HomeMy WebLinkAbout7 Sun Valley CompletionCONSENT To: Board of Directors From: Neil Kaufman Date: December 09, 2015 Subject: Notice of Completion Sun Valley Pipeline Replacement 1. WHY THIS MATTER IS BEFORE THE BOARD 2. HISTORY In August 2015, the Board awarded the construction contract for the Sun Valley Road Pipeline Replacement project to Longo Incorporated of Tahoe City, California. The project involved replacement of about 750 feet of pipeline along Sun Valley Road. The original bid price was $225,634. At the time of award, the Board also established a 10 percent change order allowance for a total for a total authorization not to exceed $248,000. 3. NEW INFORMATION Longo began work in September and completed the construction in early November. District staff has performed a final walkthrough on the project. The work is complete and should be accepted by the District. There were no change order requests submitted by the contractor. The contract is based on a unit price bid. Attachment 1 shows the differences between bid totals and the amounts actually constructed. This analysis results in a $3,883 credit to the District. Attached is a draft resolution 2015-23 (Attachment 2) accepting the project and directing that a Notice of Completion be filed. 4. FISCAL IMPACT The original bid price was $225,634. Once an adjustment is made to reconcile the bid quantities versus the actually constructed quantities, the final contract price is $221,751. As discussed at the time of award, the anticipated funding source for the project is the Water Department Capital Replacement Fund. Once that fund is depleted the anticipated funding source for the project is the Water Department Operating Reserve Fund. 5. RECOMMENDATION Adopt Resolution 2015-23 accepting the Sun Valley Road Pipeline Replacement project as complete and authorize the filing of the Notice of Completion. Michael D. Holley General Manager / Water Utility Manager Analysis of Bid Quantities vs. Actual Quantities Constructed Sun Valley Road Pipeline Replacement Contractor: Longo Incorporated Bid Item Description Bid Amounts Actual Amounts Quantity Units Unit Price I Subtotal Quantity Units I Unit Price Subtotal 1 Mobilization 1 LS $ 15,500.00 $ 15,500.00 1 LS $ 15,500.00 $ 15,500.00 2 8" Water Main 745 FT $ 96.00 $ 71,520.00 754 FT $ 96.00 $ 72,384.00 3 2" PE Water Service Lateral 300 FT $ 84.00 $ 25,200.00 312 FT $ 84.00 $ 26,208.00 4 Two 1" PE Water Service Laterals in Common Trench 12 FT $ 72.00 $ 864.00 27 FT $ 72.00 $ 1,944.00 5 Double Water Service (DS) 4 EA $ 3,500.00 $ 14,000.00 4 EA $ 3,500.00 $ 14,000.00 6 Double Water Service with One Lot Vacant (DSV) 4 EA $ 3,200.00 $ 12,800.00 3 EA $ 3,200.00 $ 9,600.00 7 Connect New 2" Lateral to Existing Meter Box at 11464 Sun Valley Road 1 LS $ 2,800.00 $ 2,800.00 1 LS $ 2,800.00 $ 2,800.00 8 Fire Hydrant Assemby 1 EA $ 8,700.00 $ 8,700.00 1 EA $ 8,700.00 $ 8,700.00 9 Air Release Valve Assembly 1 EA $ 4,300.00 $ 4,300.00 1 EA $ 4,300.00 $ 4,300.00 10 Connection to Existing 8" Pipe at Station 0+00 1 EA $ 5,750.00 $ 5,750.00 1 EA $ 5,750.00 $ 5,750.00 11 Connection to Existing 8" Pipe at Station 7+45.02 1 EA $ 5,750.00 $ 5,750.00 1 EA $ 5,750.00 $ 5,750.00 12 Rock Excavation 2 HRS $ 1,000.00 $ 2,000.00 7 HRS $ 1,000.00 $ 7,000.00 13 AC Pavement and Base (trench restoration) 5,800 SF $ 8.50 $ 49,300.00 4,890 SF $ 8.50 $ 41,565.00 14 Additional 1/2" Thickness of AC Pavement (trench restoration) 5,800 SF $ 0.75 $ 4,350.00 4,600 SF $ 0.75 $ 3,450.00 15 All Other Work Required by the Contract Documents 1 LS $ 2,800.00 1 $ 2,800.00 1 LS $ 2,800.00 1 $ 2,800.00 $ 225,634.00 $ 221,751.00 Credit to the District $ 3,883.00 Resolution No. 2015 - 23 AUTHORIZING THE ACCEPTANCE OF THE DISTRICT PIPELINE REPLACEMENT - SUN VALLEY ROAD 2015 PROJECT AND DIRECTING FILING OF THE NOTICE OF COMPLETION WHEREAS, the Board of Directors of the Truckee Donner Public Utility District made the determination to undertake the Sun Valley Road Pipeline 2015 Project and WHEREAS, Longo Incorporated was selected by the District to perform the work; and WHEREAS, Longo Incorporated has completed all of the work included in the Project; and WHEREAS, The District's Water System Engineer, Neil Kaufman, now certifies the completion of the project; and WHEREAS, the District's Water Utility Manager/General Manager, Michael D. Holley, has recommended that the work be accepted by the District; NOW THEREFORE BE IT RESOLVED by the Board of Directors of the District as follows: 1. That the District hereby accepts the Sun Valley Road Pipeline 2015 Project as complete. 2. That the Clerk of the District be directed to file with the County of Nevada the Notice of Completion, a copy of which is attached hereto. 3. That 35 days following the filing of the Notice of Completion, the monies retained from the contractor payments be released to the contractor if no claims have been made to the District by material suppliers, laborers, or sub -contractors. PASSED AND ADOPTED by the Board of Directors at a meeting duly called and held within the District on the ninth day of December 2015 by the following roll call vote: AYES: NOES: ABSTAIN: ABSENT: TRUCKEE DONNER PUBLIC UTILITY DISTRICT By Bob Ellis, President of the Board ATTEST: Michael D. Holley, Clerk of the Board RECORDING REQUESTED BY: Truckee Donner Public Utility District WHEN RECORDED, RETURN TO: TRUCKEE DONNER PUBLIC UTILITY DISTRICT Shanna D. Kuhlemier, Deputy District Clerk 11570 Donner Pass Road Truckee, CA 96161 THE UNDERSIGNED DECLARES DOCUMENTARY TRANSFER TAX - NONE NOTICE OF COMPLETION NOTICE IS HEREBY GIVEN: That the name and address of the public entity for whom the improvement project was done, as owner thereof, is the Truckee Donner Public Utility District, 11570 Donner Pass Road, Truckee, CA 96161. 2. Nature of interest or estate of owner: beneficial interest of a public utility easement for installation of water facilities. 3. That on December 9, 2015 the hereinafter described improvements were accepted as complete pursuant to Resolution 2015-23 of the Truckee Donner Public Utility District, the awarding authority. 4. That the subject improvements of the Notice are generally described and identified as follows: Sun Valley Pipeline 2015 Project. 5. That the name and address of the contractor for such project was: Longo Incorporated, P.O. Box 6177, Tahoe City, CA 96145 I certify under penalty of perjury under the laws of the State of California that the foregoing is true and correct. Dated: December 9, 2015 TRUCKEE DONNER PUBLIC UTILITY DISTRICT Michael D. Holley, General Manager MAIL TAX STATEMENTS TO: SAME AS ABOVE Legal References: CC-3093,CCP-2003 (oath), 2015.5 (unsworn statement)