Loading...
HomeMy WebLinkAbout8 2015 Water Leak and Paving Repair Projectenda Item # CONSENT To: Board of Directors From: Brian Wright Date: October 07, 2015 Subject: Consideration to Award a Maintenance Services Contract for the 2015 Water Leak and Paving Repair Project 1. WHY THIS MATTER IS BEFORE THE BOARD District Code requires that all service contracts in excess of $15,000 be approved by the Board. 2. HISTORY One of the ongoing maintenance objectives for the District's water utility staff is the reduction of unaccounted for water. The two primary means for reducing unaccounted for water have been the District's annual capital water main replacement projects and water distribution system leak repairs performed by the water utility maintenance and operations crews. Historically, the District's water utility maintenance crews have repaired 75-100 water system leaks each year, including 80 repairs in 2015 to date. In an effort to enhance the reduction of unaccounted for water, in March 2015, the District advertised a request for proposals for leak detection and correlation services. The District received one proposal and entered into a services agreement with Utility Services Associates (USA). In August 2015, USA performed leak detection and correlation surveys along water distribution system pipelines disignated as high priority by District staff. Distribution system pipelines were prioritized by historical leak data and existing pipe construction material (welded steel). Working with the assistance of District maintenance staff, USA pinpointed 26 leaks distributed across the Tahoe Donner and Prosser Lakview subdivisions. 3. NEW INFORMATION On September 18, 2015 the District publically advertised a request for bids for the Leak Repair and Paving 2015 project. Services requested included the contractor providing a fully equipped leak repair crew capable of performing excavations, water main pipeline and service leak repairs, excavation backfill, final paving and traffic control as necessary. Work will be performed under the direction of assigned district personnel and will be incompliance witha all District and regulatory specifications. The District received five bids. The table below provides an overview of the bids received. Staff has reviewed the bids for accuracy and compliance with District specifications and has determined Longo Inc. to be the lowest responsive bidder. Contractor Address Bid Amount (hourly rate) Longo Inc. Tahoe City, CA $495.00 Reno Tahoe Construction Sparks, NV $571000 Blount Excavation & Paving Truckee, CA $628950 AM-X Construction & Excavation Truckee, CA $750.00 F.W. Carson Co. Incline Village, NV $940900 4. FISCAL IMPACT Funds for the Leak Repair and Paving 2015 project are available in the Board approved FY15 Budget. 5. RECOMMENDATION Award a maintenance services contract for Leak Repair and Paving 2015 to Longo Incorporated of Tahoe City, CA. at a hourly rate of $495, plus $175 per hour for additional traffic control as needed, for a total not to exceed an amount of $80,000. Michael D. Holley General Manager / Water Utility Manager