HomeMy WebLinkAbout7 UAMPS Power Project Agenda Item # 7
TRUCKEE DONNER
Memorandum G-71r Public UtIlilty L)I-Jr,lc,L
To: Board of Directors
From: Stephen Hollabaugh
Date: October 26, 2006
Subject: UAMPS Intermountain Power Project Unit#3
History
The District is a UAMPS member and is active within the IPP#3 Project
The District has funded of the Development Phase of IPP#3 and is heading toward the Power Sales
Contract phase of the project.
This project has progressed and is in the Development Phase of the Project and the District will soon
enter into the Power Sales Contract of the project.
At the last Board meeting we discussed in addition to the Power Sales Contract the following
Documents:
• Ownership Agreement
• Unit 3 Construction Lease, Use and Services Agreement
• Common Facilities and Site Agreement
• TDPUD future Resource Plan (also attached to this staff report)
New Information
Stephen Hollabaugh will present the Power Sales Contract with the assistance of Steve Gross who has
been in contact with UAMPS and had input to the final form of this contract. Truckee Donner PUD's
interest in the project is 24,100 kW.
Stephen Hollabaugh will discuss Truckee Donner PUD's load and resource needs during the time period
that this electric generation plant comes on line and into the future (TDPUD future Resource Plan).
At this meeting we wish to go into more detail of the Power Sales Contract. The following documents will
be handed out at the November 1, 2006 Board meeting:
• Power Sales Contract(most recent)
• Executive Summary of the Power Sales Contract
• Engineer's Report
I believe that the Power Sales Contract that will be presented at the November 1, 2006 meeting will be
substantially complete.
Recommendation:
The Board of Directors adopt the Power Sales Contract in substantially the form presented and authorize
the'Board President to sign the Power Sales Contract in substantially the form presented.
Resource Plan — Short Term
Projected Cost to Serve Load
12 0004 . r xkw 200,000
, ', w, s ��8'7 .`Lr .�:���s..�"y ":6�+T�`{. "'^x �a rg; �- �x°ws �f�d ,�'.` "�'�,a >�.�
x m
. s
180,000
10,000
- 160,000
140,000
0 8,000 -
L <
120,000
6,000 - 100,000 a
w
1
v 80,000
41
4,000 - 60,000
� x
40,000
2,000 ¢
20,000
2005 2006 2007 2008 2009 2010 2011 2012 2013 2014
CPS
SCE I IPP#3
I
I---- --� I
i
� Load MWh
2
Truckee-Donner Peak Load & Resources
60
50 - - - IPP 3
40 _
-_T- - 2% Growth
?C 30 -
1% Growth
20
t
f No Growth
10
+Avg
Monthly
o Peak
O N v CO CO O N v CD a0 O N CO CO O N CO OO O History
O O O O O r- r' N N CN N N ('7 cM CI) M M
O O O O O O O O O O O O O O O O O O O O O ---
N N N N N N N N N N N N N N N N N N N N N
Year 10/18/2006
Truckee-Donner Energy Load & Resources
700,000
600,000 - - - -
500,000
400,000 - - --- ---- - --- -- --- IPP 3
t
300,000 - - --- ---- ---- - - - --- - - -a-4% Growth
200,000 - - - - - - - - - - - _ - - - - - - _ - - -,a--2% Growth
—,�No Growth
100,000 - - - - - - - - - - - -
—�—Energy
0 History
O N CO CO O N d' CO OD O N CO DO O CO CO O
O O O O O N N N N N M M M M M �t
O O O O O O O O O O O O O O O O O O O O O
N N N N N N N N CN N N N N N N N N N N N N
_. w , Year, 10/1§2006
Truckee Donner PUD
Power Supply Resource Plan
November 1 , 2006
Stephen Hollabaugh
Truckee Donner — Power Supply Resource Plan
