POOLING APPENDIX
This Pooling Appendix made 55t day of February, 2013 between Utah Associated Municipal Power
Systems ("UAMPS"), City of Fallon, Nevada ("Fallon") and Truckee Donner Public Utilities District ("Truckee
Donner"). UAMPS, Fallon and Truckee Donner are sometimes individually referred to herein as Party and
sometimes collectively referred to herein as Parties. The Parties to this Pooling Appendix agree to the
following provisions and agree to pay all costs of this transaction through the UAMPS monthly power bill.
PURPOSE
Fallon and Truckee Donner have entered into a Western Area Power Administration Contract # 07-
NSR-01026 for Energy Exchange Services for the Stampede Resource. [Non-UAMPS Project]
AUTHORITIES AND RESPONSIBILITIES
The Parties have agreed that all of the Stampede Resource will be delivered to Truckee Donner
beginning February 1, 2010. In exchange, Truckee Donner will sell 500 kW of its UAMPS resource mix to
Fallon at a rate of $32/MWh, subject to annual true -up below, minus the REC valuation and UAMPS
transmission rate. The REC valuation is calculated as the average of the WECC Green-E Wind (wregis)
Bid and Offer prices as listed in the bi-annual table attached hereto as Exhibit A. The transmission rate is
determined by the UAMPS Board of Directors annually.
Truckee Donner will provide to UAMPS a schedule of output of the Stampede Resource on a
prescheduled basis in order to allow UAMPS to meet its obligations to schedule the resource with Sierra
Pacific Power Company ("SPPC"). Schedules will be in whole megawatts with the difference between
metered generation and schedule accounted for as a metered resource of Truckee Donner subject to such
accounting being accepted by SPPC. Truckee Donner shall notify UAMPS of any planned service
interruption at least twenty-four hours prior to the interruption occurrence.
The Parties agree that during January of each year, a true up of MWh and dollars will be evaluated
and agreed upon by Truckee Donner and Fallon.
TERM
The term of this Appendix begins January 1, 2014 through December 31, 2018 unless terminated
by a Party providing 60 day written notice to the other Parties. Any termination prior to December 31, 2018,
will require an agreement of Truckee Donner and Fallon on an energy delivery methodology beginning the
first day of the month following the termination date.
CHARGES
Administration: UAMPS will charge and Truckee Donner and Fallon will pay the scheduling and
reserve fees as adopted by the Board of Directors, from time to time, for all MWh delivered. The charges
will be invoiced to Truckee Donner and Fallon on the UAMPS Power Bill.
Attachment 1
Wheeling: Truckee Donner and Fallon are providing the transmission service through their
respective service agreements under the SPPC GATT.
Other. Any other cost incurred by UAMPS due solely to this Pooling Appendix, including REC
fees, legal costs or another other costs, with the exception of transmission costs, scheduling costs, power
purchase costs and administration costs, will be the responsibility of Truckee Donner and invoiced through
the UAMPS Power Bill.
Dated this day of .12013.
TRUCKEE DONNER PUBLIC CITY OF FALLCN
UTILITY DISTRICT
UTAH ASSOCIATED MUNICIPAL POWER
SYSTEMS
Attachment 1
1
Z
x
W
U
W
Co
\/0
M
r
N
Vt
a a�i
E u
z p
aD
9M
O
Cu
z
Cu
y
o `w
E
. a
� T
,Cu
u E
`o
Cu
w
i n
i E
u
i
� u
i u
m
� c
w
1 L
L
w
i
v o
c
m y �
1
fU
L
o
0 n
CD
9
In Lnn
= N
Co
m kFF
N
01
O
7
LL
C
Co tl
x N
LL
6
m
9 G
m o
N
m iA-
H
N6
O
O
LL
LLtR
V v
3