Loading...
HomeMy WebLinkAbout2015-08-28 Weekly Board LetterTruckee Donner Public Utility District BOARD LETTER August 28, 2015 Dear Board Members: Directors Joseph R. Aguera Jeff Bender Bob Ellis Tony Laliotis Paul Warmerdam General Manager Michael D. Holley Included in this week's Board Letter are some updates on items that I think are of interest to the Board. Out of Office: I will be out of the office this afternoon until Wednesday morning. Steve Hollabaugh will be the Acting General Manager in my absence. Should you have any questions please call Shanna Kuhlemier at 582-3980. Electric Meter Replacement Program Pilot: District staff met with representatives from Aclara Technologies on Tuesday, August 25, 2015 to discuss the implementation of the meter replacement program pilot project. The pilot project includes approximately 300 electric meters, 2 data collection units, and software including an integration into the District's NISC billing system. The pilot project is being provided at no cost to the District. The collector units and software are scheduled to be installed by the first week in October. The meters are projected to be installed and operational by the end of October. A three-month District evaluation period for the pilot project system will begin immediately subsequent to the installation of all the meters. Donner Lake Substation Rebuild Project: The District's contractor is progressing on -time and within budget with the work to rebuild the substation. Construction started at the substation in late June of this year. A major milestone was accomplished this week with the successful delivery and installation of the substation transformer. The substation transformer is the single most expensive and largest piece of substation equipment, weighing in at about 50,000 lbs. It took an entire day to set up the crane (largest one in northern Nevada) and off-load the transformer from the truck onto its new foundation home. Attached are a few pictures depicting the process. C n 11570 Donner Pass Rd, Truckee, CA 96161 — Phone 530-587-3896 — www.tdpud.org CATT Requests Workshop: Fire flow calculations required for single family residential fire sprinklers are required by the State of California. The District has the responsibility and the expertise to create and prepare these calculations based on actual field conditions. The District's water engineer, Neil Kaufman (PE) has implemented a calculation and a procedure to ensure safety for our customers and community while complying with the mandate. CATT is requesting a Board workshop to discuss our professional opinion on this issue. Staff has communicated with CATT numerous times answering questions and addressing their concerns. Staff concerns are responding to CATT's request would benefit their builders businesses at the expense of public safety. Consequently, staff has directed CATT to utilize the protest procedures provided for in District Code should they want to address the Board. The request is included as Attachment 1. Michael Holley General Manager 11570 Donner Pass Rd, Truckee, CA 96161 — Phone 530-587-3896 — www.tdpud.org