CONSENT
To: Board of Directors
From: Neil Kaufman
Date: November 04, 2015
Subject: Final Completion of the District Pipeline Replacement 2015 Project
1. WHY THIS MATTER IS BEFORE THE BOARD
The District Pipeline Replacement - 2015 project is complete. A resolution accepting
the project as complete requires Board approval.
2. HISTORY
In April 2015, the Board awarded the construction contract for the District Pipeline
Replacement - 2015 project to AM-X Construction & Excavation (AMX) of Truckee,
California. The project involved replacement of about 4,900 feet of pipeline in three
segments along Northwoods Boulevard in Truckee. The project also included
installation of about 7,850 feet of fiber optic inner duct. AMX began work in June and
completed the construction at the end of October.
The original bid price was $1,478,273.75. At the time of award, the Board also
established a 10 percent change order allowance for a total for a total authorization
not to exceed $1,626,000.
3. NEW INFORMATION
During the course of the project, 15 change order requests were submitted and
reviewed by staff. After review and discussion, the District and AMX agreed on a total
of $25,238.22 for these issues. This amount did not exceed the $147,726.25 change
order allowance established by the Board of Directors. The items generally fell under
the following categories:
• Additional work such as installation of fire hydrant extensions and AC dike
• Repair of water leaks
• Unmarked or mis-marked utilities
There was one item that resulted in a credit to the District. The contract is based on a
unit price bid. Attachment 1 shows the differences between bid totals and the
amounts actually constructed. This analysis results in a $47,597.29 credit to the
District.
Page 1 of 5
In mid -October, District staff performed a final walkthrough on the project. The work
performed is complete and should be accepted by the District. Attached is a draft
resolution (Attachment 2) accepting the project and directing that a Notice of
Completion be filed.
!11111126W-11aIIT, 1:7_1;O1
The original bid price was $1,478,273.75. Once adjustments are made for the items
described above, the final contract price is $1,455,914.68. As discussed at the time of
award, the anticipated funding sources for the project were:
Funding Source
Amount
Electric Department General Fund
Water Department Capital Replacement Fund
$161,723.75
$1,316,550.00
Total
$1,478,273.75
After adjustments for change orders and the reconciliation of bid vs. actual quantities, the final
funding for the project is:
Funding Source
Amount
Electric Department General Fund
Water Department Capital Replacement Fund
$166,139.95
$1,289,774.73
Total
$1,455,914.68
5. RECOMMENDATION
Adopt resolution 2015-21 accepting the District Pipeline Replacement - 2015 project
as complete and authorize the filing of the Notice of Completion.
/� , & �' ��- -e _ -
Michael D. Holley
General Manager / Water Utility Manager
Page 2 of 5
Analysis of Bid Quantities vs. Actual Quantities Constructed
District Pipeline Replacement - 2015
Contractor: AM-X Construction & Excavation
Bid Item
Description
Bid Amounts
Actual Amounts
Quantit Units
Unit Price
Subtotal I
Quantity Units
I Unit Price
Subtotal
1
Mobilization
1
LS
$ 30,000.00
$ 30,000.00
