HomeMy WebLinkAbout8 Brickelltown AgreementTo: Board of Directors From: Neil Kaufman :)ate . September 16, 2015 Subject: Consideration of an agreement with the Town of Truckee for Brickelltown Phase II 1. WHY THIS MATTER IS BEFORE THE BOARD Board approval is required for expenditures in excess of $15,000. The Town of Truckee is currently undertaking the Brickelltown Streetscape project. The project involves undergrounding of overhead utilities, construction of a pedestrian plaza and sidewalks, realignment of Donner Pass Road and creation of paved parking spaces. The area of the project is from 10120 Jibboom Street to the traffic roundabout at the McIver Crossing. The overall project is broken into three phases. • Phase 1 -Streetscape and sidewalk Spring Street and Donner Pass Road Donner Pass Road. This work began completed in the late Summer of 2015, improvements along Jibboom Street, from 10120 Jibboom Street to 10178 in the late Summer of 2014 and will be • Phase 2 -Utility undergrounding from 10178 Donner Pass Road to the McIver Undercrossing roundabout. • Phase 3 -Donner Pass Road realignment along with sidewalk and streetscape improvements from 10178 Donner Pass Road to the roundabout. During the Summer of 2014, the Water Department undertook the Spring Street Pipeline Rehabilitation project in order to address a problematic pipeline before the Phase 1 improvements were constructed. In April of 2015, a Board workshop was conducted to review the project. The workshop discussed eight properties where replacement of water service laterals and/or meter boxes is recommended. The recommended approach to these properties was to have this water system work included in the Town of Truckee's construction contract for Phase 2. 3. NEW INFORMATION The Town of Truckee combined the Phase 2 and Phase 3 work into a single construction contract. The bid schedule for the contract included distinct bid items that covered the water system improvements. The bid opening for this contract was held on Tuesday, August 19. Two bids were received and the apparent low bidder was Q&D Construction of Sparks, Nevada with a bid price of $3,298,000. The Town of Truckee awarded the contract to Q&D Construction at its council meeting on August 25, 2015. The overall project is scheduled for completion in September 2017. Preliminary discussions with Q&D have indicated that the contractor does not intend to start work on the project until Spring 2016. The bid items covering the water system improvements in the Q&D bid totaled $32,200. In addition, the District should pay a proportional share of the common costs such as design, mobilization, traffic control and storm water control. Therefore, the total cost to the District would be: Item Amount Water system construction District share of common construction costs $32,200000 $4,214.84 District share of design costs $2,500000 Total $38, 914.84 It is recommended that the Board establish a 10 percent change order authorization associated with the water system construction items. A draft reimbursement agreement between the District and the Town of Truckee has been prepared and reviewed by legal counsel for both parties. A copy of the draft agreement is attached. 4. FISCAL IMPACT Sufficient funds exist for this project in the Water Department Capital Replacement Fund. The recommended authorization for the project is $38,914.84 plus a ten percent change order allowance for an amount not to exceed $42,800. 5. RECOMMENDATION 1.) Authorize the General Manager to execute an agreement between the District and the Town of Truckee governing water system improvements that are part of the Brickelltown Streetscape project for an amount not to exceed $42,800. 2) Authorize the transfer of up to $42,800 from the Water Department Capital Replacement Fund to the Water Department General Fund to pay for the project. Michael D. Holley General Manager / Water Utility Manager