• Constellation Contract — April 2003 thru December 2007
• WAPA Contract — (Small amount of energy through NCPA -
Started 2005)
• Shaped Capacity & Energy (SC&E) Contract from UAMPS ,,�--
Starts Jan 1 , 2008 until April 2009
• April 2009 thru April 2012 — Open position — Try to obtain
contract si
milar to the SC&E contract
• 2012 Forward — IPP#3 Power Sales Contract
r
i
Resource Plan — Short Term
Projected Cost to Serve Load
12,000 200,000
180,000
10,000
160,000
0 140,000
0 8,000
120,000
3
0 6,000 100,000 a
80,000
L 4,000
60,000
40,000
2,000
20,000
2005 2006 2007 2008 2009 2010 2011 2012 2013 2014
CPS SCE IPP#3
Load MWh
3
2008 Options for Power Supply
Estimated Cost of 2008 Power Supply Options
14,000 r $80.00
e N
f $75.00
12,000
$70.00
10,000 $65.00
0
$60.28
8,000 $60.00
0
$55.00
.i:, 6,000
L y $50.00
a�
>0 4,000 $45.00
$40.00
2,000 $35.00
0 — - $30.00
2005 2006 2007 2008
O Cost w/UAMPS 2008 M Cost w/Market 2008 46UAMPS Option---*--Market Option
4
i
Estimated Rate Impact
Estimated % Increase in Retail Electric Rates
Due to Power Supply Costs
14,000 20.0%
18.0%
12,000 16.41%
16.0%
10,000 14.0%
'. 8, i
12.0%
000
0
10.0%
6,000 8.0%
5.80%
4,000 6.0%
4.0%
2,000 0.90% 0.11% o
2.0/o
0 � ti 0.0%
2005 2006 2007 2008
Cost w/UAMPS 2008 M Cost w/Market 2008 +Increase w/UAMPS '}Increase w/Market'
IPP UNIT 3 PROJECT - 2006 FACTS
• Facts about Intermountain Power Plant UNIT 3
— Executive Summary
— Energy Demand
— IPP Unit 3 Project
— Energy Resource Options
— Coal Technology Today
— IPP Emission Controls
— Partners in Power — UAMPS, Intermountain Power Plant Unit 3
Brochure
IPP#3 - Power Sales Contract & Project Agreements
• Power Sales Contract Unit 3
• Project Agreements: (handed out and reviewed at the Oct 18t '
Board Meeting)
— Ownership Agreement
— Joint Operating Agreement
— Common Facilities and Site Agreement
— Unit 3 Lease, Use and Service Agreement
• Truckee Donner PUD Load and Energy Resources Charts
Truckee-Donner Peak Load & Resources
60
i
IPP 3
40 - —_
- -
2% Growth,,
30
—a—1% Growth
'I
20
—*—No Growth
10 -- -- -
i 'I
I '
+A�9
t Monthly
o Peak
O N v CO CO O N CO CO O N �' CO ao O N Cr CO aD o History
O O O O O � N N N N N M M CO M M �
O O O O O O O O O O O O O O O O O O O O O
N N N N N N CN N CN N N N N N N N N
Year 10118/2006
8
Truckee-Donner Energy Load & Resources
700,000
600,000 - - -- -- --_ — - — - - -
500,000 - - - - - -
400,000 — - - - - - -- -- __ mm IPP 3
300,000 -- - - - -- - _
-�-4 o rover
1
200,000 - -
� 2/a Growth'
f No Growth
100,000
1
` +Energy
o History
O N O CO O N C' CO 00 O CN CO 00 O N CO CO O
O O O O O N N N N N M M M CO M V
O O O O O O O O O O O O O O O O O O O O O
N CN N N N N N N N CN N CN N CV N C 4 N CV N N N
—year— 10/1Y2006
Yearly Power Supply Plans
Projected Cost to Serve Load
12,000 200,000
180,000
10,000 160,000
'0 140,000
8,000
L 120,000
06 6,000 100,000 c
w a
0
u 80,000
4,000 60,000
40,000
2,000
20,000
s
� 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 ..
-- CPS SCE — IPP#3
Load MWh
10
t
i
Post March, 2009 Power Supply
• TDPUD has several options for the 2009 time period
— Extend UAMPS SCE product, if available
— Execute contract similar to existing arrangement (if the
economise are good) with active power marketers
— Participate in IPP3 — 2012 timeframe
• Action item for Power Sales Contract on
November 19 2006 agenda.