Loading...
HomeMy WebLinkAbout7-1MVGMP-Objectives and ImplementationAttachment 1 Basin Management Objectives (BMO) and Implementation Actions 6" 111Lta6 of Astlar 1 Develop and Implement a summary report every flea yeas that Includes: Awmmrna aannedne naWa, eillredrwraan orNfOtded aendr Aeummardmsneparat aeeero durineM graded eewndq ties ryat • 1l eteawbn efvdwawr aetloro ra eerdaws gebaar tornrdr ntatha 9.1Da t Formollea and irodtute a Stakeholder Worlds Group to most at least annually or as needed on GMP Inplementetion activities and Annually 2 Collaborate with the LRWGCB to limit the migration of contaminated groundwater and In development offarp wale As Needed contamination dean up programs 1. Work cooporstMly, with local stakeholders and local, State and Federal agendas an groundwater management acMMlaa, projects Ongoing and stunfles 4. Wordily opportunities for public hwohement during plan Ongoing Implementation p aos�rnar��aosaaaeae. 3. Establish and maintain a CA46EM compliant monModnj program Ongoing 2.. Continua and encourage water conservation ectlN6q and public Ongoing education 3 Work with local stakeholders and DWR to Idenfly oreas that may need additional groundwater levol and groundwater quality Annually monitoring bawd on Identified date gaps a negativeperforms ce fronds Implementation 4 Coordinate with other agencies, Including DWR and the USGS to As Needed Identify opportunities for land subsidence monitoring S Evaluate the need for, and advocate for. as necessary, a walihood protection, groundwater recharge area protection, and other As Needed programs as necessary In MVOB 6. Map and sham groundwater recharge zwea Ongoing i. Provide mNvant Information to lard use agencies agmding Needed groudwral ravaUaWpry As 11- Work with State and Federal agend" to attempt to were funding for expansion of the partner Agencies montoring grid k Ongoing 2. Maintain ralstloeship with OWR for groundwater monAodng and jTf database management activities Ongoing 1. ldemHy opportunities for collecting were, quality monitoring date As Available 4. Use and consider updatingtho hydrologic model to Improve Ongoing of groundwater In the MVGB S Seek nowtoole, technology, and IMormstlon the may Imi m o tat understanding of the water resources In the WKS and watershed OngdAg 6 Use the bast eva6able date to Infant and link agency Interdependent planning domrments (Le. aban vsvar management plan, water supply analyses, and water master Ongolnu plena) ! Oeaaf►peaMAsfHtt wide hothda i Consider local, State, or Federal riparian, surface water, or surfaco ' water-doundwata Interaction levastigagons. studies or programs As Needed in the MVGB. 2. Continue support and collaboration with coal group. that ldentify, coordinate, or Implement pro).Ct.tMt support the wan" Ongohng sustainabWy of tat MUGS. ®R=-- 0)(PCWA ` ®=-