Loading...
HomeMy WebLinkAbout16 Power Point Workshop 2020 Water Rate Study September 2, 2020 Water Utility Rate Study 2020 WORKSHOP ITEM #16 •BACKGROUND / HISTORYBACKGROUND / HISTORY Water Utility Rate Study 2020Water Utility Rate Study 2020 water rates01 setting the current -In 2015 the Board adopted Ordinance 2015•Updates on the Water Rate Study 2020•Review the public process for the adoption of water utility rates •Workshop Item •BACKGROUND / HISTORYBACKGROUND / HISTORY Water Utility Rate Study 2020Water Utility Rate Study 2020 Majority protest provision•Public Hearing •Notification•esigndate rbased -proportional, costReasonable, •Procedural requirements•Property related fees•Effective 1997•The Right to Vote on Taxes Act•California Proposition 218 •BACKGROUND / HISTORYBACKGROUND / HISTORY Water Utility Rate Study 2020Water Utility Rate Study 2020 Water Utility Rate Study 2020–HDR Engineering •Improvement Plan (CIP) year Capital -Water Infrastructure 10–Farr West Engineering •two consulting firmsBoard, the District has secured professional services contracts with In preparation for the proposed new water rates and adoption by the •BACKGROUND / HISTORYBACKGROUND / HISTORY Water Utility Rate Study 2020Water Utility Rate Study 2020 Identified an annual capital improvement budget of $7M•Repair and replacement of aging infrastructure•New water pipelines for system redundancy•Harden emergency power supply reliability•year outlook for capital investments-Provided a 10•Presented to the Board May, 20, 2020•Plan (CIP) year Capital Improvement -Water Infrastructure 10–Farr West Engineering •BACKGROUND / HISTORYBACKGROUND / HISTORY Water Utility Rate Study 2020Water Utility Rate Study 2020 Evaluate rate structure•expectationsrise in costs exceeding that of inflationary ontinuing C•Concerns with CA unfunded mandates•year CIP-Utilize the updated Water Utility Infrastructure 1•Cost of service analysis•Water Utility Rate Study 2020–HDR Engineering •NEW INFORMATIONNEW INFORMATION Water Utility Rate Study 2020Water Utility Rate Study 2020 with HDR EngineeringWater Utility Rate Study 2020 update provided by Mr. Shawn Koorn •NEW INFORMATIONNEW INFORMATION Water Utility Rate Study 2020Water Utility Rate Study 2020 2020Rates become effective first billing cycle after January 1, –January 2020 •adopt ordinance setting new water utility ratesHold public hearing regarding proposed water rates and –December 2, 2020 •hearingNotification and advertisement of scheduled public –October to November •and schedule a public hearingReview proposed rate structure, approve new water rates –October 7, 2020 •Workshop to review the water rate study (this evening)–September 2, 2020 •Proposed calendar for adoption of new water utility rates •FISCAL IMPACTFISCAL IMPACT Water Utility Rate Study 2020Water Utility Rate Study 2020 next stepsFeedback and direction from the Board will be utilized to facilitate the •There is no direct fiscal impact associated with this workshop item •RECOMMENDATIONRECOMMENDATION Water Utility Rate Study 2020Water Utility Rate Study 2020 Provide input and direction on the water rate study