Loading...
HomeMy WebLinkAbout9 Award SCADA conduit & vault projectAgenda Item # 9 TRUCKEE DONNER PLIblic Utility Chi:,triC CONSENT To: Board of Directors From: Joe Horvath Date: April 06, 2011 Subject: Consideration of the Award of a Contract for the SCADA Conduit and Vault Project 1. WHY THIS MATTER IS BEFORE THE BOARD Board approval is required for expenditures in excess of $15,000. 2. HISTORY The District has been installing communication conduit with underground electric system extensions since approximately 2000. There are some gaps in this communication conduit system which prevent its use by the District. This project will complete the few remaining conduit connections and box installations required to make the conduit system continuous from the District office to Truckee Substation, Martis Valley Substation, 6170 Tank, and Glenshire Drive Well areas. Subsequent to project completion, the District plans to use this conduit system to improve communication reliability to these electric and water facilities. The bid period began on February 28, and ended on March 28, 2011. 3. NEW INFORMATION The bid opening was held at 2:OOPM on March 28 and six bids were received. A summary of the bids is shown below: Bidder Amount Responsive Heavy Equipment $46,950 No Aspen Developers $73,004 Yes Dale Burt $82,470 Yes Longo, Inc. $94,500 Yes AM-X $117,117 Yes S&R Snow Removal &Excavation $149,907 No The apparent low bidder, Heavy Equipment, failed to include the Non -Collusion Affidavit and hence their bid is non -responsive to District contract requirements. The remaining bids are in excess of the District's construction cost estimate for this project. 4. FISCAL IMPACT Sufficent monies exist within the approved FY 2011 Electric and Water capital budgets for this project, funded by rates. 5. RECOMMENDATION 1) Reject all bids as not being in the best interests of the District. 2) Direct staff to re -bid this project. Stephen Hollabaugh Assistant General Manager Michael D. Holley General Manager