HomeMy WebLinkAbout10-2,Executive SummaryAttachment 2
ES EXECUTIVE SUMMARY
Attachment 2
ES EXECUTIVE SUMMARY
This section provides an overview of the project and the environmental analysis. For additional
detail regarding specific issues, please consult the appropriate section of the environmental
analysis (i.e., Sections 3.1 through 3.3).
ES1 PURPOSE AND SCOPE OF THE ENVIRONMENTAL IMPACT REPORT
This Environmental Impact Report (EIR) has been prepared by the Nevada County Local Agency
Formation Commission (LAFCo) to analyze the potential environmental effects associated with
implementation of the proposed Sphere of Influence Update for the Truckee Donner Public Utility
District (TDPUD; District) in Nevada, Placer, and Sierra counties, California. This EIR evaluates
environmental impacts within the TDPUD service area for both the LAFCo-recommended Sphere
of Influence (SOI) and the District -preferred SOL The current TDPUD SOI boundary, which was
established in 1983 and updated in 1998, encompasses the Town of Truckee and
unincorporated areas of Nevada and Placer counties adjacent to the town.
ES2 PROJECT SUMMARY
The TDPUD is a multicounty special district that provides water and electric utility services. The
District currently serves approximately 12,500 water customers and 13,000 electricity customers.
The electricity department owns and operates approximately 133 miles of primary overhead
and 82 miles of primary underground electrical distribution circuits. Power is provided through
4 electrical substations and 15 distribution circuits throughout Truckee. The TDPUD provides
electricity to residential, commercial, and other uses within the boundaries of the district. The
TDPUD water system includes 216 miles of pipeline, 16 active wells, and 33 storage reservoirs.
Groundwater comes from the Martis Valley Groundwater Basin.
The proposed project consists of the update of the TDPUD's SOL This EIR will review two potential
SOI boundary options supporting LAFCo's mandated five-year review of the TDPUD SOI and
service plan. The first option is identified as the LAFCo-recommended SOI option, and the
second is identified as the District -preferred SOI option.
ES3 PROJECT ALTERNATIVES SUMMARY
CEQA Guidelines Section 15126.6 requires that an EIR describe a range of reasonable
alternatives to the project that could feasibly attain the basic objectives of the project and
reduce the degree of environmental impact. Section 4.0, Project Alternatives, provides a
qualitative analysis of four scenarios:
• Alternative 1 - No Project Alternative
• Alternative 2 - Combined Sphere of Influence Area
• Alternative 3 - Northstar Only
• Alternative 4 - Reduced Stampede Reservoir Area
Nevada County LAFCo Sphere of Influence Update - Truckee Donner Public Utility District
February 2013 Draft Environmental Impact Report
ES-1
Attachment 2
ES EXECUTIVE SUMMARY
ES4 AREAS OF CONTROVERSYASSUES TO BE RESOLVED
Nevada County LAFCo was identified as the lead agency for the proposed project. In
accordance with Section 15082 of the CEQA Guidelines, Nevada County LAFCo prepared and
distributed a Notice of Preparation (NOP) of an EIR on June 29, 2012. See Section 1.0,
Introduction, for an expanded discussion of the NOP process and project -related comments
from interested parties.
ES5 SUMMARY OF ENVIRONMENTAL IMPACTS
Table ES-1 displays a summary of project impacts and proposed mitigation measures that would
avoid or minimize potential impacts. In the table, the level of significance is indicated both
before and after the implementation of each mitigation measure.
For detailed discussions of all mitigation measures and policies that would provide mitigation for
each type of environmental impact addressed in this Draft EIR, refer to the appropriate
environmental topic section (i.e., Sections 3.1 through 3.3).
Implementation of the proposed project is anticipated to result in an updated TDPUD Sphere of
Influence (either LAFCo-recommended or District -preferred). Neither of the proposed SOI
updates (LAFCo-recommended or TDPUD-preferred) would specifically implement or directly
result in the construction of any new facilities at this time. Neither Nevada County LAFCo nor the
TDPUD has any land use regulatory authority within the Sphere of Influence area. The jurisdiction
for land use matters for all of the land areas within the proposed SOI would remain with either
Nevada County, Sierra County, Placer County, or the Town of Truckee, and neither Nevada
County LAFCo nor the TDPUD has the authority to facilitate future development in a manner
different than is currently outlined by these jurisdictions in their applicable general plans.
