20-3 Attch3-SCADA1
Analysis of Bid vs. Actual Quantities Constructed SCADA Reliability Imrpovement Project Contractor: Curtis and Sons Construction, Inc. Bid Item Description Bid Amounts Qty Units Unit Price Subtotal Actual Amounts Qty Units Unit Price Subtotal 1 Mobilization 1 LS $ 2,000.00 $ 2,000.00 1 LS $ 2,000.00 $ 2,000.00 2 12ct Loose Tube Fiber Optic 2,600 FT $ 1.94 $ 5,044.00 2,390 FT $ 1.94 $ 4,636.60 Cable in Existing Conduit 3 48ct Loose Tube Fiber Optic 7,200 FT $ 2.39 $ 17,208.00 7,376 FT $ 2.39 $ 17,628.64 Cable in Existing Conduit 4 96ct Loose Tube Fiber Optic 17,200 FT $ 3.01 $ 51,772.00 17,553 FT $ 3.01 $ 52,834.53 Cable in Existing Conduit 5 216ct Loose Tube Fiber Optic 10,200 FT $ 3.89 $ 39,678.00 10,144 FT $ 3.89 $ 39,460.16 Cable in Existing Conduit 6 12ct Loose Tube Fiber Optic 470 FT $ 8.95 $ 4,206.50 514 FT $ 8.95 $ 4,600.30 Cable- Aerial Installation 7 3/4 inch Innerduct in Existing 34,000 FT $ 1.22 $ 41,480.00 34,000 FT $ 1.22 $ 41,480.00 Conduit 8 Splice Closure, Large 288 Splice 5 EA $ 2,264.00 $ 11,320.00 5 EA $ 2,264.00 $ 11,320.00 Capacity 9 Splice Closure, Medium 192 6 EA $ 2,187.00 $ 13,122.00 6 EA $ 2,187.00 $ 13,122.00 Splice Capacity 10 Splice Closure, Small 96 Splice 2 EA $ 1,580.00 $ 3,160.00 2 EA $ 1,580.00 $ 3,160.00 Capacity 11 Fusion Splices 1,350 EA $ 5.00 $ 6,750.00 1,330 EA $ 5.00 $ 6,650.00 12 Termination Equipment - Data 1 LS $ 9,822.00 $ 9,822.00 1 LS $ 9,822.00 $ 9,822.00 Center at District Offices 13 Termination Equipment - 1 LS $ 7,149.00 $ 7,149.00 1 LS $ 7,149.00 $ 7,149.00 Truckee Substation 14 Termination Equipment - Martis 1 LS $ 6,309.00 $ 6,309.00 1 LS $ 6,309.00 $ 6,309.00 Valley Substation 15 Termination Equipment - 1 LS $ 4,140.00 $ 4,140.00 1 LS $ 4,140.00 $ 4,140.00 Glenshire Drive Well 16 Termination Equipment - Old 1 LS $ 4,140.00 $ 4,140.00 1 LS $ 4,140.00 $ 4,140.00 Greenwood Well 17 Fiber Testing 1 LS $ 51,853.00 $ 51,853.00 1 LS $ 51,853.00 $ 51,853.00 18 All Other Work Required by the 1 LS $ 500.00 $ 500.00 1 LS $ 500.00 $ 500.00 Contract Documents Total I $279,653.50II Total I $280,805.2]