Loading...
HomeMy WebLinkAbout16 Power Point Brickelltown Phase 2 Board Briefing Workshop Item # 16 April 15, 2015 Streetscape projectTown of Truckee Brickelltown Discussion of the New Information Brickelltown Streetscape ProjectDiscussion of the Town of Truckee 2 Phase 3: Streetscape, parking and paving along Donner Pass Road–Phase 2: Utility undergrounding along Donner Pass Road–Phase 1: 10120 Jibboom Street to 10178 Donner Pass Road–Three phases•Paved parking –Realignment of Donner Pass Road–Pedestrian plaza–Undergrounding of overhead utilities–10120 Jibboom Street to traffic roundabout at McIver Crossing–Town of Truckee streetscape project• New Information Brickelltown Streetscape ProjectDiscussion of the Town of Truckee 3 2016planned for Summer of 3 Phase •Phase 2 planned for Summer of 2015•early Summer 2015Phase 1 began in Summer 2014 and will be completed in • New Information Brickelltown Streetscape ProjectDiscussion of the Town of Truckee 4 upgraded since 1985A number of service laterals and meter boxes have been •Service laterals and meter boxes not replaced at that time–Water main installed in 1985 •along Donner Pass Road in the Phase 2 areaWater Department conducted evaluation of water facilities • New Information Brickelltown Streetscape ProjectDiscussion of the Town of Truckee 5 opening and bid prices have been determinedFinal agreement will be presented to TDPUD Board after bid –Draft agreement with Town of Truckee has been developed–Advertising for bids is expected in May 2015–contractMost cost effective to include water system work in Town of Truckee –Issue discussed with Town of Truckee–projectEight remaining locations require upgrade during Town’s • New Information Brickelltown Streetscape ProjectDiscussion of the Town of Truckee 6 Covered by Development Agreement with Town of Truckee–Conversion of about 20 services from overhead to underground–Change voltage from 220 to 208–mount transformers and underground cables-Installation of 3 pad–Removal of 1,200’ of overhead lines and poles–Electric system work• Fiscal Impact Brickelltown Streetscape ProjectDiscussion of the Town of Truckee 7 Town of Truckee will pay for all electric work•Planned funding source is Water Department Capital •Estimated cost of $30,000 to $50,000 water system work• Recommendation Brickelltown Streetscape ProjectDiscussion of the Town of Truckee 8 Receive this report and provide comment•