Loading...
HomeMy WebLinkAbout10, Draft EIR - NCLAFCoWorkshop Item #lo Nevada County LAFCo Draft Environmental Impact Report (EIR) March 6, 2013 Background / History • Original Proposed Sphere of Influence (SOI) report received May 2011 • Prior to adoption of a SOI — Protracted negotiations — Many staff hours and meetings — Nevada County LAFCo — Litigation filed on September 20, 2011 — Litigation resolved on December 15, 2011 — LAFCo agreed to rework the EIR — Pacific Municipal Consultants (PMC) hired — Revised Draft EIR received on February 7, 2013 2 New Information • District received updated Draft EIR February 7, 2013 • Currently in the 45 day review period — February 6 — March 25, 2013 — Currently under review by staff — Public Meeting March 21, 2013 at 10:00am at Town Hall • Tonight's presentation by — SR Jones, LAFCo Executive Director — Pat Angell, PMC representative 3 A PRESENTATION TO Truckee Donner Public Utility District Board of Directors Truckee Donner Public Utility District (TDPUD) Sphere Influence (SOI) Update DRAFT EIR Public Comments Purpose of Tonight's Presentationx • Provide an overview of the environmental review process for Truckee Donner Public Utility District Sphere of Influence (SOI) Update project • Provide an opportunity for the District, the public, and interested persons to provide comments regarding the adequacy of the environmental analysis in the Draft EIR • Provide an opportunity for questions and answers Sphere of Influence Update EIR for the Truckee Donner Public Utility District (TDPUD) Projects CEQA Progression x • Notice of Preparation — June 29, 2012 • Scoping Meeting — July 26, 2012 • Notice of Availability — February 6, 2013 • Workshop to Receive Draft EIR Comments — March 6, 2013 • End of Draft EIR Comment Period — March 25, 2013 • Preparation of Final EIR — to follow • Consideration of Project & EIR — May 2013 Sphere of Influence Update EIR for the Truckee Donner Public Utility District (TDPUD) Project Description • The project is the update of the Truckee Donner Public Utility District Sphere of Influence • The EIR reviews two boundary options for the water service sphere as well as the electrical service sphere in equal level of detail: • The LAFCo - Recommended Option • The District - Preferred Option • The EIR will support a decision by the Commission to adopt either option. Existing TDPUD SOI and Service Area a�lPln ',�, � I�waa&a-aam'gtlw�alYn �. I�u�ln�w•:u. v Irr�.,'m�,,%72IriS2Ar r0/lira II NpMi%.mruu Al ; a i i u n ly i �ir�ureri 1 � r,.ro„re- I. 7an�1 " � �,�`' s � ✓ / °J"m �� ✓ � a �.ar�. r'°a #°' ;'" � °�� �,, ",' ",.. .+> ,% / / �" II ,.. l+ rz u �ro Ylrvas I ✓ .. � � u. �r%w, � r �,,,. u.�.�.rmnWrw�iww�r;wrowrwsi� rr,✓iwKr,'�s�wlio�m;r,�u�2!iNM1i e .1 �.� �' b Y X , � a m r"��, . ,1 � mmvis�rrwu�m�ea� Place), qeq Count Mw. ` The Cvdm, �� are. "r m.rr 1 arlrr 1 Legend 1M Truckee Donner Public l_Itilliity District 1 Existing TDPUD Sphere of Influence ruckee Town Limit Sphere of Influence Update EIR for the Truckee Donner Public Utility District (TDPUD) LAFCo Recommended SOI ^ar d a C o un ty, I-- �, �� ram, " ✓ ✓ IMF 11 ��y J &aq&t3iliVl'� »�Ub SEE INSET ....� ogllm 2 rk4w. ffP n5n�ali jftwi"&'(nOlr Iq�y 1ff Yr/ ` IFIu���anurr. 1I✓ rw ..r � �i _. 1114 r "�^, wWiunG!2mH r/� k Ai nd t� r� " T� CIO( Placer, Count,y Legend r � Truckee Donner Public Utility Distriict �b P`b,rrrn u.11>r Truckee Town) L'on�Ilt (15 Sphere of Influence .,;. Near -term SO11 r N Long-term 5 1 area of Concern 5ovow Vrvra hM1ala«6;. 2W Cxmjrrry 2ff lv*vatic PCB TrucW.w oSaiinkaffor DY'smim °.c= ^�✓r°. _, Sphere of Influence Update EIR for the Truckee Donner Public Utility District (TDPUD) TDPUD Preferred Electrical Service SOI Sphere of Influence Update E|Rfor the Truckee Donner Public Utility District( DPU D) TDPUD Preferred Water Service SOI e " /Oo %/ r //V OF oll NO 011 / ymor�y / �/%� � /�/, �%/ % / /////�///.,//�� / /��/ r/i // /l/JIFF /// / /�/r� �/ ! Ju ":.w ! ry r+J,"" / ��� Y 6 HIH E /� �r/!'' q / v� ///%///�� / :. J f4 r //�j/, /raR/ / ���� ,..��/ir''� �: VV I�J,n,,"iy, ��d Or / // �� /„s"a„✓"j/°lF'J/l�llrwr D4�a ��r,H 4 y, "@Muraar.wM LL,ruPo;;a^w Hb.rd iw{,.i�„,°' °'.Y,' I�`" J % 'S" wmm, / i H / /i iOl///%i F,' ��i rM%«'"• // jell "/�, / r k 4 j �%/ „�, "" Z""y /',J l/I���"'�%"N �U✓" �''b .w'y^ Amdl a ti m� rl ro/i j Z'% 1011 p, '' ' m %i / v / AVIV Legend JN „ //% ` ��%G/// / //, ✓%� of , ;% a Nwtstw Caruurwrm " u rw+ s, ' o/ /� / �/ „ /%�/,.:, //,/ .,/ � �///%ia�i/"„ . .