Loading...
HomeMy WebLinkAbout9 High Efficiency Boilers1 • TRUC EE D 11 NE Public Utility District CONSENT To: Board of Directors From: Kathleen Neus Date: February 20, 2013 Subject: Consideration of a Resolution Accepting Completion of the District High Efficiency Boilers and Authorize the Filing of a Notice of Completion 1. WHY THIS MATTER IS BEFORE THE BOARD The District High Efficiency Boiler Replacement project is complete. A resolution accepting the project requires Board approval. 2. HISTORY Besides being old and deficient, the District's current boilers were identified in the TDPUD Building Energy Use Assessment and Improvement Study prepared by Enovity Inc. as one area that could use significant improvement. This project includes the removal and demolition of the boilers, pumps, plumbing as it relates to the boilers and the local control panel. In addition, the contractor will be required to protect all other equipment within the boiler room and the new carpeting. • The Board awarded the project to Efficient Energy Concepts (EEC) of Chico, California at the August 1, 2012 Board meeting. The contract was for the amount of $86,924 plus a 20% change order authorization for a total amount not to exceed $104,309. 3. NEW INFORMATION The Boiler Replacement Project is now complete. There were two change orders: 1) Increase the efficiency of the boilers 2) Time extension of two weeks Total price of the Boiler Replacement Project including change orders is $91,624. The resolution accepting the project as complete is included as Attachment 1. 4. FISCAL IMPACT There is sufficient funds in the approved FY12 for this project. Increasing the overall efficiency of the boiler will result in a lifetime savings of approximately $150,000. 5. RECOMMENDATION Adopt Resolution 2013-03 accepting the District High Efficiency Boiler Replacement project as complete and authorize the filing of a Notice of Completion. Michael D. Holley General Manager