1
LS
$ 30,000.00
$ 30,000.00
1A
8" Water Main - Station 0+00 to 19+38.55
1,939
FT
$ 95.00
$ 184,205.00
1,949
FT
$ 95.00
$ 185,155.00
113
8" Water Main - Stations 0+60 and 4+73
125
FT
$ 120.00
$ 15,000.00
148
FT
$ 120.00
$ 17,760.00
1C
2" PE Water Service Lateral
850
FT
$ 65.00
$ 55,250.00
786
FT
$ 65.00
$ 51,090.00
1 D
Double Water Service (DS)
12
EA
$ 2,435.00
$ 29,220.00
10
EA
$ 2,435.00
$ 24,350.00
1E
Single Water Service (SS)
3
EA
$ 2,115.00
$ 6,345.00
3
EA
$ 2,115.00
$ 6,345.00
1 F
Double Water Service with One Lot Vacant (DSV)
4
EA
$ 3,075.00
$ 12,300.00
4
EA
$ 3.075.00
$ 12,300.00
1G
Double Water Service with Both Lots Vacant (D2V)
1
EA
$ 1,490.00
$ 1,490.00
1
EA
$ 1,490.00
$ 1,490.00
1H
Connect New 2" Lateral to Existing Meter Box
1
EA
$ 1,205.00
$ 1,205.00
1
EA
$ 1,205.00
$ 1,205.00
11
Connect New 2" Lateral to Existing Lateral
1
EA
$ 1,300.00
$ 1,300.00
1
EA
$ 1,300.00
$ 1,300.00
1J
Fire Hydrant Assembly
4
EA
$ 8,360.00
$ 33,440.00
4
EA
$ 8,360.00
$ 33,440.00
1 K
Connection to Existing 8" Pipe at Station 0+00
1
EA
$ 2,615.00
$ 2,615.00
1
EA
$ 2,615.00
$ 2,615.00
1L
TeeNalve Assembly at Station 0+60
1
EA
$ 5,685.00
$ 5,685.00
1
EA
$ 5,685.00
$ 5,685.00
1 M
Cross/Valve Assembly at Station 4+73
1
EA
$ 11,780.00
$ 11,780.00
1
EA
$ 11,780.00
$ 11,780.00
1N
Connection to Existing 6" Pipe at Station 19+38.55
1
EA
$ 2,710.00
$ 2,710.00
1
EA
$ 2,710.00
$ 2,710.00
10
Rock Excavation
16
HRS
$ 675.00
$ 10,800.00
6
HRS
$ 675.00
$ 3,712.50
1 P
AC Pavement and Base (trench restoration)
18,000
SF
$ 5.00
$ 90,000.00
11,943
SF
$ 5.00
$ 59,715.00
1 Q
Additional'/i' Thickness of AC Pavement (trench restoration)
18,000
SF
$ 0.75
$ 13,500.00
46,784
SF
$ 0.75
$ 35,088.00
1R
All Other Work Required by the Contract Documents
1
LS
$ 29,000.00
$ 29,000.00
1
LS
$ 29,000.00
$ 29,000.00
2A
8" Water Main
2,290
FT
$ 97.00
$ 222,130.00
2,235
FT
$ 97.00
$ 216,795.00
2B
2" PE Water Service Lateral
1,000
FT
$ 65.00
$ 65,000.00
980
FT
$ 65.00
$ 63,700.00
2C
Double Water Service (DS)
21
EA
$ 2,435.00
$ 51,135.00
18
EA
$ 2,435.00
$ 43,830.00
2D
Double Water Service with One Lot Vacant (DSV)
3
EA
$ 2,525.00
$ 7,575.00
6
EA
$ 2,525.00
$ 15,150.00
2E
Connect New 2" Lateral to Existing Meter Box
1
EA
$ 1,205.00
$ 1,205.00
1
EA
$ 1,205.00
$ 1,205.00
2F
Fire Hydrant Assembly
3
EA
$ 8,455.00
$ 25,365.00
3
EA
$ 8,455.00
$ 25,365.00
2G
1" Air Valve Assembly
1
EA
$ 6,820.00
$ 6,820.00
1
EA
$ 6,820.00
$ 6,820.00
2H
Connection to Existing 8" Pipe at Station 0+00
1
EA
$ 2,615.00
$ 2,615.00
1
EA
$ 2,615.00
$ 2,615.00
21
TeeNalve/Fire Hydrant Assembly at Station 9+80
1
EA
$ 9,930.00
$ 9,930.00
1
EA
$ 9,930.00
$ 9,930.00
2J
TeeNalve Assembly at Station 20+53
1
EA
$ 9,465.00
$ 9,465.00
1
EA
$ 9,465.00
$ 9,465.00
2K
Connection to Existing 6" Pipe at Station 22+89.36
1
EA
$ 3,155.00
$ 3,155.00
1
EA
$ 3,155.00
$ 3,155.00
2L
Rock Excavation
18
HRS
$ 675.00
$ 12,150.00
23
HRS
$ 675.00
$ 15,693.75
2M
AC Pavement and Base (trench restoration)
25,000
SF
$ 4.50
$ 112,500.00
15,549
SF
$ 4.50
$ 69,969.38
2N
Additional''M." Thickness of AC Pavement (trench restoration)
25,000
SF
$ 0.65
$ 16,250.00
15,549
SF
$ 0.65
$ 10,106.69
20
All Other Work Required by the Contract Documents
1
LS
$ 32,935.00
$ 32,935.00
1
LS
$ 32,935.00
$ 32,935.00
3A
8" Water Main
174
FT
$ 120.00
$ 20,880.00