� �i� „/%i/' ail i✓�Hm��� ,,,,,,,,,.. //., , , , , ,.,. , mw�rrlwe: rruch:�e�a Cmmrm:+�:�vev c avnara�� Gr7Cwi!c¢ EIR Approach The sphere update will designate areas eligible for annexation and service by TDPLID, and may therefore facilitate development within these areas at the level allowed by the General Plan. • General Plan EIRs have analyzed the environmental impacts of development for these areas. • LAFCo's EIR relies upon the analysis and conclusions of the EIRs prepared and certified for the General Plans of the Town of Truckee, Nevada County, and Placer County (Martis Valley CP), and the Sierra County General Plan. Sphere of Influence Update EIR for the Truckee Donner Public Utility District (TDPUD) EIR Approach (continued) The Sphere Update will not: • Specifically implement or directly result in construction of new facilities. • Change any of the current land use designations. The Sphere Update will: • Establish areas eligible for future annexation and service by TDPUD • May facilitate development within these areas at the level allowed by the applicable General Plan. Sphere of Influence Update EIR for the Truckee Donner Public Utility District (TDPUD) Potentially Significant and/or Significant Impacts The EIR finds that the project (the sphere may result in Significant and Unavoidable in these areas: update) Impacts • Climate Change and Greenhouse Gases (cumulative emissions); and, • Secondary Environmental Effects (growth and concentration of population inducement). Climate Change By creating areas eligible for annexation a n d services, the sphere update may result in development that could: ® Result in a net increase in greenhouse gas emissions a n d could result in a significant impact on t h e environment. (impact 3. 2. 1) Sphere of Influence Update E|Rfor the Truckee Donner Public Utility District( DPU D) Secondary Environmental Effects Growth and development allowed by the General Plans may result in environmental impacts of induced growth. These are considered Secondary Environmental Effects by the EIR. Note — The Draft EIR identifies that the proposed SOIs would not result in any new or greater growth impacts than were disclosed in the general plan EIRs. • By establishing land areas eligible for annexation and provision of water and/or electrical services by the District, the sphere update could induce growth or population concentration that may result in physical environmental impacts. (Impact 3.3.1) • The proposed project, along with all existing, approved, proposed, and reasonably foreseeable development in Nevada, Placer, and/or Sierra counties, could induce growth or a concentration of population that may result in physical environmental impacts. (Impact 3.3.2) Sphere of Influence Update EIR for the Truckee Donner Public Utility District (TDPUD) Project Alternatives Evaluated CEQA requires that an EIR describe a range of reasonable alternatives to the project. Section 4.0, Project Alternatives, provides a qualitative analysis of three scenarios: *Alternative 1 — No Project Alternative *Alternative 2 —Combined Sphere of Influence Area *Alternative 3 — Northstar Only *Alternative 4 —Reduced Stampede Reservoir Area Sphere of Influence Update EIR for the Truckee Donner Public Utility District (TDPUD) Next Steps: The Final EIR • Written comments will be responded to in writing, which will be part of the Final EIR • Responses to comments on the Draft EIR will be available at least 10 days prior to LAFCo's consideration of certification of the Final EIR • LAFCo Commission will consider certification of the Final EIR and adoption of the sphere update (either the TDPUD Preferred or LAFCo Recommended option) at a noticed Public Hearing Sphere of Influence Update EIR for the Truckee Donner Public Utility District (TDPUD) Next Steps: Comment on the Draft EIR • Provide comments at today's meeting • Comment in writing to: SR Jones Nevada County Local Agency Formation Commission 950 Maidu Avenue Nevada City, CA 95959 • Draft EIR is available at: — Nevada County LAFCo Offices — Online at: www.mynevadacounty.com/lafco • Comment period closes March 25, 2013 Sphere of Influence Update EIR for the Truckee Donner Public Utility District (TDPUD) Fiscal Impact • There is no fiscal impact associated with this workshop item 901 Recommendation Review and provide comment on this report 21