Loading...
HomeMy WebLinkAboutRES 2021-19 - Board Resolution No. 2021-19 AUTHORIZING THE ACCEPTANCE OF THE DISTRICT PIPELINE REPLACEMENT-2021 PROJECT AND DIRECTING FILING OF THE NOTICE OF COMPLETION ______________________________________________________________________ WHEREAS, the Board of Directors of the Truckee Donner Public Utility District made the determination to undertake the District Pipeline Replacement-2021 project; and WHEREAS, Rapid Construction Inc. was selected by the District to perform the work; and WHEREAS, Rapid Construction Inc. has completed all of the Work included in the Project; and NOW THEREFORE BE IT RESOLVED by the Board of Directors of the District as follows: 1. That the District hereby accepts the District Pipeline Replacement-2021 project as complete. 2. That the Clerk of the District be directed to file with the County of Nevada the Notice of Completion, a copy of which is attached hereto. 3. That 35 days following the filing of the Notice of Completion, the monies retained from the contractor payments be released to the contractor if no claims have been made to the District by material suppliers or laborers. PASSED AND ADOPTED by the Board of Directors at a meeting duly called and held within the District on the 3rd day of November 2021, by the following roll call vote: AYES: Directors Bender, Finn, President Finn NOES: ABSTAIN: ABSENT: Director Aguera, Vice President Laliotis TRUCKEE DONNER PUBLIC UTILITY DISTRICT By____________________________________ Christa Finn, President of the Board ATTEST: _____________________________________ Shanna D. Kuhlemier, CMC, District Clerk DocuSign Envelope ID: D28E704A-60DA-400F-8313-7440BDDE0C76 Legal References: CC-3093,CCP-2003 (oath), 2015.5 (unsworn statement) RECORDING REQUESTED BY: Truckee Donner Public Utility District WHEN RECORDED, RETURN TO: TRUCKEE DONNER PUBLIC UTILITY DISTRICT Shanna D. Kuhlemier, District Clerk 11570 Donner Pass Road Truckee, CA 96161-4947 THE UNDERSIGNED DECLARES DOCUMENTARY TRANSFER TAX - NONE NOTICE OF COMPLETION NOTICE IS HEREBY GIVEN: 1. That the name and address of the public entity for whom the improvement project was done, as owner thereof, is the Truckee Donner Public Utility District, 11570 Donner Pass Road, Truckee, CA 96161. 2. Nature of interest or estate of owner: beneficial interest of a public utility of electric and water facilities. 3. That on November 3, 2021 the hereinafter described improvements were accepted as complete pursuant to Resolution 2021-19 of the Truckee Donner Public Utility District, the awarding authority. 4. That the subject improvements of the notice are generally described and identified as follows: District Pipeline Replacement-2021 project. 