Loading...
HomeMy WebLinkAbout7 Payment to Town of Truckee Paving Projects Consent Item #7Multiple Paving ProjectsUtility Work Associated with the Town of Truckee for Water Consideration of Reimbursement to Multiple Paving ProjectsUtility Work Associated with the Town of Truckee for Water Consideration of Reimbursement to February 7, 2018 Consideration of Reimbursement to the Town of Truckee for Water Utility Work adjustmentsthe District for costs associated with the water utility valve and box Following the completion of the project, the Town of Truckee invoices •boundariesDistrict owned water utility valve and box covers within the project roject scope of work includes the excavation and adjustment of P•projects through a competitive and public bidding processThe Town of Truckee awards construction contracts for these •town public right of ways on an annual basisThe Town of Truckee manages paving and drainage projects along •BACKGROUND / HISTORY Associated with Multiple Paving ProjectsConsideration of Reimbursement to the Town of Truckee for Water Utility Work Associated with Multiple Paving Projects NEW INFORMATION excavation and adjustment of water utility assetsIncluded in the scope of work for each of these projects was the •Improvement Project (CIP C1605), awarded to Granite ConstructionDrive/Dorchester Drive Pedestrian and Bicycle GlenshireThe •Inc.Road Project (CIP C1604), awarded to Sierra Nevada Construction, The Brockway Road Corridor, East River St. and Donner Pass •projects:In 2017 the Town of Truckee conducted two paving and drainage •Associated with Multiple Paving ProjectsConsideration of Reimbursement to the Town of Truckee for Water Utility Work Associated with Multiple Paving ProjectsConsideration of Reimbursement to the Town of Truckee for Water Utility Work NEW INFORMATION amount of $29,345.59 00000037 in the -Improvement Project, (CIP C1605), Invoice #2018Drive, Dorchester Drive Pedestrian and Bicycle lenshireG•amount of $16,854.7100000030 in the -Improvement Project, (CIP C1604), Invoice #2018Brockway Road Corridor, East River Street and Donner Pass Road •projects as follows:valve/box adjustments and other associated work for each of these On January 3, 2018, the District received invoices for the water utility •Associated with Multiple Paving ProjectsConsideration of Reimbursement to the Town of Truckee for Water Utility Work Associated with Multiple Paving ProjectsConsideration of Reimbursement to the Town of Truckee for Water Utility Work NEW INFORMATION$29,345.59Total00000037-Invoice #2018$4,645.59$4,645.591Change Order #2$24,700.00$1,300.0019Water Valve/Box AdjustmentTotal PriceUnit PriceQuantityDescriptionDr./Dorchester Dr. Pedestrian and Bicycle Improvement ProjectGlenshire$16,854.71Total00000030-Invoice #2018$1,454.71$1,454.711Water Line Repair (8/23/17)$(1,100.00)$(1,100.00)1CreditWater Valve Adjustment$16,500.0 0$1,100.0015Water Valve/Box AdjustmentsTotal PriceUnit PriceQuantityDescriptionRiver St. and Donner Pass Rd. Improvement Project A breakdown of the invoices has been provided below:•Associated with Multiple Paving ProjectsConsideration of Reimbursement to the Town of Truckee for Water Utility Work Associated with Multiple Paving ProjectsConsideration of Reimbursement to the Town of Truckee for Water Utility Work FISCAL IMPACT Capital Budget and will be funded from the Water General FundSufficient funds exist in the Board approved FY18 and FY19 Water •Associated with Multiple Paving ProjectsConsideration of Reimbursement to the Town of Truckee for Water Utility Work Associated with Multiple Paving ProjectsConsideration of Reimbursement to the Town of Truckee for Water Utility Work RECOMMENDATION amount of $46,200.3000000037 in the amount of $29,345.59, for a total -invoice #201800000030 in the amount of $16,854.71 and -Truckee for invoice #2018Authorize the General Manager to remit payment to the Town of •Associated with Multiple Paving ProjectsConsideration of Reimbursement to the Town of Truckee for Water Utility Work Associated with Multiple Paving ProjectsConsideration of Reimbursement to the Town of Truckee for Water Utility Work