Loading...
HomeMy WebLinkAbout13-Consideration of Awarding a Contract for the 2013 Water Pipeline Replacement ProjectAgenda Public Utility D ACTION 13 To: Board of Directors From: Neil Kaufman Date: April 03, 2013 Subject: Consideration of Awarding a Contract for the 2013 Water Pipeline Replacement Project 1. WHY THIS MATTER IS BEFORE THE BOARD Board approval is required for expenditures in excess of $15,000. 2. HISTORY The District's last pipeline replacement project occurred in 2010. Since that time, there have been a number of pipeline segments where it has been necessary to perform repeated repairs. The planned construction for 2013 entails about 2,300 feet of main line pipe located at five separate locations in Tahoe Donner. Due to uncertainties with the currently bidding climate, the bidding documents were structured as a base bid with one additive alternate. Item Location Base Bid Davos Drive at Heidi Way Northwoods Blvd at Norse Avenue Northwoods Blvd above Chamonix Road Northwoods Blvd at Coyote Moon Golf Course Additive Alternate A Northwoods Blvd at Viking Way An overview of this project was presented to the Board of Directors at the March 6 Board meeting. As discussed at that meeting, the Water Department has allocated $500,000 for the construction contract portion of the project. Other outside costs will be incurred for geotechnical testing and environmental services during the construction period. internal labor costs associated with construction inspection will also be incurred. 3. NEW INFORMATION The bid opening for Contract A was held at 9:00 AM on March 25, 2013. Ten bids were received. A summary of the bids is given below: BASE BID ONLY Bidder Location Amount Responsive A&K Earthmovers Sparks, NV $368,969.22 Yes Granite Construction Sparks, NV $378,378.00 Yes Hansen Brothers Grass Valley, CA $444,354.65 Yes Campbell Construction Sparks, NV $461,736.00 Yes Vulcan Construction Fresno, CA $509,726.00 Yes Sierra Valley Construction Roseville, CA $535,143.81 Yes Lorang Brothers Colfax, CA $537,175.00 No Sierra National Construction Carmichael, CA $543,988.00 Yes AM-X Construction & Excavation Truckee, CA $575,943.80 Yes Pfister Excavating Vallejo, CA $606,005.00 Yes BASE BID WITH ADDITIVE ALTERNATE A Bidder Location Amount Responsive A&K Earthmovers Sparks, NV $489,714.22 Yes Granite Construction Sparks, NV $498,498.00 Yes Hansen Brothers Grass Valley, CA $596,847.65 Yes Campbell Construction Sparks, NV $632,326.00 Yes Vulcan Construction Fresno, CA $691,840.00 Yes Lorang Brothers Colfax, CA $733,612.00 No Sierra Valley Construction Roseville, CA $741,094.98 Yes Sierra National Construction Carmichael, CA $768,868.00 Yes AM-X Construction & Excavation Truckee, CA $786,586.80 Yes Pfister Excavating Vallejo, CA $836,205.00 Yes As shown in the tables, A&K Earthmovers is the low bidder under both the "Base Bid" and the "Base Bid with Additive Alternate A" options. A&K Earthmovers has previously performed work in the Truckee area and constructed a relatively small conduit and pipeline project for the District in 2007. The work of A&K Earthmovers on that project was satisfactory and no major issues arose during the course of the project. 4. FISCAL IMPACT As noted above, the Water Department has allocated $500,000 for the construction contract. Considering that the low bid from A&K Earthmovers for the "Base Bid with Additive Alternate A" option is just under $490,000, it is recommended that the Districl proceed with this additional work. It is recognized that the final construction cost could exceed $500,000 once change orders are considered. 5. RECOMMENDATION Award the District Pipeline Replacement - 2013 to A&K Earthmovers in the amount of $489,714.22 plus a 10 percent change order allowance for a total amount not to exceed $538,700. Michael D. Holley General Manager / Water Utility Manager