5. That the name and address of the contractor for such project was: Rapid Construction Incorporated, PO Box 21503, Carson City, Nevada 89721, I certify under penalty of perjury under the laws of the State of California that the foregoing is true and correct. Dated: _______________ TRUCKEE DONNER PUBLIC UTILITY DISTRICT By_____________________________________ Brian Wright, General Manager MAIL TAX STATEMENTS TO: SAME AS ABOVE DocuSign Envelope ID: D28E704A-60DA-400F-8313-7440BDDE0C76 Bid Item Description Quantity Units Unit Price Subtotal Quantity Units Unit Price Subtotal 1 Mobilization 1 LS 45,821.10$ 45,821.10$ 1 LS 45,821.10$ 45,821.10$ 1A 8” Water Main 1,204 FT 125.00$ 150,500.00$ 1,193 FT 125.00$ 149,125.00$ 1B 2” PE Water Service Lateral 200 FT 55.00$ 11,000.00$ 164 FT 55.00$ 9,020.00$ 1C Single Water Service (SS)1 EA 4,000.00$ 4,000.00$ 1 EA 4,000.00$ 4,000.00$ 1D Double Water Service for Lower Pressure Areas (DSL)2 EA 4,200.00$ 8,400.00$ 2 EA 4,200.00$ 8,400.00$ 1E Double Water Service with One Lot Vacant (DSV)1 EA 6,000.00$ 6,000.00$ 1 EA 6,000.00$ 6,000.00$ 1F Connect New 2” Lateral to Existing Double Meter Box at 12293/12309 Northwoods Blvd. 1 EA 4,000.00$ 4,000.00$ 1 EA 4,000.00$ 4,000.00$ 1G Connect New 4” Lateral to Existing 4” Lateral at 12411 Northwoods Blvd.1 EA 6,500.00$ 6,500.00$ 1 EA 6,500.00$ 6,500.00$ 1H Salvage Existing Fire Hydrant and Install New Fire Hydrant Assembly at Station 3+28 1 EA 13,000.00$ 13,000.00$ 1 EA 13,000.00$ 13,000.00$ 1I Air Valve Assembly 1 EA 7,500.00$ 7,500.00$ 1 EA 7,500.00$ 7,500.00$ 1J Connection to Existing 8” Valve at Station 0+00 1 LS 7,500.00$ 7,500.00$ 1 LS 7,500.00$ 7,500.00$ 1K Connection to Existing 8” PVC Pipe at Station 12+03.91 1 LS 7,500.00$ 7,500.00$ 1 LS 7,500.00$ 7,500.00$ 1L 3” PRV Vault Drain Pipe 1 LS 6,000.00$ 6,000.00$ 1 LS 6,000.00$ 6,000.00$ 1M Rock Excavation 20 HRS 300.00$ 6,000.00$ 32 HRS 300.00$ 9,600.00$ 1N AC Pavement and Base (trench restoration)8,700 SF 8.00$ 69,600.00$ 6,256 SF 8.00$ 50,048.00$ 1O Additional ½” Thickness of AC Pavement (trench restoration)8,700 SF 0.40$ 3,480.00$ 42,456 SF 0.40$ 16,982.40$ 1P AC Pavement and Base (lane restoration)1,105 SF 10.00$ 11,050.00$ 2,179 SF 10.00$ 21,790.00$ 1Q Asphalt Cement Dike 40 LF 125.00$ 5,000.00$ 58 LF 125.00$ 7,250.00$ 1R All Other Work Required by the Contract Documents 1 LS 7,000.00$ 7,000.00$ 1 LS 7,000.00$ 7,000.00$ 1S Fire Hydrant Assembly at Station 7+20 1 EA 11,500.00$ 11,500.00$ 1 EA 11,500.00$ 11,500.00$ 2A 8” Water Main 1,137 FT 110.00$ 125,070.00$ 1,144 FT 110.00$ 125,840.00$ 2B 2” PE Water Service Lateral 240 FT 55.00$ 13,200.00$ 232 FT 55.00$ 12,760.00$ 2C Double Water Service for Lower Pressure Areas (DSL) 6 EA 4,800.00$ 28,800.00$ 6 EA 4,800.00$ 28,800.00$ 2D Connect New 2” Lateral to Existing Double Meter Box at 13291/13030 Falcon Point Pl. 1 EA 4,500.00$ 4,500.00$ 1 EA 4,500.00$ 4,500.00$ 2E Connect New 2” Lateral to Existing 2” Lateral on Muhlebach Way 2 EA 4,500.00$ 9,000.00$ 2 EA 4,500.00$ 9,000.00$ 2F Fire Hydrant Assembly 