Loading...
HomeMy WebLinkAboutORD 2014-02 - Board 0 TRUCKEE DONNER Publ D strict • Ordinance No. 2014 - 02 AMEND ELECTRIC FEE SCHEDULE WHEREAS, on September 6, 2006, an ordinance was adopted to establish certain electrical costs as flat fees rather than billing the actual cost; and WHEREAS, on February 6, 2008, an ordinance was adopted to amend those fees; and WHEREAS, on April 16, 2014, a workshop was held to recommend an increase to reflect the average actual costs of relocating overhead power service and to provide temporary power; and to recommend combining several fees for single phase connection with other fees. NOW, THEREFORE, BE IT ENACTED by the Board of Directors of the Truckee Donner Public Utility District as follows: ELECTRIC FEES Size and Type of Service Fee Single Phase, 120/240 Service— 200 amp• 1) Permanent connection to structure $1,248 2) Temporary connection to customer-owned power pole and $1,534 subsequent transfer to structure Single Phase, 120/240 Service—400 amp 1) Permanent connection to structure $2,364 2) Temporary connection to customer-owned power pole; removal of same and installation of underground permanent $2,649 service to structure Three phase, 208v, 240v or 480v service 1) Permanent connection to structure Actual Cost 2) Temporary single phase 120/240 service for construction Actual Cost purposes to become three-phase permanent service to structure Overhead to Underground upgrade or relocate, up to 200 amp panel $1,248 Overhead Relocation $467 400 amp upgrade $1,854 Underground Relocation up to 200 amp $1,248 Underground Relocation 400 amp $2,364 Temporary overhead service $1,248 • Overhead to Underground upgrade or relocate, up to 200 amp panel, $1,534 with TPP (Temp to Permanent Installation) 1 Ordinance 2014-02 Section 3. If no protest is made pursuant to Public Utilities Code Section 16078, then this • ordinance shall be effective on June 21, 2014, after adoption by the board of directors of the District. Section 4. The Clerk of the District shall immediately cause a copy of this ordinance to be published in a newspaper of general circulation and posted in three places within the District. Section 5. The provisions of other Ordinances shall remain if effect to the extent that they do not conflict with this ordinance. PASSED AND ADOPTED by the Board of Directors of the Truckee Donner Public Utility District at a meeting duly called and held within the District on the twenty first day of May 2014 by the following roll call vote: AYES: Directors Aguera, Bender, Ellis, Hemig and Laliotis NOES: None ABSTAIN: None ABSENT: None • TRUCKEE ONNERR PUBLIC UTILITY DISTRICT By ./ / Tony Laliotis President of the Board ATTEST: Michael D. Holley, Clerk of the Board • • 2 Ordinance 2014-02