HomeMy WebLinkAbout8 Change order for Airport Well Maintenance Consent June 8, 2015 2015 Contractto the Airport Well Maintenance Consideration of a Change Order Item #8 Consideration of a Change Order to the Airport 2 Axial alignment survey of the well column–Video inspection of the well–Installation of a new pump shaft assembly–assemblyRemoval and inspection of the well pump and motor –The contract included:•an amount not to exceed $23,980Well Maintenance 2015 contract to Carson Pump, LLC. for At the April 15, 2015 meeting, the Board awarded the Airport •Background / History Well Maintenance 2015 Contract New Information Well Maintenance 2015 ContractConsideration of a Change Order to the Airport 3 Brush well column perforations–bearings on the 250HP electric motorReconditioning of the stator, balance rotor and replace –The following additional maintenance items are required:•life of the assetinterest of sustained productivity and extending the useful need to authorize additional maintenance items in the provided by Carson Pump, LLC. and has determined the Staff has reviewed the maintenance and inspection reports • New Information Well Maintenance 2015 ContractConsideration of a Change Order to the Airport 4 will require a change order in the amount of $4,753The cost associated with the additional labor and materials • Fiscal Impact Well Maintenance 2015 ContractConsideration of a Change Order to the Airport 5 Operations budget for this contractSufficient funds exist within the approved FY15 Water •$28,733 contract, bringing the total amount of the contract to The change order adds an additional $4,753 to the original • Recommendation Well Maintenance 2015 ContractConsideration of a Change Order to the Airport 6 total amount of $28,7332015 contract in the amount of $4,753 for a new contract Authorize Change Order #1 to the Airport Well Maintenance •