Loading...
HomeMy WebLinkAbout10 Attachment 5 Personnel FTE and OrgChart BudgetPOSITIONS by DEPARTMENT 2021 2022 2023 ELECTRIC OPERATIONS 1.00 1.00 1.00 Electric Utility Director 1.00 1.00 1.00 Electric Engineering Manager 2.00 2.00 2.00 Electric Engineer 1.00 1.00 1.00 Electric Operations Manager 1.00 1.00 1.00 Assistant Electric Operations Manager 2.00 3.00 3.00 Foreman, Power Services 1.00 Foreman, Service Crew 1.00 1.00 1.00 Foreman, Electricians 3.00 1.50 1.00 Electrician/Meter Technician (A) 1.00 1.00 1.00 Meter Read/Utility/WMP 1.00 2.00 2.00 Substation Lineman/Inspector 2.00 2.00 Troubleman 1.00 Lead Lineman 7.00 9.00 9.00 Journeyman Linemen 3.00 Apprentice Linemen Standby/Overtime Compensation Study Factor 26.00 25.50 25.00 FTE Total (0.50)(0.50)FTE Change 3,777,435$4,024,953$4,081,997$Payroll Dollars 247,518$57,044$Change, Dollars 6.6%1.4%Change, Percentage WATER OPERATIONS 1.00 1.00 1.00 Water Utility Director 1.00 1.00 1.00 Water System Engineer 1.00 1.00 1.00 Water Operations Manager 1.00 1.00 1.00 Water SR Quality Inspector 2.00 2.00 2.00 Water Foremen 2.00 2.00 2.00 Water Leadmen 5.00 7.00 7.00 Water Service Technicians 2.00 --Water Service Technicians - in Training 1.00 1.00 Water Helper I (two part-time, summer) (non-benefited) 1.00 1.00 P&M Controls Electrician (position from Electric Ops) 1.00 1.00 Maintenance Program Lead Standby/Overtime Compensation Study Factor 15.00 18.00 18.00 FTE Total 3.00 -FTE Change 1,893,141$2,388,686$2,457,912$Payroll Dollars 495,545$69,226$Change, Dollars 26.2%2.9%Change, Percentage ELECTRIC OPERATIONS BUDGETED POSITIONS BY HOME DEPARTMENT Before any allocations to other Departments, Capital, and or Overhead(s) Budget FTE and Dollars TDPUD Budget FY2022 and FY2023 (Draft 11/3/2021) Full Time Equivalents (FTE) Payroll Dollars (base pay, including paid time off) WATER OPERATIONS (A) Workload and classificaiton of additional FTE under review. Staff to bring a recommended budget adjustment to Board 10/29/2021 9:39 AM Appendices APPENDIX 5 8A5 Personnel FTE- Page 1 of 4 8A5 - Page 1 of 9 POSITIONS by DEPARTMENT BUDGETED POSITIONS BY HOME DEPARTMENT Before any allocations to other Departments, Capital, and or Overhead(s) Budget FTE and Dollars TDPUD Budget FY2022 and FY2023 (Draft 11/3/2021) Full Time Equivalents (FTE) Payroll Dollars (base pay, including paid time off) GENERAL MANAGEMENT 1.00 1.00 1.00 General Manager 1.00 1.00 1.00 District Clerk / Executive Assistant 1.00 1.00 1.00 Public Information & Strategic Affairs Director 1.00 1.00 1.00 Contract Administrator 1.00 1.00 1.00 Record Coordinator/Tech 1.00 1.00 1.00 Administrative Tech -1.00 1.00 Communications Coordinator -1.00 1.00 Human Resources Director -1.00 1.00 Risk & Compliance Coordinator -Compensation Study Factor 6.00 9.00 9.00 FTE Total 3.00 -FTE Change 793,139$1,192,853$1,213,977$Payroll Dollars 399,713$21,124$Change, Dollars 50.4%1.8%Change, Percentage ADMINISTRATIVE SERVICES 1.00 --Business Operations Manager, HR & Risk Manager -1.00 1.00 Chief Financial Officer 1.00 1.00 1.00 Finance & Accounting Manager 1.00 --Senior Accountant/Accounting Analyst 1.00 1.00 1.00 General Accounting Supervisor 1.00 1.00 1.00 Work Order Accounting Supervisor 1.00 1.00 1.00 Work Order Clerk -1.00 1.00 Accounting Specialist Lead 1.00 1.00 1.00 Acg Specialist - Payroll and Accounts Payable Clerk 1.00 1.00 1.00 Buyer/Clerk 1.00 1.00 1.00 Warehouse/Utility Worker 1.00 1.00 1.00 Customer Services Manager 1.00 1.00 1.00 Customer Billing and CSR Supervisor 1.00 1.00 1.00 Billing Clerk 1.00 --Conservation Specialist (position moved to Conservation