174
FT
$ 120.00
$ 20,880.00
3B
12" Water Main
515
FT
$ 125.00
$ 64,375.00
515
FT
$ 125.00
$ 64,375.00
3C
2" PE Water Service Lateral
250
FT
$ 70.00
$ 17,500.00
284
FT
$ 70.00
$ 19,880.00
3D
Double Water Service (DS)
5
EA
$ 2,485.00
$ 12,425.00
4
EA
$ 2,485.00
$ 9,940.00
3E
Double Water Service at 16054 Northwoods Blvd
1
EA
$ 3,315.00
$ 3,315.00
1
EA
$ 3,315.00
$ 3,315.00
3F
Fire Hydrant Assembly
1
EA
$ 9,105.00
$ 9,105.00
1
EA
$ 9,105.00
$ 9,105.00
3G
Connection to Existing 8" Pipe at Station 0+00
1
EA
$ 2,515.00
$ 2,515.00
1
EA
$ 2,515.00
$ 2,515.00
3H
TeeNalve Assembly at Station 1+74
1
EA
$ 16,295.00
$ 16,295.00
1
EA
$ 16.296.00
$ 16,295.00
31
Connection to Existing 8" Pipe at Station 6+88.21
1
EA
$ 2,515.00
$ 2,515.00
1
EA
$ 2,515.00
$ 2,515.00
3J
Rock Excavation
6
HRS
$ 675.00
$ 4,050.00
13
HRS
$ 675.00
$ 8,606.25
3K
AC Pavement and Base (trench restoration)
6,000
SF
$ 5.25
$ 31,500.00
6,171
SF
$ 5.25
$ 32,397.75
3L
Additional'/2" Thickness of AC Pavement (trench restoration)
6,000
SF
$ 0.80
$ 4,800.00
23,184
SF
$ 0.80
$ 18,547.20
3M
All Other Work Required by the Contract Documents
1
LS
$ 13,200.00
$ 13,200.00
1
LS
$ 13,200.00
$ 13,200.00
30
Single Water Service (SS) - Use Bid Price from 1 E
0
EA
$ 2,115.00
$ -
2
EA
$ 2,115.00
$ 4,230.00
4A
Innerduct from Station 0+04 to Station 29+49, Offset Right
2,969
FT
$ 7.75
$ 23,009.75
2,965
FT
$ 7.75
$ 22,978.75
4B
Innerductfrom Station 29+49 Offset Right to Station 53+61
2,436
FT
$ 7.75
$ 18,879.00
2,423
FT
$ 7.75
$ 18,778.25
4C
2" Conduit from Station 0+00 to Station 0+36
1
LS
$ 5,900.00
$ 5,900.00
1
LS
$ 5,900.00
$ 5,900.00
4D
6" Pipe at Station 6+16
1
LS
$ 3,475.00
$ 3,475.00
1
LS
$ 3,475.00
$ 3,475.00
4E
6" Pipe at Station 25+35
1
LS
$ 3,475.00
$ 3,475.00
1
LS
$ 3,475.00
$ 3,475.00
4F
Communications Pull Box Assembly at Station 29+49
1
LS
$ 5,520.00
$ 5,520.00
1
LS
$ 5,520.00
$ 5,520.00
4G
6" Pipe at Station 39+24
1
LS
$ 3,415.00
$ 3,415.00
1
LS
$ 3,415.00
$ 3,415.00
4H
6" Pipe at Station 44+74
1
LS
$ 3,415.00
$ 3,415.00
1
LS
$ 3,415.00
$ 3,415.00
41
2" Conduit from Station 53+23 to Station 53+65.73
1
LS
$ 5,850.00
$ 5,850.00
1
LS
$ 5,850.00
$ 5,850.00
4J
Rock Excavation
1
HRS
$ 675.00
$ 675.00
0
HRS
$ 675.00
$ -
4K
AC Pavement and Base (trench restoration)
800
SF
$ 16.55
$ 13,240.00
670
SF
$ 16.55
$ 11,088.50
4L
Additional'/z" Thickness of AC Pavement (trench restoration)
800
SF
$ 2.35
$ 1,880.00
2,680
SF
$ 2.35
$ 6,298.00
4M
All Other Work Required by the Contract Documents
1
LS
$ 12,800.00
$ 12,800.00
1
LS
$ 12,800.00
$ 12,800.00
5A
Inner Duct from Station 0+04 to Station 24+20
2,420
FT
$ 7.75
$ 18,755.00
2,463
FT
$ 7.75
$ 19,088.25
5B
2" Conduit from Station 0+00 to Station 0+52
1
LS
$ 5,900.00
$ 5,900.00
1
LS
$ 5,900.00
$ 5,900.00
5C
10" Pipe at Station 2+98
1
LS
$ 3,475.00
$ 3,475.00
1
LS
$ 3,475.00
$ 3,475.00
5D
10" Pipe at Station 18+80
1
LS
$ 3,475.00
$ 3,475.00
1
LS
$ 3,475.00
$ 3,475.00
5E
2" Conduit from Station 23+96 to Station 24+26.36
1
LS
$ 6,775.00
$ 6.775.00
1
LS
$ 6,775.00
$ 6,775.00
5F
Rock Excavation
1
HRS
$ 675.00
$ 675.00
0
HRS
$ 675.00
$ -
5G
AC Pavement and Base (trench restoration)
425
SF
$ 23.05
$ 9,796.25
328
SF
$ 23.05
$ 7,560.40
5H
Additional''/2" Thickness of AC Pavement (trench restoration)
425
SF
$ 3.15
$ 1,338.75
1,312
SF
$ 3.15
