Loading...
HomeMy WebLinkAbout14 SCADA RTU Procurement 2022AGENDA ITEM #14 Page 1 of 2 MEETING DATE: April 6, 2022 TO: Board of Directors FROM: Roe Vernon, IT/SCADA Engineer SUBJECT: Consideration of a Water SCADA Remote Terminal Unit Procurement 2022 APPROVED BY_____________________________ Brian C. Wright, General Manager RECOMMENDATION: Authorize the General Manager to execute a contract with George T. Hall to provide three new remote terminal units (RTUs) in the amount of $62,358 plus a ten percent change order allowance for a total not to exceed amount of $68,594. BACKGROUND: In 2012, the District embarked on the Water Supervisory Control and Data Acquisition (SCADA) Replacement Project. The purpose of the project is to replace the aging and proprietary Sandel-Avery water SCADA System. SCADA Systems generally last thirty years and components are upgraded or replaced as needed or have run their useful life. The next phase of the project includes Donner Creek irrigation well and Fiberboard irrigation well. In 2022 staff anticipates these two sites will be commissioned necessitating the acquisition of two additional RTUs. The third RTU is for the new Pioneer Trails booster station project currently in the engineering design phase, with an anticipated construction timeline beginning in the summer of 2022 and completion in the fall of 2023. Page 2 of 2 The District publicly advertised a request for bids for the 3 new RTU assemblies. A bid opening was held on March 16, 2022. Two bids were received: Bidder Location Amount Responsive Telstar Instruments Sacramento, CA $147,393.23 No George T. Hall Reno, NV $62,583 Yes Staff has reviewed the received the bids for compatibility with District standards and specifications, and has determined George T. Hall to be the lowest responsive bidder. This project is in alignment with the following District goals and objectives. OBJECTIVES & GOALS: 1.05.020 Objectives: 3. Provide reliable and high quality water supply and distribution system to meet current and future needs. 6. Manage the District in an effective, efficient and fiscally responsible manner. 1.05.030 Goals: 1. Manage for Financial Stability and Resiliency. FISCAL IMPACT: $22,865 of the procurement cost will be charged to the 2023 Budget project, Pioneer Trail Pump Station, with Budget of $2.5 million. Sufficient Water funds exist to afford the timing of this project’s expenditure in 2022, ahead of the planned in 2023 procurement. $45,729 will be charged to 2022 Water SCADA project. The 2022 Budget for capital projects included $100,000 for Water SCADA project. 2022 Year to Date costs incurred are $63,194, consisting primarily of internal labor charges. Including the two RTUs equates to $108,194. Further, the 2022 Budget for Water SCADA project has been identified as insufficient to complete the identified Water SCADA capital improvements identified for 2022. The total amount for Water SCADA project in 2022 is estimated at $650,000. This variance to budget of $550,000 can be afforded due to the timing of various projects budgeted in 2022 that will shift to 2023 and thereafter. ATTACHMENTS: NONE.