HomeMy WebLinkAbout7-1MVGMP-Objectives and ImplementationAttachment 1
Basin Management Objectives (BMO)
and Implementation Actions
6" 111Lta6 of Astlar
1 Develop and Implement a summary report every flea yeas that
Includes:
Awmmrna aannedne naWa, eillredrwraan orNfOtded aendr
Aeummardmsneparat aeeero durineM graded eewndq ties ryat
• 1l eteawbn efvdwawr aetloro ra eerdaws gebaar tornrdr ntatha
9.1Da
t Formollea and irodtute a Stakeholder Worlds Group to most at
least annually or as needed on GMP Inplementetion activities and
Annually
2 Collaborate with the LRWGCB to limit the migration of
contaminated groundwater and In development offarp wale
As Needed
contamination dean up programs
1. Work cooporstMly, with local stakeholders and local, State and
Federal agendas an groundwater management acMMlaa, projects
Ongoing
and stunfles
4. Wordily opportunities for public hwohement during plan
Ongoing
Implementation p
aos�rnar��aosaaaeae.
3. Establish and maintain a CA46EM compliant monModnj program
Ongoing
2.. Continua and encourage water conservation ectlN6q and public
Ongoing
education
3 Work with local stakeholders and DWR to Idenfly oreas that
may need additional groundwater levol and groundwater quality
Annually
monitoring bawd on Identified date gaps a negativeperforms ce
fronds Implementation
4 Coordinate with other agencies, Including DWR and the USGS to
As Needed
Identify opportunities for land subsidence monitoring
S Evaluate the need for, and advocate for. as necessary, a walihood
protection, groundwater recharge area protection, and other
As Needed
programs as necessary In MVOB
6. Map and sham groundwater recharge zwea
Ongoing
i. Provide mNvant Information to lard use agencies agmding
Needed
groudwral ravaUaWpry
As
11- Work with State and Federal agend" to attempt to were
funding for expansion of the partner Agencies montoring grid k Ongoing
2. Maintain ralstloeship with OWR for groundwater monAodng and jTf
database management activities Ongoing
1. ldemHy opportunities for collecting were, quality monitoring date As Available
4. Use and consider updatingtho hydrologic model to Improve Ongoing
of groundwater In the MVGB
S Seek nowtoole, technology, and IMormstlon the may Imi m o tat
understanding of the water resources In the WKS and watershed OngdAg
6 Use the bast eva6able date to Infant and link agency
Interdependent planning domrments (Le. aban vsvar
management plan, water supply analyses, and water master Ongolnu
plena) !
Oeaaf►peaMAsfHtt wide
hothda
i Consider local, State, or Federal riparian, surface water, or surfaco '
water-doundwata Interaction levastigagons. studies or programs As Needed
in the MVGB.
2. Continue support and collaboration with coal group. that ldentify,
coordinate, or Implement pro).Ct.tMt support the wan" Ongohng
sustainabWy of tat MUGS.
®R=-- 0)(PCWA ` ®=-