However, the establishment of a new SOI is the first step in a series of actions that could provide
water and electrical service to land areas within the Town of Truckee, Placer County, Sierra
County and Nevada County that could support growth and development consistent with these
agencies' general plans and any development approvals currently in place.
CEQA Guidelines Section 15126.2(b) requires an EIR to discuss unavoidable significant
environmental effects, including those that can be mitigated but not reduced to a level of
insignificance. Of the potential environmental impacts discussed in the DEIR, three are
considered significant and unavoidable.
Sphere of Influence Update - Truckee Donner Public Utility District Nevada County LAFCo
Draft Environmental Impact Report February 2013
ES-2
Attachment 2
ES EXECUTIVE SUMMARY
TABLE ES-1
SUMMARY OF IMPACTS AND MITIGATION MEASURES
Level of
Impact' `
Significance
Mitigation Measure
Resulting Level
Without
of Significance
Mitigation
Land Use
Impact 3.1.1 The LAFCo-recommended and TDPUD-
LS (LAFCo-
MM 3.1.1 Should Nevada County LAFCo wish to adopt
LS
preferred update of the Sphere of Influence
recommended
the TDPUD-preferred Sphere of Influence for
for the TDPUD would not conflict with
only)
electric and water services, the sphere of
local agency land use policies or
PS (TDPUD-
influence plan shall include a policy that
regulations. However, the TDPUD-
preferred SOI
annexations will be approved only when the
preferred SOI update (electric and water)
electric and
land use designation of the subject territory
would conflict with Nevada County LAFCo
water)
indicates development potential that requires
policies related to the extent of the SOI
the support of water and/or electrical service.
boundaries. This impact is potentially
significant for the TDPUD-preferred SOI
update for both electric and water service.
Impact 3.1.2 The proposed update of the Sphere of
LCC
None required.
LCC
Influence for the TDPUD would not
conflict with local agency land use policies
or regulations. The proposed project would
also not contribute to any consistency
issues associated with applicable land use
policies and regulations (except for the
project -specific effect identified and
addressed under Impact 3.1.1).
Climate Change and Greenhouse Gases
Impact 3.2.1 The proposed project could result in a net
CC
None available.
SU
increase in greenhouse gas emissions and
could result in a significant impact on the
environment.
Impact 3.2.2 Implementation of the proposed project
LCC
None required.
LCC
could result in a net increase in greenhouse
gas emissions, yet would not conflict with
S — Significant CC — Cumulatively Considerable LS — Less Than Significant SU — Significant and Unavoidable NI — No Impact
PS — Potentially Significant LCC — Less than Cumulatively Considerable CS — Cumulatively Significant SM — Significant but Mitigatable
Sphere of Influence Update — Truckee Donner Public Utility District
Draft Environmental Impact Report
ES-3
Nevada County LAFCo
February 2013
Attachment 2
ES EXECUTIVE SUMMARY
Level of
Impact
Significance
Mitigation Measure
Resulting Level
Without
of Significance
Mitigation
the goals of AB 32, and thus would not
result in a significant impact on the
environment.
Secondary Environmental Effects of the Project
Impact 3.3.1 The proposed update of the Spheres of
S
None available.
SU
Influence for the TDPUD would establish
land areas eligible for future annexation
into the District and the provision of water
and electric service. The potential future
annexation and service provision by the
TDPUD set forth by the establishment of
the new SOls could induce growth or a
concentration of population that may result
in physical environmental impacts.
Impact 3.3.2 The proposed project, along with all
CC
None available.
SU
existing, approved, proposed, and
reasonably foreseeable development in
Nevada County, could induce growth or a
concentration of population that may result
in physical environmental impacts.
S — Significant CC — Cumulatively Considerable LS — Less Than Significant SU — Significant and Unavoidable NI — No Impact
PS — Potentially Significant LCC — Less than Cumulatively Considerable CS — Cumulatively Significant SM — Significant but Mitigatable
Sphere of Influence Update — Truckee Donner Public Utility District
Draft Environmental Impact Report
ES-4
Nevada County LAFCo
February 2013