Resolution No. 2015 - 23
AUTHORIZING THE ACCEPTANCE OF
THE DISTRICT PIPELINE REPLACEMENT - SUN VALLEY ROAD 2015
PROJECT
AND DIRECTING FILING OF THE NOTICE OF COMPLETION
WHEREAS, the Board of Directors of the Truckee Donner Public Utility District made the determination to
undertake the Sun Valley Road Pipeline 2015 Project and
WHEREAS, Longo Incorporated was selected by the District to perform the work; and
WHEREAS, Longo Incorporated has completed all of the work included in the Project; and
WHEREAS,The District's Water System Engineer, Neil Kaufman, now certifies the completion of the project;and
WHEREAS,the District's Water Utility Manager/General Manager, Michael D. Holley, has recommended that the
�
work be accepted by the District;
.4111 NOW THEREFORE BE IT RESOLVED by the Board of Directors of the District as follows:
1. That the District hereby accepts the Sun Valley Road Pipeline 2015 Project as complete.
2. That the Clerk of the District be directed to file with the County of Nevada the Notice of Completion,a copy
of which is attached hereto.
3. That 35 days following the filing of the Notice of Completion, the monies retained from the contractor
payments be released to the contractor if no claims have been made to the District by material suppliers,
laborers, or sub-contractors.
PASSED AND ADOPTED by the Board of Directors at a meeting duly called and held within the District on the
ninth day of December 2015 by the following roll call vote:
AYES:
NOES:
ABSTAIN:
ABSENT:
TRUCKEE DONNER
PUBLIC UTILITY DISTRICT
By
Bob Ellis, President of the Board
• ATTEST:
Michael D. Holley, Clerk of the Board