Workshop Item # 9 February 5, 2014 2014 project–Replacement District Pipeline Discussion of the
Discussion of the District Pipeline 2 September 2013Board workshop on the planned 2014 project held in •and have exceeded their useful lifeinch diameter and smaller) -Pipes that are
old, undersized (typically 4–Pipes in poor condition requiring repeated repairs–pipelines in two categories:The Water Department has a need to replace existing •Background / History
2014 Project–Replacement
New Information 2014 Project–Replacement Discussion of the District Pipeline 3 Willow Street service laterals & meter boxes (additive alternate)–Johnson Lane (additive alternate)–Whitetail
Lane–Snowshoe Circle–Rainbow Drive–Lakeview Court–State Route 89 South–Sanders Well yard piping–Sierra Drive–Boca Street–Project scope has been finalized•
New Information 2014 Project–Replacement Discussion of the District Pipeline 4 Third meeting planned for Lakeview Court residents•Johnson Lane residents–Biltz Tract residents–Two public
meetings held:•Lakeview CourtTemporary above ground piping needed for Biltz Tract and •advertisingAwaiting issuance of Caltrans encroachment permit before •
New Information 2014 Project–Replacement Discussion of the District Pipeline 5 October 2014–Complete Construction –May 1, 2014––April 2014Beginning of –Bid Award –End of March 2014–Bid
Opening –February 2014–Advertising for Bids –Current project schedule•
New Information 2014 Project–Replacement Discussion of the District Pipeline 6 New RFP to be issued–Surveying:–Proposal for 2014 has been requested–& Kull selected through RFP process
in 2013Holdredge–Geotechnical testing: –Proposal received from Inland Ecosystems–Environmental services:–Outside consultants•
Fiscal Impact 2014 Project–Replacement Discussion of the District Pipeline 7 Cost for outside consultants estimated at $80,000•Bid documents will include additive alternate to provide
flexibility–construction contract Water Department is estimating $1,000,000 for the •
Recommendation 2014 Project–Replacement Discussion of the District Pipeline 8 Receive this report and provide comment•