Loading...
HomeMy WebLinkAbout8 Contract SA Engineering SCADAAgenda ' • L& TRUCKEE DONNER Public Utility District CONSENT To: Board of Directors From: Ian Fitzgerald Date: December 09, 2015 Subject: Contract with SA Engineering Inc. for SCADA Troubleshooting and Programming 1. WHY THIS MATTER IS BEFORE THE BOARD The District Code requires Board approval for all purchases over $15,000. 2. HISTORY The District has been running the Sandal -Avery Water SCADA since the early 1990's. The SCADA system is designed to run on a BSD Unix operating system (OS) platform. This is very old technology, District staff is familiar with the system, but not experts with this OS. Since installation, the District has not had a software support maintenance agreement to maintain the SCADA system with SA Engineering. The system was also designed to operate with a wideband radio communication system. On January 1, 2013, the FCC required all wideband users to switch to narrowband radio technology. The District was mandated to make this switch or face FCC fines and penalties. Due to lack of support, and the requirement to reduce our radio bandwidth, the SCADA system has be constantly degrading in its reliability. The District is in the process of replacing the Sandal -Avery SCADA with a newer, more supported platform, Wonderware. This replacement is now operating the Donner Lake water system and will be running the Glenshire water system very shortly. The Sandal -Avery system is slated to begin replacement next spring, starting with our well locations. This replacement however, will take several years to complete. 3. NEW INFORMATION SA Engineering has provided a proposal to help troubleshoot and re -program the Sandal -Avery SCADA to accommodate for the narrowband radio changeover, and fix any issues that have been defined by the Water Operations Team. SA Engineering developed the Sandal -Avery SCADA for the District back in the early 1990's. They are the only people who understand how the system is programmed, how to fix the issues, if they can be fixed, and how to reprogram the existing software and board hardware. Therefore, this is a sole source procurement. The proposal is time & materials with an hourly rate of $150/hour and materials of cost plus 10%. 4. FISCAL IMPACT Sufficient funds exist in the FY15 Water Operations Budget for this project with an amount not to exceed $40,000. 5. RECOMMENDATION Authorize the General Manager to execute a contract with SA Engineering for Sandal - Avery Water SCADA troubleshooting and programing services with an amount not to exceed $40,000. Stephen Hollabaugh Assistant General Manager Michael D. Holley General Manager 2900 Fantasy Lane SAENGINEERING, INC. Sparks, NV 89441-8593 Turning Ideas into Circuits since 1976 Tel: (775) 425-8000 Fax: (775) 425-3000 2015 Rates for Professional Services Engineer 1 $150.00 Engineer II $112.00 Expert Witness $275.00 Programer 1 $150.00 Programer II $112.00 CAD - schematic & PCB $ 99.00 Technician $ 75.00 Secretarial $ 53.00 Parts & expenses: Under $100 cost + 20% $100 - $5,000 cost + 15% Over $5,000 cost +10%