2 EA 11,000.00$ 22,000.00$ 2 EA 11,000.00$ 22,000.00$ 2G Tee/Valve Assembly at Station 3+27 on Muhlebach Way 1 EA 5,500.00$ 5,500.00$ 1 EA 5,500.00$ 5,500.00$ 2H Connection to Existing 8” PVC Pipe at Station 0+00 on Muhlebach Way 1 LS 6,500.00$ 6,500.00$ 1 LS 6,500.00$ 6,500.00$ 2I Connection to Existing 8” DI Pipe at Station 5+22.11 on Muhlebach Way 1 LS 6,500.00$ 6,500.00$ 1 LS 6,500.00$ 6,500.00$ 2J Connection to Existing 8” DI Pipe at Station 6+14.50 on Falcon Point Place 1 LS 6,500.00$ 6,500.00$ 1 LS 6,500.00$ 6,500.00$ 2K Rock Excavation 20 HRS 300.00$ 6,000.00$ 71 HRS 300.00$ 21,300.00$ 2L AC Pavement and Base (trench restoration) 6,500 SF 10.00$ 65,000.00$ 7,411 SF 10.00$ 74,110.00$ 2M Additional ½” Thickness of AC Pavement (trench restoration) 6,500 SF 0.40$ 2,600.00$ 0 SF 0.40$ -$ 2N All Other Work Required by the Contract Documents 1 LS 8,000.00$ 8,000.00$ 1 LS 8,000.00$ 8,000.00$ 3A 8” Water Main on Snowpeak Way 1,052 FT 110.00$ 115,720.00$ 1,093 FT 110.00$ 120,230.00$ 3B 8” Water Main on Matterhorn Place 331 FT 110.00$ 36,410.00$ 337 FT 110.00$ 37,070.00$ 3C 2” PE Water Service Lateral 350 FT 55.00$ 19,250.00$ 332 FT 55.00$ 18,260.00$ 3D Double Water Service for Lower Pressure Areas (DSL) 10 EA 5,000.00$ 50,000.00$ 8 EA 5,000.00$ 40,000.00$ 3E Connect New 2” Lateral to Existing Double Meter Box at 12124/12138 Snowpeak Way 1 EA 5,000.00$ 5,000.00$ 2 EA 5,000.00$ 10,000.00$ 3F Fire Hydrant Assembly 2 EA 11,000.00$ 22,000.00$ 2 EA 11,000.00$ 22,000.00$ Analysis of Bid Quantities vs. Actual Quantities Constructed District Pipeline Replacement - 2021 Contractor: Rapid Construction Bid Amounts Actual Amounts Bid Item Description Quantity Units Unit Price Subtotal Quantity Units Unit Price Subtotal Bid Amounts Actual Amounts 3G Tee/Valve Assembly at Station 3+46 on Snowpeak Way 1 EA 7,000.00$ 7,000.00$ 1 EA 7,000.00$ 7,000.00$ 3H 6” Valve at Station 0-20 on Matterhorn Place 1 EA 4,500.00$ 4,500.00$ 1 EA 4,500.00$ 4,500.00$ 3I Connection to Existing 8” PVC Pipe at Station 0+00 on Snowpeak Way 1 LS 6,500.00$ 6,500.00$ 1 LS 6,500.00$ 6,500.00$ 3J Connection to Existing 6” Steel Pipe at Station 10+51.99 on Snowpeak Way 1 LS 7,500.00$ 7,500.00$ 1 LS 7,500.00$ 7,500.00$ 3K Connection to Existing 6” DI Pipe at Station 0+00 on Matterhorn Place 1 LS 6,500.00$ 6,500.00$ 1 LS 6,500.00$ 6,500.00$ 3L Rock Excavation 20 HRS 300.00$ 6,000.00$ 2 HRS 300.00$ 600.00$ 3M AC Pavement and Base (trench restoration)12,300 SF 10.00$ 123,000.00$ 7,355.5 SF 10.00$ 73,555.00$ 3N Additional ½” Thickness of AC Pavement (trench restoration)12,300 SF 0.40$ 4,920.00$ 0 SF 0.40$ -$ 3O All Other Work Required by the Contract Documents 1 LS 8,500.00$ 8,500.00$ 1 LS 8,500.00$ 8,500.00$ 3P Double Water Service with One Lot Vacant (DSV) 0 LS 6,000.00$ -$ 1 LS 6,000.00$ 6,000.00$ Total Amount of Bid 1,123,321.10$ 1,098,061.50$ Credit To The District (25,259.60)$