HomeMy WebLinkAbout10, Draft EIR - NCLAFCoWorkshop Item #lo
Nevada County LAFCo Draft
Environmental Impact Report
(EIR)
March 6, 2013
Background / History
• Original Proposed Sphere of Influence (SOI) report received
May 2011
• Prior to adoption of a SOI
— Protracted negotiations
— Many staff hours and meetings
— Nevada County LAFCo
— Litigation filed on September 20, 2011
— Litigation resolved on December 15, 2011
— LAFCo agreed to rework the EIR
— Pacific Municipal Consultants (PMC) hired
— Revised Draft EIR received on February 7, 2013
2
New Information
• District received updated Draft EIR February 7, 2013
• Currently in the 45 day review period
— February 6 — March 25, 2013
— Currently under review by staff
— Public Meeting March 21, 2013 at 10:00am at Town Hall
• Tonight's presentation by
— SR Jones, LAFCo Executive Director
— Pat Angell, PMC representative
3
A PRESENTATION TO
Truckee Donner Public Utility District
Board of Directors
Truckee Donner Public Utility
District (TDPUD) Sphere
Influence (SOI) Update
DRAFT EIR
Public Comments
Purpose of Tonight's Presentationx
• Provide an overview of the environmental
review process for Truckee Donner Public
Utility District Sphere of Influence (SOI)
Update project
• Provide an opportunity for the District, the
public, and interested persons to provide
comments regarding the adequacy of the
environmental analysis in the Draft EIR
• Provide an opportunity for questions and
answers
Sphere of Influence Update EIR for the Truckee Donner Public Utility District (TDPUD)
Projects CEQA Progression x
• Notice of Preparation — June 29, 2012
• Scoping Meeting — July 26, 2012
• Notice of Availability — February 6, 2013
• Workshop to Receive Draft EIR Comments —
March 6, 2013
• End of Draft EIR Comment Period — March 25,
2013
• Preparation of Final EIR — to follow
• Consideration of Project & EIR — May 2013
Sphere of Influence Update EIR for the Truckee Donner Public Utility District
(TDPUD)
Project Description
• The project is the update of the Truckee
Donner Public Utility District Sphere of
Influence
• The EIR reviews two boundary options for the
water service sphere as well as the electrical
service sphere in equal level of detail:
• The LAFCo - Recommended Option
• The District - Preferred Option
• The EIR will support a decision by the
Commission to adopt either option.
Existing TDPUD SOI and Service Area
a�lPln
',�, � I�waa&a-aam'gtlw�alYn �. I�u�ln�w•:u.
v Irr�.,'m�,,%72IriS2Ar r0/lira II NpMi%.mruu Al
;
a i i u n ly
i �ir�ureri 1
� r,.ro„re- I. 7an�1 " � �,�`' s � ✓ / °J"m �� ✓ � a �.ar�. r'°a #°' ;'" � °�� �,, ",' ",.. .+> ,% / / �" II ,..
l+
rz u
�ro Ylrvas
I
✓ .. � � u. �r%w, � r �,,,. u.�.�.rmnWrw�iww�r;wrowrwsi�
rr,✓iwKr,'�s�wlio�m;r,�u�2!iNM1i e .1 �.� �' b Y X , � a m r"��, . ,1 � mmvis�rrwu�m�ea�
Place),
qeq Count
Mw. `
The Cvdm, �� are. "r m.rr 1 arlrr
1 Legend
1M Truckee Donner Public l_Itilliity District
1 Existing TDPUD Sphere of Influence
ruckee Town Limit
Sphere of Influence Update EIR for the Truckee Donner Public Utility District (TDPUD)
LAFCo Recommended SOI
^ar
d a C o un ty,
I-- �, �� ram, " ✓ ✓
IMF
11
��y J &aq&t3iliVl'� »�Ub
SEE INSET ....� ogllm 2 rk4w. ffP
n5n�ali
jftwi"&'(nOlr Iq�y
1ff Yr/
` IFIu���anurr.
1I✓ rw ..r � �i _.
