Loading...
HomeMy WebLinkAboutORD 2021-03 - Board (2) DocuSign Envelope ID:623F35CB-98A6-4E72-A290-1 FC73151 CBC8 PublicDistrict Ordinance No. 2021 -03 ADOPTING AMENDMENTS TO THE DISCTRICT CODE APPENDIX C WHEREAS, District Code provides rules and regulations intended to convey a comprehensive description of the manner in which the District operates, handles its finances and performs its accounting; and WHEREAS, the District has identified the need to make amendments to Appendix C, Miscellaneous Fees; and WHEREAS,this matter was noticed as a Public Hearing in advance and said Public Hearing was held on July 7, 2021; and NOW THEREFORE BE IT RESOLVED by the Board of Directors of the District as follows: 1) Rescind Ordinance 2017-01 and all previously adopted Ordinances related to miscellaneous fee schedule. 2) The Board does hereby adopt and amend District Code Appendix C, fee schedule attached here to of this Ordinance. PASSED AND ADOPTED by the Board of Directors at a meeting duly called and held within the District on the 7'" day of July 2021, by the following roll call vote: AYES: Directors: Aguera, Bender, Harris, Vice President Laliotis, President Finn. NOES: None. ABSTAIN: None. ABSENT: None. TRUCKEE DONNER PUBLIC UTILITY DISTRICT DocuSigned by: B V't,Si Ft-v" Ch ' EFlnrpz4"res!dent of the Board DocuSigned by: ATTEST S" 6 ,,u,, Shanna D. Kuhlemier, CMC, District Clerk DocuSign Envelope ID:623F35CB-98A6-4E72-A290-1 FC73151 CBC8 Recommended Changes are in RED TEXT Appendix C - Miscellaneous Fees Electric and Water Amount Account, new account setup, electric and water(no charge for automatic transfers $60 Excavation or snow removal $300 Facilities, security lights, monthly service, 10OW (or equivalent) $15 Facilities, security lights, monthly service, 20OW (or equivalent) $20 Facilities, security lights, monthly service, 30OW (or equivalent) $30 Facilities, security lights, permanent relocation Actual Cost Meter, electric and water, special read $30 Meter, electric, replacement, standard polyphase $725 Meter, electric, replacement, standard single phase $160 Meter, electric, resealing (no charge for first occurrence in 36 months) $115 Meter, electric, testing (no charge for first occurrence in 36 months; no charge for 2%fast) $65 Meter, water, test(no charge once per 36 months, no charge for 2%fast) $150 Meter, water, illegal hook up $1,000 Mobilization Fee $247 Payment, monthly late payment fee, account balance greater than $50 1.5%; $10 min Payment, returned payment charge $25 Service, electric and water, permanent relocation Actual Cost Service, electric, temporary service removal and reinstallation (no charge for tree removals during normal business hours) Actual Cost Solar Connection Flat Fee for Residential Connections $550 Trip charge, disconnect for non-payment or non-compliance $40 Trip charge, hand-deliver notices $10 Backflow and Cross-Connection Control Fees DocuSign Envelope ID:623F35CB-98A6-4E72-A290-1 FC73151 CBC8 Backflow Assembly Annual Test Submittal 65 Backflow Assembly Test Submittal Late Fee (30 Days) 25 Site Inspection/Site Survey Fee 130 Water Service Reconnection for Backflow Test Failure or Non-compliance 130 Cross-Connection Violation (unauthorized removal or modification of District approved assembly) 500 Other Application fee, abandoning or granting easements, nonrefundable $500 Application fee, placement of wireless communication, nonrefundable $500 Application fee, permission to use paved District easement, nonrefundable $500 Application fee, variance of water service requirements, nonrefundable $500 Document Printing &Copying per page (No charge for first 100 pages; no charge for copies of a customer's own records) $0.10 Encroachment permit costs, annual -8.30.070.1 Category 1 (Minor) $150 Encroachment permit costs, annual -8.30.070.2 Category 2 (Major) $500 Encroachment permit costs, annual -8.30.070.3 Category 3 (Special) $1,000 Repair or Replacement of any District Facilities Actual Cost Room rental, daily/event $100