Loading...
HomeMy WebLinkAbout6 Emergency Procurement_Attachment 2Quote No: Q202042 Date: Loomis, CA 95650 (775)741‐4012 Shipping: N/A Aaron.Stone@norcalpowerservices.com Terms: Net 30 TRUCKEE DONNER P.U.D. ‐ MARTIS VALLEY SUBSTATION 115KV BUSHING REPLACEMENT Customer:Sanna Schlosser Ship to:Truckee Donner P.U.D. Truckee Donner P.U.D. Martis Valley Substation 11570 Donner Pass Rd. 10958 River View Dr. Truckee, CA 96161 Truckee, CA 96161 (530) 582‐3945 sannaschlosser@tdpud.org Net Extended Line Qty UOM Description Tax Price Price X                                                                                          Approver (print)Subtotal: 66,207.20$   Tax:0.00 X                                                                                         _________________Total: 66,207.20$   Approver (sign) Date SOW: Qty(4) General Electric 5000kVA Oil Filled Transformer Provide qty(8) new like kind replacement bushings Receive new bushings and test prior to installation Provide new gasket material for new bushings Remove old drawlead bushings and install new drawlead bushings NCPS will rig the new bushings, TDPUD to provide crane and operator After new bushings are installed, perform the following tests on the new bushings and the transformers Overall winding power factor Bushing power factor C1 test Bushing power factor C2 test Winding resistance Insulation resistance ‐TDPD to supply a properly rated crane and operator for removal and installation of all bushing. ‐This quote does not include any extra parts or material for any apparatus above other than what is included in this quote. If any additional parts or material are deemed necessary, a separate quote can be provided. ‐NCPS will not perform any energized switching.  If energized switching is requested, a price can be provided. ‐NCPS will provide (as needed)  ground bridals, generators, test equipment, cleaning equipment, LOTO locks, PPE. Quotation 11/9/2020 11 JOB Perform 115kV bushing removal and installation on Qty(4) single phase xfmr's Total of 8 bushings to be replaced.14,480.00 6,465.90 51,727.20STYLE # 115W0800AA.  Factory quoted lead time is 1 ‐ 2 weeks ARO. 14,480.00 28EACHABB TYPE O PLUS C 115KV BUSHING TBD NCPS NorCal  Power Services Page 1 of 1