1114 r
"�^, wWiunG!2mH r/� k Ai nd
t� r�
" T�
CIO(
Placer, Count,y
Legend
r �
Truckee Donner Public Utility Distriict
�b P`b,rrrn u.11>r Truckee Town) L'on�Ilt
(15
Sphere of Influence
.,;. Near -term SO11
r N Long-term 5 1
area of Concern
5ovow Vrvra hM1ala«6;. 2W Cxmjrrry 2ff lv*vatic PCB TrucW.w oSaiinkaffor DY'smim °.c= ^�✓r°. _,
Sphere of Influence Update EIR for the Truckee Donner Public Utility District (TDPUD)
TDPUD Preferred Electrical Service SOI
Sphere of Influence Update E|Rfor the Truckee Donner Public Utility District( DPU D)
TDPUD Preferred Water Service SOI
e " /Oo
%/ r
//V
OF
oll NO
011
/
ymor�y
/ �/%�
� /�/, �%/ % / /////�///.,//�� / /��/ r/i
//
/l/JIFF
/// /
/�/r�
�/ ! Ju
":.w ! ry r+J,"" / ��� Y 6 HIH E /� �r/!'' q
/ v� ///%///�� / :. J f4
r
//�j/, /raR/ / ���� ,..��/ir''� �: VV I�J,n,,"iy, ��d Or / // �� /„s"a„✓"j/°lF'J/l�llrwr D4�a ��r,H 4 y, "@Muraar.wM LL,ruPo;;a^w Hb.rd iw{,.i�„,°' °'.Y,' I�`" J % 'S" wmm, / i
H
/ /i
iOl///%i
F,'
��i rM%«'"•
//
jell "/�,
/ r
k 4
j
�%/ „�, "" Z""y /',J l/I���"'�%"N �U✓" �''b .w'y^
Amdl
a
ti m� rl ro/i j Z'%
1011
p,
'' '
m
%i / v /
AVIV
Legend JN
„ //% ` ��%G/// / //, ✓%� of , ;%
a
Nwtstw Caruurwrm " u rw+ s, ' o/ /� / �/ „ /%�/,.:,
//,/ .,/ � �///%ia�i/"„ . .� �i� „/%i/' ail i✓�Hm��� ,,,,,,,,,.. //., , , , , ,.,. ,
mw�rrlwe: rruch:�e�a Cmmrm:+�:�vev c avnara�� Gr7Cwi!c¢
EIR Approach
The sphere update will designate areas eligible for
annexation and service by TDPLID, and may
therefore facilitate development within these areas
at the level allowed by the General Plan.
• General Plan EIRs have analyzed the environmental
impacts of development for these areas.
• LAFCo's EIR relies upon the analysis and conclusions of
the EIRs prepared and certified for the General Plans of
the Town of Truckee, Nevada County, and Placer
County (Martis Valley CP), and the Sierra County
General Plan.
Sphere of Influence Update EIR for the Truckee Donner Public Utility District (TDPUD)
EIR Approach (continued)
The Sphere Update will not:
• Specifically implement or directly result in construction of new
facilities.
• Change any of the current land use designations.
The Sphere Update will:
• Establish areas eligible for future annexation and service by
TDPUD
• May facilitate development within these areas at the level allowed
by the applicable General Plan.
Sphere of Influence Update EIR for the Truckee Donner Public Utility District (TDPUD)
Potentially Significant
and/or Significant Impacts
The EIR finds that the project (the sphere
may result in Significant and Unavoidable
in these areas:
update)
Impacts
• Climate Change and Greenhouse Gases
(cumulative emissions); and,
• Secondary Environmental Effects (growth and
concentration of population inducement).
Climate Change
By
creating
areas
eligible for annexation a n d services,
the
sphere
update
may result
in development
that
could:
® Result in a net increase in greenhouse gas emissions
a n d could result in a significant impact on t h e
environment. (impact 3. 2. 1)
Sphere of Influence Update E|Rfor the Truckee Donner Public Utility District( DPU D)
Secondary Environmental Effects
Growth and development allowed by the General Plans may result in
environmental impacts of induced growth. These are considered
Secondary Environmental Effects by the EIR. Note — The Draft EIR
identifies that the proposed SOIs would not result in any new or
greater growth impacts than were disclosed in the general plan
EIRs.
• By establishing land areas eligible for annexation and provision of
water and/or electrical services by the District, the sphere update
could induce growth or population concentration that may result in
physical environmental impacts. (Impact 3.3.1)
• The proposed project, along with all existing, approved, proposed,
and reasonably foreseeable development in Nevada, Placer, and/or
Sierra counties, could induce growth or a concentration of
population that may result in physical environmental impacts.
(Impact 3.3.2)
Sphere of Influence Update EIR for the Truckee Donner Public Utility District (TDPUD)
Project Alternatives Evaluated
CEQA requires that an EIR describe a range of
reasonable alternatives to the project.
Section 4.0, Project Alternatives, provides a qualitative
analysis of three scenarios:
*Alternative 1 — No Project Alternative
*Alternative 2 —Combined Sphere of Influence Area
*Alternative 3 — Northstar Only
*Alternative 4 —Reduced Stampede Reservoir Area
Sphere of Influence Update EIR for the Truckee Donner Public Utility District (TDPUD)
Next Steps: The Final EIR
• Written comments will be responded to in
writing, which will be part of the Final EIR
• Responses to comments on the Draft EIR will be
available at least 10 days prior to LAFCo's
consideration of certification of the Final EIR
• LAFCo Commission will consider certification of
the Final EIR and adoption of the sphere update
(either the TDPUD Preferred or LAFCo
Recommended option) at a noticed Public
Hearing
Sphere of Influence Update EIR for the Truckee Donner Public Utility District (TDPUD)
Next Steps: Comment on the Draft EIR
• Provide comments at today's meeting
• Comment in writing to:
SR Jones
Nevada County Local Agency Formation Commission
950 Maidu Avenue
Nevada City, CA
95959
• Draft EIR is available at:
— Nevada County LAFCo Offices
— Online at: www.mynevadacounty.com/lafco
• Comment period closes March 25, 2013
Sphere of Influence Update EIR for the Truckee Donner Public Utility District (TDPUD)
Fiscal Impact
• There is no fiscal impact associated with this workshop item
901
Recommendation
Review and provide comment on this report
21