Dept for B'22 '23) 4.00 4.00 4.00 Customer Service Representatives (4) Overtime Compensation Study Factor 17.00 16.00 16.00 FTE Total (1.00)-FTE Change 1,601,193$1,510,602$1,555,846$Payroll Dollars (90,591)$45,244$Change, Dollars -5.7%3.0%Change, Percentage GENERAL MANAGEMENT ADMINISTRATIVE SERVICES 10/29/2021 9:39 AM Appendices APPENDIX 5 8A5 Personnel FTE- Page 2 of 4 8A5 - Page 2 of 9 POSITIONS by DEPARTMENT BUDGETED POSITIONS BY HOME DEPARTMENT Before any allocations to other Departments, Capital, and or Overhead(s) Budget FTE and Dollars TDPUD Budget FY2022 and FY2023 (Draft 11/3/2021) Full Time Equivalents (FTE) Payroll Dollars (base pay, including paid time off) GENERAL SERVICES 1.00 1.00 General Services Manager 1.00 1.00 Facilities Maintenance Foreman 1.00 1.00 1.00 Facilities Maintenance Coordinator 1.00 1.00 1.00 Vehicle Mechanic Foreman 1.00 1.00 Vehicle Mechanic Standby/Overtime Compensation Study Factor 2.00 5.00 5.00 FTE Total 3.00 -FTE Change 214,918$546,596$564,327$Payroll Dollars 331,678$17,731$Change, Dollars 154.3%3.2%Change, Percentage CONSERVATION 1.00 1.00 1.00 Program Manager, CSR & Conservation -1.00 1.00 Conservation Specialist (positiong moved from AdminSvcs Dept for B'22 '23) ---Overtime ---Compensation Study Factor 1.00 2.00 2.00 FTE Total 1.00 -FTE Change 114,598$204,943$209,351$Payroll Dollars 90,346$4,408$Change, Dollars 78.8%2.2%Change, Percentage IT/GIS 1.00 1.00 1.00 IT Director/CIO 1.00 1.00 1.00 IT/SCADA Engineer 1.00 1.00 1.00 Network & System Administrator 1.00 1.00 1.00 GIS Coordinator 1.00 1.00 1.00 Data Analyst & Administrator 1.00 1.00 1.00 IT Security & Applications Manager Compensation Study Factor 6.00 6.00 6.00 FTE Total --FTE Change 870,559$908,532$917,446$Payroll Dollars 37,973$8,914$Change, Dollars 4.4%1.0%Change, Percentage CONSERVATION IT/GIS GENERAL SERVICES 10/29/2021 9:39 AM Appendices APPENDIX 5 8A5 Personnel FTE- Page 3 of 4 8A5 - Page 3 of 9 POSITIONS by DEPARTMENT BUDGETED POSITIONS BY HOME DEPARTMENT Before any allocations to other Departments, Capital, and or Overhead(s) Budget FTE and Dollars TDPUD Budget FY2022 and FY2023 (Draft 11/3/2021) Full Time Equivalents (FTE) Payroll Dollars (base pay, including paid time off) DISTRICT TOTAL (excluding Board of Directors) 73.00 81.50 81.00 FTE Total 8.50 (0.50)FTE Change 9,264,983$10,777,165$11,000,856$Payroll Dollars 1,512,183$223,691$Change, Dollars 16.3%2.1%Change, Percentage DISTRICT TOTAL (excluding Board of Directors) 10/29/2021 9:39 AM Appendices APPENDIX 5 8A5 Personnel FTE- Page 4 of 4 8A5 - Page 4 of 9 ###### Legislative and Regulatory Electric Utility Director Water Utility Director Information Technology Director Chief Financial Officer Affairs, and PIO Director 25.5 FTE(FY22) 25.0 FTE (FY23) 18 FTE 2 FTE See Page 2 for details. See Page 3 for details.See Page 5 for details.See Page 5 for details.See Page 5 for details. See Page 4 for details. Employee Full Time Equivalents (FTE) 81.5 Total FTE for 2022 Budget 81.0 Total FTE for 2023 Budget Elected Officials Appointed Officials - Current (no change forecasted for 2022/2023) Board President Christa Finn (2018-2022)Treasurer Michael R. Salmon Vice President Tony Laliotis (2018-2022)District Clerk Shanna Kuhlemier Board of Director Jeff Bender (2020-2024)General Manager Brian Wright Board of Director Joe Aguera (2020-2024) Board of Director Kim Harris (2020-2024) 1 FTE Electric (14,500 customers) Legal CounselAuditors Water (13,500 customers) Terms for directors run December of starting year through December of even years, four year terms. Customers / Community Board