00 0.00 0.00 1*TRADESUPT Trade Superintendent 1.00 0.00 MO 10,000.00 110.00 0.00 0.00 3*AIRPHOTO Aerial Photography 1.00 0.00 EA 2,000.00 108.10 0.00 0.00 3*COMPUTER Computer Cost 1.00 0.00 EA 2,500.00 108.10 0.00 0.00 3*CONEX Conex storage box 1.00 0.00 MO 150.00 108.10 0.00 0.00 3*COPIER Office Copier 1.00 0.00 MO 250.00 108.10 0.00 0.00 2020TDPUDCIP Truckee Donner PUD CIP Cost Basis 03/16/2020 7:29 AM Page 35 of 35 3*DH SMALL TOOLS Et SAFETY SUPPLIE 1.00 817.20 LBHR 0.00 108.10 0.00 0.00 3*DUMPSTER Dumpster 1.00 0.00 EA 500.00 108.10 0.00 0.00 3*MAIL/FEDEX Mail/ Fedex/ Postage 1.00 0.00 MO 250.00 108.10 0.00 0.00 3*OFFICE Project Office - Per Single 1.00 0.00 MO 800.00 108.10 0.00 0.00 3*OFFICESUP Office Supplies 1.00 0.00 MO 400.00 108.10 0.00 0.00 3*PHOTOS Jobsite Photos 1.00 0.00 MO 100.00 108.10 0.00 0.00 3*PRINT Printing Et Copying Service 1.00 0.00 MO 250.00 108.10 0.00 0.00 3*SNOWREMOVE Snow Removal 1.00 0.00 MO 350.00 108.10 0.00 0.00 3*TC Gross Receipts Tax 1.00 337,954.90 TOT$ 0.00 108.10 0.00 0.00 3*TD Builders Risk INsurance 1.00 337,954.90 TDC$ 0.00 108.10 0.00 0.00 3*TEMPELESET Temp Electrical Setup 1.00 0.00 LS 1,000.00 108.10 0.00 0.00 3*TEMPELEUSE Temp Electric Use 1.00 0.00 MO 200.00 108.10 0.00 0.00 3*TEMPFENCE Temp Fence 1.00 0.00 LF 2.00 108.10 0.00 0.00 3*TEMPH2OSET Temp Water Setup 1.00 0.00 LS 1,000.00 108.10 0.00 0.00 3*TEMPH2OUSE Temp Water Usage 1.00 0.00 KGAL 3.00 108.10 0.00 0.00 3*TEMPHEAT Temp Heat 1.00 0.00 GAL 5.00 108.10 0.00 0.00 3*TEMPTOILET Temp Toilets 1.00 0.00 MO 125.00 108.10 0.00 0.00 3*WINTERPRO Winter Protection 1.00 0.00 CY 3.00 108.10 0.00 0.00 8*PICKUP Admin Pickup 1.00 0.00 MO 1,100.00 108.10 0.00 0.00 9*PERMITS Permit Fees 1.00 0.00 LS 500.00 100.00 0.00 0.00 Report Summary Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total Total 30,103 28,393 58,496 30,457 228,231 1,630 19,141 337,955 Job Notes Estimate created on: 03/18/2018 by User#: 0 - Source estimate used: C:\HEAVYBID\EST\ESTMAST ************Estimate created on: 06/17/2019 by User#: 0 - Source estimate used: C:\HEAVYBID\EST\ESTMASTNV ************Estimate created on: 01 /09/2020 by User#: 0 - Source estimate used: C:\HEAVYBID\EST\2019MSTPWNV ************Estimate created on: 03/04/2020 by User#: 0 - Source estimate used: C:\HEAVYBID\EST\2020MSTRNV-W Calendars Used In Estimate STD Standard