Loading...
HomeMy WebLinkAbout9, Donner View Hydro StationWorkshop Item # 9 Discussion of the District's Donner View Hydropneumatic Pump Station Rebuild Project March 6, 2013 Background / History • District's hydropneumatic and booster stations — Constructed in the 1970s — At the end of their useful life — Donner View Hydropneumatic Station was built in 1972 — Provides water for Donner View Hydro Zone — Also used for communications • Last pump station replacement was in 2010 2 3 0 New Information • New pump station construction: — New block building — Undergrounding of the overhead electric service — Majority of the construction work performed by District labor — Block building work and roofing system by contract labor — Dedicated space for communications equipment • New pumping system — Incorporate variable frequency drive (VFD) units — Utilize high efficiency pumps and motors — Provide increased fire flow 5 New pump station will be built on the same property r ..w VI A�id�ar ree '1 I Ile r Don ner VuewW S � „d �� ZN, �r-- Way Ski slope WVay --- W a 7 Typical New Pump Station i $ Typical VFD Pump System New Information • Project and planning schedule: — Project design - March, 2013 — Advertise for bids - April, 2013 — Award bid - May, 2013 — Begin construction - May, 2013 — Complete project - Spring, 2014 • Old station to remain during construction — Will be demolished after cut over Fiscal Impact • Project not included in FY13 budget approved by Board • Proposed funding sources — Water Department Capital Replacement Fund — Conservation Department Wire to Water — Sufficient funds exist in both these accounts • $325,000 is the estimated cost for the project Recommendation Receive this report and provide comment 11