of Directors Elected Officials (5) Truckee Donner Public Utility District FY '2021 (Term) List of Elected and Appointed Officials Organization Chart for Budget 2022 and 2023 23 FTE See Page 5 for details. Human Resources Director 2 FTE District Clerk / Executive Assistant 6 FTE 4 FTE General Manager 10/29/2021 9:44 AM I:\BUDGET\CYB\BoardDocs\OrgChart for Budget 8A5 OrgChart - Page 1 of 5 8A5 - Page 5 of 9 Organization Chart for Budget 2022 and 2023 (version 11/3/2021) ELECTRIC OPERATIONS B22 B23 Unrepresented 6.0 6.0 Represented 19.5 19.0 FTE Total 25.5 25.0 Electric Utility Director 1FTE Assistant Electric Operations Manager 1FTE Electric Operations Manager 1 FTE Electric Engineering Manager 1 FTE Senior Elecric Engineer 1 FTE Troubeman 2 FTE R Foreman, Electrician 1FTE R Foreman, Power Services 3 FTE R Journeyman Lineman 9 FTE R Electrician 1.5 FTE - 2022 1.0 FTE - 2023 R ----------------------- Currently 2.0 FTE - the work load forecasted and resulting FTE requirement is actively being reviewed Substation Lineman/Inspector 2 FTE R Meter Reader/Utility/WMP 1 FTE R Elecric Engineer I/II 1 FTE 10/29/2021 9:44 AM I:\BUDGET\CYB\BoardDocs\OrgChart for Budget 8A5 OrgChart - Page 2 of 5 8A5 - Page 6 of 9 Organization Chart for Budget 2022 and 2023 (version 11/3/2021) WATER OPERATIONS B22 B23 Unrepresented 3.0 3.0 Represented 15.0 15.0 FTE Total 18.0 18.0 Water Utility Director 1 FTE Senior Quality Inspector 1 FTE R Water Operations Manager 1 FTE Water System Engineer 1 FTE P&M Controls Electrician 1 FTE R Foreman, Water 2 FTE R Water Leadmen 2 FTE R Maintenannce Program Lead 1 FTE R Water Service Technician 7 FTE R Water Helper (Seasonal, non-benefit) (2p) 1.0 FTE R 10/29/2021 9:44 AM I:\BUDGET\CYB\BoardDocs\OrgChart for Budget 8A5 OrgChart - Page 3 of 5 8A5 - Page 7 of 9 Organization Chart for Budget 2022 and 2023 (version 11/3/2021) Chief Financial Officer B22 B23 Unrepresented 5.0 5.0 Represented 18.0 18.0 FTE Total 23.0 23.0 Chief Financial Officer 1 FTE Work Order Supervisor 1 FTE R General Accounting Supervisor 1 FTE R Finance & Accounting Manager 1 FTE Buyer 1 FTE R Accounting Specialist Lead 1 FTE R Accounting Specialist 1 FTE R Work Order Specialist 1 FTE R Facilities Maintance Foreman 1 FTE R Vehicle Mechanic 1 FTE R Warehouse/Utility Clerk 1 FTE R Customer Service Manager 1 FTE Customer Billing and CSR Superisor 1 FTE R Customer Service Representative 4 FTE R Billing Clerk 1 FTE R General Services Manager 1 FTE Vehicle Maintenance Foreman 1 FTE R Facilites Maintenance Coordinator 1 FTE R Conservation Program Manager 1 FTE Conservation Specialist (and CSR assist) 1 FTE R 10/29/2021 9:44 AM I:\BUDGET\CYB\BoardDocs\OrgChart for Budget 8A5 OrgChart - Page 4 of 5 8A5 - Page 8 of 9 Organization Chart for Budget 2022 and 2023 (version 11/3/2021) GENERAL MANAGER AND OTHER DIRECTORS B22 B23 Unrepresented 12.0 12.0 Represented 3.0 3.0 this chart does not reflect all GM direct reports, FTE Total 15.0 15.0 refer to Page 1 for GM direct report information GENERAL MANAGER 1 FTE Records Coordinator/Tech 1FTE R Contract Administrator 1 FTE R District Clerk / Excutive Assistant 1 FTE Administrative Tech 1 FTE R IT Security & Applications Manager 1 FTE GIS Coordinator 1 FTE Human Resources Director 1 FTE Risk & Compliance Coordinator 1 FTE Information Technology (IT) Director 1 FTE Network and Systems Administrator 1 FTE Stategic Affairs, L&R, PIO Director 1 FTE Communications Specialist 1 FTE Data Analyst 1 FTE IT/SCADA Engineer 1 FTE 10/29/2021 9:44 AM I:\BUDGET\CYB\BoardDocs\OrgChart for Budget 8A5 OrgChart - Page 5 of 5 8A5 - Page 9 of 9