HomeMy WebLinkAbout7,Water Master Plan Public Hearing Public Hearing Item # 7 April 4, 2012 Draft 2012 Water Master PlanPublic Hearing on the Public Hearing on the 2 recommendations regarding Connection Fees and Facility FeesDevelop cost estimates for needed improvements and provide –conditionsIdentify facilities needed to serve future growth up to buildout –improvements to correct those deficiencies Identify any deficiencies with the existing water system and –Document the existing water system–Purpose of Master Plan•Background / History Draft 2012 Water Master Plan Public Hearing on the 3 Water Master Plan requires a CEQA review•March 7, 2012Draft of 2012 Master Plan Update presented to Board on •Current Water Master Plan adopted in 2004•Background / History Draft 2012 Water Master Plan Public Hearing on the 4 No comments received to date•on March 14, 2012Notice regarding the public hearing advertised in Sierra Sun •New Information Draft 2012 Water Master Plan Public Hearing on the 5–Existing System as of December 31, 2010–Scope of the Study–Background & History–Introduction–Section 1 •New Information Draft 2012 Water Master Plan Public Hearing on the 6 Cost estimating criteria–Storage requirements–Pipeline velocity & head loss–System pressures–System Planning Criteria–Section 2 •New Information Draft 2012 Water Master Plan Public Hearing on the 7 Pipelines–Control valve stations–Storage tanks–Pumping stations–Other supply sources–Treatment facilities–Wells–Pressure zones–Brief discussions with summary tables and maps–Existing Water Facilities–Section 3 •New Information Draft 2012 Water Master Plan Public Hearing on the 8 Potable Maximum Day Demand = 20.3 mgd–Potable Average Day Demand = 10.1 mgd–Buildout:–Potable Maximum Day Demand = 9.53 mgd–Potable Average Day Demand = 4.53 mgd–2010:–Population & Water Demands–Section 4 •New Information Draft 2012 Water Master Plan Public Hearing on the 9 Scheduled for completion in 2012–New groundwater study by Brown and Caldwell underway–Withdrawals for year 2010: 7,175 AFY–year (AFY)feet per -Prior studies determined sustainable yield of 24,000 acre–Groundwater from Martis Valley Groundwater Basin–Water Supplies–Section 5 •New Information Draft 2012 Water Master Plan Public Hearing on the 10 Eight additional wells needed at buildout (850 gpm each)–Firm production capacity: 10.9 mgd–Existing production capacity: 14.0 mgd–Buildout demand: 20.3 mgd–Year 2010 demand: 9.53 mgd–Potable Water Production Capacity–Section 5 •New Information Draft 2012 Water Master Plan Public Hearing on the 11 38 recommended improvements–Pipeline replacement needs–Some additional storage needed–Some areas of inadequate fire flow–Some transmission pipelines are too small–Areas of high and low service pressure–Existing System Evaluation–Section 6 •New Information Draft 2012 Water Master Plan Public Hearing on the 12 Additional pressure reducing stations–Additional pump stations–Additional storage–Second pipeline to Tahoe Donner–Eight new wells–Future System Evaluation and Layout–Section 7 •New Information Draft 2012 Water Master Plan Public Hearing on the 13 fundingActual year will vary based upon future growth and available –Assumed year of construction for projects–Total cost of $93 million–$40 million from Facility Fees–$28 million from rates–Construction cost of $68 million–Cost estimates for future projects ––Section 8 •New Information Draft 2012 Water Master Plan Public Hearing on the 25.4%-$1.61/sq. ft.$2.02/sq. ft.$1.64/sq. ft.Residential 5.4%$4,365$4,140$3,358(3/4” meter)Commercial for InflationAdjusted% ChangeFacility FeeProposed InflationAdjusted for Current Fee Facility FeeCurrent Item 14 Minor increase in Connection Fees–Increase commercial by about 30 percent–$1.61/ square footReduce residential Facility Fees from $1.64/square foot to –Cost impact of proposed CIP–Financial Impacts–Section 9 •New Information Draft 2012 Water Master Plan Public Hearing on the 15 Adoption of ordinance to adjust Facility Fees–September 5, 2012 –Public Hearing on ordinance to adjust Facility Fees–August 1, 2012 –Adoption of Master Plan–July 18, 2012 –CEQA public hearing–June 6, 2012 ––May 2, 2012 –Public hearing on Master Plan (tonight)–April 4, 2012 –Tentative Schedule•New Information Draft 2012 Water Master Plan Public Hearing on the 16 Connection Fees and Facility FeesDraft Water Master Plan recommends adjustment of both •No fiscal impact associated with this public hearing•Fiscal Impact Draft 2012 Water Master Plan Public Hearing on the 17 draft Water Master PlanConduct the public hearing to receive comment on the •Recommendation Draft 2012 Water Master Plan