$ 4,132.80
51
All Other Work Required by the Contract Documents
1
LS
$ 1o,000.00
$ 10,000.00
1
LS
$ 10,000.00
$ 10,000.00
Total Amount of Base Bid
$ 1,478,273.75 $ 1,430,676.46
Credit to the District $ 47,597.29
Page 3 of 5
Resolution No. 2015 - 21
AUTHORIZING THE ACCEPTANCE OF
THE DISTRICT PIPELINE REPLACEMENT - 2015 PROJECT
AND DIRECTING FILING OF THE NOTICE OF COMPLETION
WHEREAS, the Board of Directors of the Truckee Donner Public Utility District made the determination to
undertake the District Pipeline Replacement - 2015 Project and
WHEREAS, AMX-Construction Inc. was selected by the District to perform the work; and
WHEREAS, AMX-Construction Inc. has completed all of the work included in the Project; and
WHEREAS, The District's Water System Engineer, Neil Kaufman, now certifies the completion of the project; and
WHEREAS, the District's Water Utility Manager/General Manager, Michael D. Holley, has recommended that the
work be accepted by the District;
NOW THEREFORE BE IT RESOLVED by the Board of Directors of the District as follows:
1. That the District hereby accepts the District Pipeline Replacement - 2015 Project as complete.
2. That the Clerk of the District be directed to file with the County of Nevada the Notice of Completion, a copy
of which is attached hereto.
3. That 35 days following the filing of the Notice of Completion, the monies retained from the contractor
payments be released to the contractor if no claims have been made to the District by material suppliers,
laborers, or sub -contractors.
PASSED AND ADOPTED by the Board of Directors at a meeting duly called and held within the District on the
fourth day of November 2015 by the following roll call vote:
AYES:
NOES: None
ABSTAIN: None
ABSENT: None
TRUCKEE DONNER PUBLIC UTILITY DISTRICT
By
Bob Ellis, President of the Board
ATTEST:
Michael D. Holley, Clerk of the Board
Page 4 of 5
RECORDING REQUESTED BY:
Truckee Donner Public Utility District
WHEN RECORDED, RETURN TO:
TRUCKEE DONNER PUBLIC UTILITY DISTRICT
11570 Donner Pass Road
Truckee, CA 96161
THE UNDERSIGNED DECLARES
DOCUMENTARY TRANSFER TAX - NONE
NOTICE OF COMPLETION
NOTICE IS HEREBY GIVEN:
1. That the name and address of the public entity for whom the improvement project was done, as owner
thereof, is the Truckee Donner Public Utility District, 11570 Donner Pass Road, Truckee, CA
96161.
2. Nature of interest or estate of owner: beneficial interest of a public utility easement for installation of
water facilities.
3. That on November 4, 2015 the hereinafter described improvements were accepted as complete
pursuant to Resolution 2015-21 of the Truckee Donner Public Utility District, the awarding authority.
4. That the subject improvements of the Notice are generally described and identified as follows: District
Pipeline Replacement - 2015 Project.
5. That the name and address of the contractor for such project was: AMX-Construction Inc. P.O. Box
3605, Loomis, CA 96160.
I certify under penalty of perjury under the laws of the State of
California that the foregoing is true and correct.
Dated: November 4, 2015 TRUCKEE DONNER PUBLIC UTILITY DISTRICT
M
Michael D. Holley, General Manager
MAIL TAX STATEMENTS TO:
SAME AS ABOVE
Legal References: CC-3093,CCP-2003 (oath), 2015.5 (unsworn statement)
Page 5 of 5