Loading...
HomeMy WebLinkAbout11 Closeout Pipeline Project AGENDA ITEM # 11 Page 1 of 2 MEETING DATE: November 3, 2021 TO: Board of Directors FROM: Neil Kaufman SUBJECT: Final Closeout of the District Pipeline Replacement – 2021 Construction Contract APPROVED BY______________________________ Brian C. Wright, Interim General Manager RECOMMENDATION: Adopt Resolution 2021-19 accepting the District Pipeline Replacement – 2021 project as complete and authorize the filing of the Notice of Completion. BACKGROUND: In March 2021, the Board awarded the construction contract for the District Pipeline Replacement – 2021 project to Rapid Construction of Carson City, Nevada. The project involved replacement of about 3,800 feet of pipeline at three locations in the Tahoe Donner area:  Northwoods Boulevard  Muhlebach Way & Falcon Point Place  Snowpeak Way & Matterhorn Place The bid price was $1,123,321.10. The Board also established a ten percent change order allowance of $112,678.90, for a total authorization not to exceed $1,236,000. During the course of the project, six change order requests were submitted and reviewed by staff. After review and discussion, the District and Rapid agreed on a total of $31,271 for these issues. The items were:  Additional footage for a fire hydrant lateral on Snowpeak Way Page 2 of 2  Additional footage for the PRV vault drain on Northwoods Boulevard  Installation of a fire hydrant extension on Falcon Point Place  Jute netting for permanent erosion control at a few service laterals on Northwoods Boulevard and Falcon Point Place  Dewatering, additional aggregate base, additional paving and additional compaction effort related to the old leaking water main on Northwoods Boulevard In addition to the three change order requests, there was one item that resulted in a credit to the District. The contract is based on a unit price bid. Attachment 1 shows the differences between bid totals and the amounts actually constructed. This analysis results in a $25,259.60 credit to the District. In early November, District staff performed a final walkthrough on the project. The work performed is complete and should be accepted by the District. Attached is a draft resolution (Attachment 2) accepting the project and directing that a Notice of Completion be filed. FISCAL IMPACT: The original bid price was $1,123,321.10. Once adjustments are made for the items described above, the final contract price is $1,129,332.50. Item Amount Original bid price $1,123,321.10 Reconciliation of bid vs. actual quantities ($25,259.60) Approved change order requests $31,271.00 Total $1,129,332.50 The funding source for this project is the Water Department General Fund. In addition to the amount paid to Rapid Construction, the District has incurred additional outside expenses for pre-construction environmental surveys, construction inspection, and geotechnical testing. ATTACHMENTS: 1. Bid Quantity vs. Actual Quantity Analysis 2. Resolution 2021-19